This unit applies to the process of protecting trees during construction work and relates working under routine supervision with intermittent checking. Responsibility for some roles and coordination within a team may be required. Tree protection at this level requires the application of knowledge and skills to a broad range of tasks.

This unit covers the process of protecting trees by installing protective devices and defines the standard required to: select tools and equipment for protecting trees prior to construction activities; install protective measures around trees to prevent them from damage; clean up materials and maintain worksite.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include evidence of the following:

select tools and equipment for protecting trees prior to construction activities

install protective measures around trees to prevent them from damage

clean up materials and maintain worksite.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

interpret site maps and tree protection plans

operate equipment such as digging equipment, traffic control devices

assemble or build protection devices

read and interpret site maps and protection plans including a range of graphic symbols

follow directions for the construction or assembly of protection devices

follow supervisors instructions

record or report workplace outcomes

measure materials used in construction and assembly

calculate quantities and area

measure and estimate height, depth and distance.

Required knowledge

potential damage to trees during construction work i.e. compaction, direct physical damage to trunk and crown, roots, soil contamination, changes in soil properties, environmental damage

AS1742 Pt 3 1985 - Australian Standard Code of Practice, Work Site Traffic Management (if involved in traffic control)

principles and techniques relating to the choice of tools and equipment for installing tree protection devices

techniques for assembling or constructing a range of tree protection devices

techniques and application of a range of tree protection devices suitable to the requirements of the species

care and maintenance of trees during protection operations.

The range statement relates to the unit of competency as a whole.

Protection methods may include:

installation of fences, tree guards, tree plantings, barriers, retaining walls

soil coverings

erection of signs and bunting

traffic re-direction devices.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Enterprise work procedures related to the task are received and confirmed. 
Trees to be protected, and method of protection to be used, are identified accurately from enterprise work procedures. 
Occupational Health and Safety (OHS) hazards are identified, risks assessed and reported to the supervisor. 
Suitable Personal Protective Equipment (PPE) is selected, used and maintained. 
Tools and equipment appropriate to the task being undertaken are prepared and used according to enterprise OHS requirements. 
Protection devices or materials to assemble devices are collected and checked against requirements as indicated in enterprise work procedures. 
Protection devices are assembled according to enterprise work procedures. 
Devices are installed in line with protection plans and/or enterprise work procedures. 
Work is carried out in a manner that minimises risk of damage to trees and the surrounding environment. 
Protection devices are checked for their effectiveness according to enterprise work procedures. 
Damaged and/or ineffective devices are reported to the supervisor. 
A clean and safe area is maintained throughout and on completion of work. 
Workplace outcomes are recorded or reported to the supervisor according to enterprise work procedures. 

Forms

Assessment Cover Sheet

AHCLSC205A - Install tree protection devices
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCLSC205A - Install tree protection devices

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature: