Assessor Resource

AHCIRG218
Assist with pump and flow control device operations

Assessment tool

Version 1.0
Issue Date: March 2024


This unit of competency describes the skills and knowledge required to assist with the installation and maintenance of pumps and flow control devices for irrigation.

It applies to individuals who work under general supervision and exercise limited autonomy with some accountability for their own work. They undertake defined activities and work in a structured context.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare for work on pumping and flow control systems

1.1 Read work instructions relating to work activity and confirm with the supervisor

1.2 Prepare tools and equipment and use according to the supervisor's instructions

1.3 Select personal protective equipment and clothing and ensure correct fit

1.4 Identify manual handling and other work health and safety hazards and tell supervisor

2. Carry out installation and maintenance tasks for pumps and flow control devices

2.1 Carry out installation tasks as directed for pumps and flow control devices

2.2 Carry out routine inspections of flow control and metering facilities in irrigation systems

2.3 Carry out preventative maintenance and service of equipment and facilities

3. Review, record and report activities

3.1 Check, maintain and store equipment, tools and materials

3.2 Restore work site to meet environmental and workplace requirements

3.3 Record and report installation and maintenance activities

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

interpret plans, charts and instructions

perform work-related calculations

organise equipment and materials for installation work

use power tools and hand tools

handle materials safely

identify and respond to predictable operational problems

The candidate must demonstrate knowledge of:

principles and practices of pump and control flow devices

basic principles of hydraulics and the operation of flows

capacity and limitations of equipment used on the site

flow measurement principles and procedures

function of control systems

layout and performance of pipes and fittings

lock-out procedures for mechanical and electrical installations

types of flow control devices and their purpose

types of pumps and their function and use

Assessors must satisfy current standards for RTOs.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare for work on pumping and flow control systems

1.1 Read work instructions relating to work activity and confirm with the supervisor

1.2 Prepare tools and equipment and use according to the supervisor's instructions

1.3 Select personal protective equipment and clothing and ensure correct fit

1.4 Identify manual handling and other work health and safety hazards and tell supervisor

2. Carry out installation and maintenance tasks for pumps and flow control devices

2.1 Carry out installation tasks as directed for pumps and flow control devices

2.2 Carry out routine inspections of flow control and metering facilities in irrigation systems

2.3 Carry out preventative maintenance and service of equipment and facilities

3. Review, record and report activities

3.1 Check, maintain and store equipment, tools and materials

3.2 Restore work site to meet environmental and workplace requirements

3.3 Record and report installation and maintenance activities

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

interpret plans, charts and instructions

perform work-related calculations

organise equipment and materials for installation work

use power tools and hand tools

handle materials safely

identify and respond to predictable operational problems

The candidate must demonstrate knowledge of:

principles and practices of pump and control flow devices

basic principles of hydraulics and the operation of flows

capacity and limitations of equipment used on the site

flow measurement principles and procedures

function of control systems

layout and performance of pipes and fittings

lock-out procedures for mechanical and electrical installations

types of flow control devices and their purpose

types of pumps and their function and use

Assessors must satisfy current standards for RTOs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Read work instructions relating to work activity and confirm with the supervisor 
Prepare tools and equipment and use according to the supervisor's instructions 
Select personal protective equipment and clothing and ensure correct fit 
Identify manual handling and other work health and safety hazards and tell supervisor 
Carry out installation tasks as directed for pumps and flow control devices 
Carry out routine inspections of flow control and metering facilities in irrigation systems 
Carry out preventative maintenance and service of equipment and facilities 
Check, maintain and store equipment, tools and materials 
Restore work site to meet environmental and workplace requirements 
Record and report installation and maintenance activities 

Forms

Assessment Cover Sheet

AHCIRG218 - Assist with pump and flow control device operations
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCIRG218 - Assist with pump and flow control device operations

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: