Assessor Resource

AHCLSC202
Construct low-profile timber or modular retaining walls

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency describes the skills and knowledge required to construct low-profile timber or modular retaining walls in landscape settings.

This unit applies to individuals who work under general supervision and exercise limited autonomy with some accountability for their own work. They undertake defined activities and work in a structured context.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Read work instructions relating to constructing the retaining wall and confirm instructions with the supervisor

1.2 Prepare tools and equipment and use according to the supervisor's instructions

1.3 Identify and report to supervisor any manual handling and other work health and safety hazards

1.4 Select, use and maintain personal protective equipment (PPE) and clothing

1.5 Check the quantity and quality of materials to make sure they conform to the requirements of the job plans

1.6 Locate and mark out services

2. Mark out site for retaining wall

2.1 Mark out the position of the retaining wall according to site plans

2.2 Determine the location and depth of excavations

2.3 Establish profiles to conform to the designated tolerances

2.4 Establish survey benchmarks

3. Prepare footings according to industry standards

3.1 Excavate foundations for the retaining wall to the required depth and dimensions as designated on the site plans

3.2 Remove soil and waste material and stockpile to ensure a safe working area

3.3 Locate reinforcing or steps in the excavated site and position accordingly

3.4 Position pegs to maintain levels of even depth and horizontal plane to the top of footings

3.5 Place, consolidate and finish footings to determined levels, to ensure coverage of reinforcement as necessary

4. Prepare and install retaining wall components

4.1 Prepare and lay out components for installation

4.2 Mark components to be cut to length and shape, and cut to the requirements of profiles already established

4.3 Install drainage media

4.4 Construct base layer of retaining wall to a point above the top of the drainage media and form weep holes where indicated

4.5 Back-fill and compact fill material behind base of retaining wall

4.6 Construct retaining wall components to required dimensions, profiles and levels as specified on the site plans

4.7 Set capping to top of retaining wall to specified levels with a tolerance appropriate to the style of capping

5. Clean up site and store tools and equipment

5.1 Dispose of or recycle soil and waste material from the site to minimise damage to the environment

5.2 Store and stack unused construction materials for future re-use

5.3 Clean and store all tools and equipment

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting.

The candidate must provide evidence that they can

read and interpret site and construction plans

identify work health and safety hazards

calculate materials required and mark out the area to be retained

mark out the site and assemble materials

construct footings and place reinforcing

construct retaining walls as specified

clear up the site and dispose of waste

The candidate must demonstrate knowledge of:

the principles and practices of low profile retaining walls

construction approaches and methods

construction materials for retaining walls

safe lifting practices for large and heavy components

methods of disposing soil and waste materials in order to minimise damage to the environment

the environmental effects of altering water flow when installing retaining walls with or without drainage media

the environmental impact of soil disturbance when excavating an area to be retained

Assessors must satisfy current standards for RTOs.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan and prepare work

1.1 Read work instructions relating to constructing the retaining wall and confirm instructions with the supervisor

1.2 Prepare tools and equipment and use according to the supervisor's instructions

1.3 Identify and report to supervisor any manual handling and other work health and safety hazards

1.4 Select, use and maintain personal protective equipment (PPE) and clothing

1.5 Check the quantity and quality of materials to make sure they conform to the requirements of the job plans

1.6 Locate and mark out services

2. Mark out site for retaining wall

2.1 Mark out the position of the retaining wall according to site plans

2.2 Determine the location and depth of excavations

2.3 Establish profiles to conform to the designated tolerances

2.4 Establish survey benchmarks

3. Prepare footings according to industry standards

3.1 Excavate foundations for the retaining wall to the required depth and dimensions as designated on the site plans

3.2 Remove soil and waste material and stockpile to ensure a safe working area

3.3 Locate reinforcing or steps in the excavated site and position accordingly

3.4 Position pegs to maintain levels of even depth and horizontal plane to the top of footings

3.5 Place, consolidate and finish footings to determined levels, to ensure coverage of reinforcement as necessary

4. Prepare and install retaining wall components

4.1 Prepare and lay out components for installation

4.2 Mark components to be cut to length and shape, and cut to the requirements of profiles already established

4.3 Install drainage media

4.4 Construct base layer of retaining wall to a point above the top of the drainage media and form weep holes where indicated

4.5 Back-fill and compact fill material behind base of retaining wall

4.6 Construct retaining wall components to required dimensions, profiles and levels as specified on the site plans

4.7 Set capping to top of retaining wall to specified levels with a tolerance appropriate to the style of capping

5. Clean up site and store tools and equipment

5.1 Dispose of or recycle soil and waste material from the site to minimise damage to the environment

5.2 Store and stack unused construction materials for future re-use

5.3 Clean and store all tools and equipment

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting.

The candidate must provide evidence that they can

read and interpret site and construction plans

identify work health and safety hazards

calculate materials required and mark out the area to be retained

mark out the site and assemble materials

construct footings and place reinforcing

construct retaining walls as specified

clear up the site and dispose of waste

The candidate must demonstrate knowledge of:

the principles and practices of low profile retaining walls

construction approaches and methods

construction materials for retaining walls

safe lifting practices for large and heavy components

methods of disposing soil and waste materials in order to minimise damage to the environment

the environmental effects of altering water flow when installing retaining walls with or without drainage media

the environmental impact of soil disturbance when excavating an area to be retained

Assessors must satisfy current standards for RTOs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Read work instructions relating to constructing the retaining wall and confirm instructions with the supervisor 
Prepare tools and equipment and use according to the supervisor's instructions 
Identify and report to supervisor any manual handling and other work health and safety hazards 
Select, use and maintain personal protective equipment (PPE) and clothing 
Check the quantity and quality of materials to make sure they conform to the requirements of the job plans 
Locate and mark out services 
Mark out the position of the retaining wall according to site plans 
Determine the location and depth of excavations 
Establish profiles to conform to the designated tolerances 
Establish survey benchmarks 
Excavate foundations for the retaining wall to the required depth and dimensions as designated on the site plans 
Remove soil and waste material and stockpile to ensure a safe working area 
Locate reinforcing or steps in the excavated site and position accordingly 
Position pegs to maintain levels of even depth and horizontal plane to the top of footings 
Place, consolidate and finish footings to determined levels, to ensure coverage of reinforcement as necessary 
Prepare and lay out components for installation 
Mark components to be cut to length and shape, and cut to the requirements of profiles already established 
Install drainage media 
Construct base layer of retaining wall to a point above the top of the drainage media and form weep holes where indicated 
Back-fill and compact fill material behind base of retaining wall 
Construct retaining wall components to required dimensions, profiles and levels as specified on the site plans 
Set capping to top of retaining wall to specified levels with a tolerance appropriate to the style of capping 
Dispose of or recycle soil and waste material from the site to minimise damage to the environment 
Store and stack unused construction materials for future re-use 
Clean and store all tools and equipment 

Forms

Assessment Cover Sheet

AHCLSC202 - Construct low-profile timber or modular retaining walls
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCLSC202 - Construct low-profile timber or modular retaining walls

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: