Assessor Resource

AHCIRG203A
Install micro-irrigation systems

Assessment tool

Version 1.0
Issue Date: April 2024


This unit applies to workers in production or amenity horticulture enterprises that operate under limited supervision and within enterprise guidelines.

This unit covers the process of installing micro-irrigation systems under routine supervision and defines the standard required to: organise equipment and materials for installation work; set out and prepare site; install and test the irrigation system; monitor effectiveness and environmental impacts of the micro-irrigation system.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

organise equipment and materials for installation work

set out and prepare site

install and test the irrigation system

monitor effectiveness and environmental impacts of the micro-irrigation system.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

identify hazards and adopt safe work practices

organise equipment and materials for installation work

set out and prepare site

install irrigation components

complete installation work

communicate with work team members, supervisors, contractors and consultants

use literacy skills to follow sequenced written instructions and record information accurately and legibly

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to relate to people from a range of social, cultural and ethnic backgrounds and with a range of physical and mental abilities.

Required knowledge

methods and techniques of micro-irrigation

components of an micro-irrigation system

characteristics and operation of joints, valves and sprinkler components

operation of pumps and water flow rates

behaviour of water on varying terrain and soil types

soil moisture testing techniques

OHS and environmental legislation and enterprise procedures.

The range statement relates to the unit of competency as a whole.

Micro-irrigation systems include:

low pressure micro-sprays

drippers.

Irrigation equipment may include:

pumps

delivery equipment

system controllers.

Water supplies may include:

underground

mains

surface storage

including fixtures such as:

dams

bores

windmills

tanks

channels.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Materials, tools, equipment and machinery are selected according to irrigation design requirements and supervisors instructions. 
The site for installation of the micro-irrigation system is identified according to enterprise plans and work procedures. 
Parts and equipment delivered to the site are checked according to system drawings and specifications. 
Water supply is checked to ensure that it is compatible with system specifications. 
Measurement and marking out of irrigation lines is undertaken as directed by supervisor. 
Equipment operation and work practices conform to enterprise and legislative Occupational Health and Safety (OHS) requirements. 
Pre-operational and safety checks are carried out on tools, equipment and machinery according to manufacturer's specifications and enterprise work procedures. 
OHS hazards are identified, risks assessed and risk controls are implemented. 
Personal Protective Equipment (PPE) is selected, used and maintained according to procedures 
Work is undertaken according to plan and supervisor's instructions. 
Components are assembled and connected according to plan, with joints completed and tested. 
A clean and safe work area is maintained while installation work is carried out. 
Tools are chosen appropriate to the task being undertaken, and used according to guidelines and safe working practices. 
Earthworks are finished off to plan specifications and enterprise work procedures. 
The site is restored and waste material is removed from the site and disposed of in an environmentally aware and safe manner according to enterprise work procedures. 
Tools, equipment and machinery are cleaned, maintained and stored according to enterprise work procedures. 
System is flushed and commissioned as directed. 
Operating faults are identified and reported to supervisor and/or corrective actions taken. 

Forms

Assessment Cover Sheet

AHCIRG203A - Install micro-irrigation systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCIRG203A - Install micro-irrigation systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: