List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Element | Performance criteria |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Develop and implement construction procedures | 1.1 Develop employment and contract management procedures 1.2 Develop procedures for controlling and recording site deliveries 1.3 Develop procedures for recording the hire of plant and equipment 1.4 Determine work health and safety procedures, including risk assessment 1.5 Notify client, authorities and agencies of the schedule of works 1.6 Develop procedures for dealing with environmental issues associated with construction work |
2. Organise resource requirements | 2.1 Nominate tasks and timelines, including the required resources for each 2.2 Organise labour requirements 2.3 Verify the correct parts and equipment have been delivered to the site and checked 2.4 Select and maintain equipment and machinery 2.5 Allocate jobs and tasks to the work team 2.6 Carry out safety induction for the task and site |
3. Interpret the irrigation drainage system design for the site | 3.1 Determine the purpose, scale and required output of the irrigation system 3.2 Assess the landscape of the site 3.3 Determine construction requirements and verify with the designer 3.4 Select components to meet design specifications and site requirements |
4. Supervise preparatory work | 4.1 Interpret plan and supervise preparatory work 4.2 Take levels and plan earth works 4.3 Confirm site is cleaned and marked out 4.4 Confirm drainage structures are pegged out |
5. Supervise construction of the drainage system | 5.1 Interpret plan and supervise construction work 5.2 Confirm trenches are excavated to specification 5.3 Confirm earth works are carried out appropriately 5.4 Confirm construction of drainage structures are to specifications 5.5 Inspect the lay out and joining of pipes 5.6 Check the fitting and adjustment of fittings and valves and confirm all joints are secured 5.7 Supervise the installation and testing of the pumping system |
6. Commission the irrigation drainage system | 6.1 Start the system up 6.2 Identify operating faults and take corrective actions as required 6.3 Use testing and monitoring equipment to monitor system efficacy 6.4 Make adjustments as required |
7. Supervise the rehabilitation of the works area | 7.1 Monitor the resurfacing and sealing earthworks 7.2 Confirm the planting and maintenance of vegetation areas have been carried out 7.3 Confirm the disposal of waste and surplus materials has been carried out in an environmentally sound manner |
The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.
The candidate must provide evidence that they can:
conduct a work health and safety risk assessment
develop operational procedures
document requirements for structures
estimate quantities and volumes of soil to be moved
implement employment procedures
interpret irrigation designs
supervise workers in:
earth moving and construction procedures
power and pumping plant installation
pump and gated pipe installation
construction of canals, channels, head ditches, beds, check structures, tailwater holding ponds
The candidate must demonstrate knowledge of:
principles and practices of irrigation drainage system installation
components used in drainage systems
drainage appliances, fixtures and fittings
environmental impacts of drainage systems
environmental role of drainage systems
isolation processes and procedures
level and align site
levelling and alignment processes
measuring and monitoring procedures for factors contributing to drainage system performance
positive and negative environmental impacts of drainage systems
regulatory requirements, codes of practice and relevant enterprise service standards relating to blockage removal, disconnection and reconnection activities
soil moisture measurement procedures
types and operational parameters of drains
water authority standards and procedures
water quality monitoring methods and techniques
water table and salinity measures
Assessors must satisfy current standards for RTOs.