Assessor Resource

AHCIRG502
Design irrigation system maintenance and monitoring programs

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency describes the skills and knowledge required to design irrigation system maintenance and monitoring programs.

It applies to individuals who analyse information and exercise judgement to complete a range of skilled activities and demonstrate deep knowledge in a specific technical area. They have accountability for the work of others and analyse, design and communicate solutions to a range of complex problems. All work is carried out to comply with workplace procedures.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Design an irrigation system maintenance program

1.1 Specify the resources needed to perform maintenance tasks

1.2 Specify repairs, replacements and servicing requirements for all equipment and machinery

1.3 Specify activities required to maintain the irrigation site, system hardware and water quality

1.4 Analyse manufacturer's operating manuals and use as guidance to specify maintenance activities, schedule and skills required

1.5 Take into account water supply authority constraints and requirements for water and maintenance when scheduling system maintenance program activities

1.6 Determine labour and work health and safety requirements for each activity and record

1.7 Ensure weed control, water storage and treatment maintenance form an integral part of the system maintenance program

1.8 Specify strategies to ensure that negative impacts of irrigation, drainage and water treatment systems are minimised, and positive impacts are maximised

2. Design a monitoring and scheduling program

2.1 Integrate procedures for monitoring and recording system hardware use and performance into the monitoring and scheduling program

2.2 Integrate procedures for scheduling, monitoring and recording water use

2.3 Include procedures for monitoring and recording operating costs

2.4 Develop contingency plans in the event of water restrictions being imposed

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

analyse and organising information

design scheduling and recording procedures

develop and include relevant work health and safety and environmental procedures

identify adverse environmental impacts of irrigation, drainage and water treatment activities and taking appropriate remedial action

identify and scheduling activities

The candidate must demonstrate knowledge of:

drainage and water treatment using water from any ground or underground source

environmental impacts of irrigation

irrigation, drainage and water treatment maintenance activities

maintenance and monitoring design requirements

water quality guidelines for fresh and marine water including but not limited to ANZECC 1999

water supply authority constraints

work health and safety and environmental protection legislation, codes of practice and enterprise requirements for monitoring and maintenance programs

Assessors must satisfy current standards for RTOs.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Design an irrigation system maintenance program

1.1 Specify the resources needed to perform maintenance tasks

1.2 Specify repairs, replacements and servicing requirements for all equipment and machinery

1.3 Specify activities required to maintain the irrigation site, system hardware and water quality

1.4 Analyse manufacturer's operating manuals and use as guidance to specify maintenance activities, schedule and skills required

1.5 Take into account water supply authority constraints and requirements for water and maintenance when scheduling system maintenance program activities

1.6 Determine labour and work health and safety requirements for each activity and record

1.7 Ensure weed control, water storage and treatment maintenance form an integral part of the system maintenance program

1.8 Specify strategies to ensure that negative impacts of irrigation, drainage and water treatment systems are minimised, and positive impacts are maximised

2. Design a monitoring and scheduling program

2.1 Integrate procedures for monitoring and recording system hardware use and performance into the monitoring and scheduling program

2.2 Integrate procedures for scheduling, monitoring and recording water use

2.3 Include procedures for monitoring and recording operating costs

2.4 Develop contingency plans in the event of water restrictions being imposed

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

analyse and organising information

design scheduling and recording procedures

develop and include relevant work health and safety and environmental procedures

identify adverse environmental impacts of irrigation, drainage and water treatment activities and taking appropriate remedial action

identify and scheduling activities

The candidate must demonstrate knowledge of:

drainage and water treatment using water from any ground or underground source

environmental impacts of irrigation

irrigation, drainage and water treatment maintenance activities

maintenance and monitoring design requirements

water quality guidelines for fresh and marine water including but not limited to ANZECC 1999

water supply authority constraints

work health and safety and environmental protection legislation, codes of practice and enterprise requirements for monitoring and maintenance programs

Assessors must satisfy current standards for RTOs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Specify the resources needed to perform maintenance tasks 
Specify repairs, replacements and servicing requirements for all equipment and machinery 
Specify activities required to maintain the irrigation site, system hardware and water quality 
Analyse manufacturer's operating manuals and use as guidance to specify maintenance activities, schedule and skills required 
Take into account water supply authority constraints and requirements for water and maintenance when scheduling system maintenance program activities 
Determine labour and work health and safety requirements for each activity and record 
Ensure weed control, water storage and treatment maintenance form an integral part of the system maintenance program 
Specify strategies to ensure that negative impacts of irrigation, drainage and water treatment systems are minimised, and positive impacts are maximised 
Integrate procedures for monitoring and recording system hardware use and performance into the monitoring and scheduling program 
Integrate procedures for scheduling, monitoring and recording water use 
Include procedures for monitoring and recording operating costs 
Develop contingency plans in the event of water restrictions being imposed 

Forms

Assessment Cover Sheet

AHCIRG502 - Design irrigation system maintenance and monitoring programs
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCIRG502 - Design irrigation system maintenance and monitoring programs

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: