Assessor Resource

AHCDRG301
Install drainage systems

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency describes the skills and knowledge required to install surface and subsurface drainage systems.

It applies to individuals who take responsibility for own work and for the quality of the work of others. They use discretion and judgement in the selection, allocation and use of available resources. All work is carried out to comply with workplace procedures.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for drainage system installation activities

1.1 Identify the construction site for the drainage system

1.2 Select materials, tools, equipment and machinery and carry out pre-operational and safety checks

1.3 Identify work health and safety hazards, assess risks and implement controls

1.4 Select, use and maintain suitable personal protective equipment

2. Co-ordinate installation work

2.1 Coordinate work tasks in a sequential, timely and effective manner

2.2 Install the drainage system with due consideration of the environmental implications

2.3 Maintain a clean and safe work area throughout work

3. Prepare the site for installation of drainage system

3.1 Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood

3.2 Identify layout of services, check depths and report discrepancies

3.3 Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system

4. Undertake installation of drainage system

4.1 Complete excavations without damage to services, facilities, features and established plants

4.2 Install the drainage system

4.3 Test the drainage system for configuration, flow rates and capacity

4.4 Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications

5. Complete installation of drainage system

5.1 Finish earthworks

5.2 Restore the site and remove and dispose of waste material

5.3 Clean, maintain and store tools, equipment and machinery

5.4 Record work outcomes and report the works as per the executed drawings, including adjustments

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

install drainage system works

interpret drainage system plans and drawings

interpret site specifications, soil types and drainage system plans

level and align earthworks

measure materials required to install drainage systems

prepare for installation activities

set out drainage system works

set out, survey, test and excavate the installation site

test the drainage system

use equipment, tools and machinery appropriate to the scope of works

The candidate must demonstrate knowledge of:

principles and practices of drainage installation

drain types, components and installation techniques

soil characteristics and their impact on drainage systems

purposes of drainage systems and the application of drainage system plans to the physical situation

work health and safety

Assessors must satisfy current standards for RTOs.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for drainage system installation activities

1.1 Identify the construction site for the drainage system

1.2 Select materials, tools, equipment and machinery and carry out pre-operational and safety checks

1.3 Identify work health and safety hazards, assess risks and implement controls

1.4 Select, use and maintain suitable personal protective equipment

2. Co-ordinate installation work

2.1 Coordinate work tasks in a sequential, timely and effective manner

2.2 Install the drainage system with due consideration of the environmental implications

2.3 Maintain a clean and safe work area throughout work

3. Prepare the site for installation of drainage system

3.1 Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood

3.2 Identify layout of services, check depths and report discrepancies

3.3 Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system

4. Undertake installation of drainage system

4.1 Complete excavations without damage to services, facilities, features and established plants

4.2 Install the drainage system

4.3 Test the drainage system for configuration, flow rates and capacity

4.4 Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications

5. Complete installation of drainage system

5.1 Finish earthworks

5.2 Restore the site and remove and dispose of waste material

5.3 Clean, maintain and store tools, equipment and machinery

5.4 Record work outcomes and report the works as per the executed drawings, including adjustments

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

install drainage system works

interpret drainage system plans and drawings

interpret site specifications, soil types and drainage system plans

level and align earthworks

measure materials required to install drainage systems

prepare for installation activities

set out drainage system works

set out, survey, test and excavate the installation site

test the drainage system

use equipment, tools and machinery appropriate to the scope of works

The candidate must demonstrate knowledge of:

principles and practices of drainage installation

drain types, components and installation techniques

soil characteristics and their impact on drainage systems

purposes of drainage systems and the application of drainage system plans to the physical situation

work health and safety

Assessors must satisfy current standards for RTOs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Identify the construction site for the drainage system 
Select materials, tools, equipment and machinery and carry out pre-operational and safety checks 
Identify work health and safety hazards, assess risks and implement controls 
Select, use and maintain suitable personal protective equipment 
Coordinate work tasks in a sequential, timely and effective manner 
Install the drainage system with due consideration of the environmental implications 
Maintain a clean and safe work area throughout work 
Interpret symbols and terminology to ensure the concept of the drainage system plan is clearly understood 
Identify layout of services, check depths and report discrepancies 
Complete survey, measurement and marking out of site and confirm soil characteristics relevant to the system 
Complete excavations without damage to services, facilities, features and established plants 
Install the drainage system 
Test the drainage system for configuration, flow rates and capacity 
Confirm remedial action to be taken when the drainage system operation does not meet the plan specifications 
Finish earthworks 
Restore the site and remove and dispose of waste material 
Clean, maintain and store tools, equipment and machinery 
Record work outcomes and report the works as per the executed drawings, including adjustments 

Forms

Assessment Cover Sheet

AHCDRG301 - Install drainage systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCDRG301 - Install drainage systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: