Assessor Resource

AHCIRG417A
Supervise sprinkler irrigation maintenance

Assessment tool

Version 1.0
Issue Date: March 2024


This Unit applies to irrigation site supervisors and managers of irrigation systems who are responsible for maintenance programs for sprinkler irrigation.

This Unit covers the process of supervising a maintenance program for a sprinkler irrigation system and defines the standard required to: develop maintenance procedures; supervise maintenance of irrigation components and structures; check and service testing equipment; supervise maintenance of the irrigation area; and record and report maintenance activities.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Employability Skills

This Unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this Unit

The evidence required to demonstrate competency in this Unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

develop maintenance procedures

supervise maintenance of irrigation components and testing equipment

supervise maintenance of irrigation structures

supervise maintenance of the irrigation area

record and report maintenance activities.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills include:

Ability to:

develop enterprise procedures for pre-season, irrigation and post-season maintenance

inspect irrigation system

test irrigation equipment

service irrigation equipment

check sprinkler output and function

remove and replace valves and filters

check controllers

carry out control systems checks

supervise minor repairs of equipment

identify the need for, and schedule, major repairs or replacements

record all test results clearly and concisely with attention to detail

dispose of unused or waste materials from site in an environmentally safe and sensitive manner

identify adverse environmental impacts of irrigation activities and appropriate remedial action

implement and follow relevant enterprise OHS and environmental policies and procedures

identify OHS hazards and implement safe work procedures.

Required knowledge includes:

Knowledge of:

irrigation system components

operational and maintenance requirements

develop enterprise procedures for pre-season, irrigation and post-season maintenance

pre and post-season maintenance covering

system components

sprinkler operating pressures

sprinkler output

sprinkler distribution uniformity

pumping and distribution systems

drainage systems

visual checks for blockages or signs of wear in components

pressure testing as per procedures.

The range statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Maintenance programs may include:

preventative maintenance carried out at end of season or throughout the irrigation season, including the regular replacement of irrigation components.

Sprinkler irrigation systems may include:

describe systems that use spray or rotor type sprinklers to distribute irrigation water at higher volume including pop-up sprinklers, fixed, and movable sprinklers (e.g. K Line and Ezy Shift).

Maintenance of testing equipment may include:

replacing 'remove and replace' components; lubrication; working adjustments to tolerances; cleaning and storing; and completing usage records.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Maintenance requirements for irrigation components and structures are established 
Maintenance requirements for the irrigation site are established 
The frequency of maintenance activities required are determined and a schedule is developed 
Maintenance activities are costed out in terms of required staff, materials and equipment 
OHS risks associated with the maintenance program are assessed and suitable controls implemented 
The environmental impacts of maintenance activities are minimised 
A system for reporting maintenance activities is developed 
Maintenance checklists are developed for irrigation components 
Component operation is systematically monitored and operating faults are identified and appropriate action taken 
Abnormal operation or frequent and recurring breakdowns are identified, investigated and maintenance organised as required 
Situations requiring expert advice are identified and specialist assistance sought in accordance with site procedures 
Equipment condition is routinely reviewed to ensure and maintain efficient operations 
Maintenance checklists are developed for irrigation components 
Structures are inspected as necessary to locate and evaluate defects 
Appropriate repair methods are identified to ensure defect is repaired effectively 
Structures are repaired or replaced according to requirements 
Materials required for job are identified and organised as required to enable appropriate maintenance of components 
 
Evidence of pests is assessed and integrated control measures appropriate to type and species of infestation are determined 
Areas of weed infestation on irrigation works are located and species identified 
Integrated control methods are selected to control pests and weeds 
Control methods are scheduled at the optimum time with minimal damage to desired plants 
Severity of infestations and records of treatments are maintained 
Records are maintained of maintenance activities 
Results of maintenance works are assessed against the maintenance program 

Forms

Assessment Cover Sheet

AHCIRG417A - Supervise sprinkler irrigation maintenance
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCIRG417A - Supervise sprinkler irrigation maintenance

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: