Assessor Resource

AHCNAR505A
Plan river restoration works

Assessment tool

Version 1.0
Issue Date: May 2024


This unit applies to restoration and rehabilitation project managers.

This unit covers planning of river restoration works and defines the standard required to: restoration strategies are checked for compliance and discussed with client; develop erosion and sediment control measures; follow industry guidelines to establish fauna habitat and vegetation species; document the strategy and submit to the relevant consent authority; prepare a detailed works plan.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

restoration strategies are checked for compliance and discussed with client

develop erosion and sediment control measures

follow industry guidelines to establish fauna habitat and vegetation species

document the strategy and submit to the relevant consent authority

prepare a detailed works plan.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

establish requirements of the project

establish the suitability of a project proposal

develop erosion and sediment control strategies

develop a river restoration strategy

design structural works, and prepare a river restoration plan

prepare a detailed works plan

use literacy skills to fulfil job roles as required by the organisation. The level of skill may range from reading and understanding documentation to completion of written reports

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views

use numeracy skills to estimate, calculate and record complex workplace measures

use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

relevant environmental protection, planning and groundwater legislation

river processes and restoration techniques

erosion and sediment control techniques

planning procedure for erosion and sediment control

erosion control and design principles

soils and soil formation

levels and levelling

design principles

earthmoving principles

restoration principles and techniques

total catchment issues

legal requirements - permits

environmental issues

biodiversity

managing peak water flows

subsurface and surface drainage principles and systems.

The range statement relates to the unit of competency as a whole.

Erosion control measures may include:

embankment stabilising structures and techniques.

Sediment control measures may include:

coffer dams

site management

sediment fences

sediment traps

sediment curtains

sediment retention basins.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
The client expectations is discussed and confirmed. 
Current impacting legislation and policies are explained to the client. 
Possible strategies are discussed with the client and the best option confirmed in writing. 
Property ownership and boundaries are confirmed by checking maps and titles. 
Profiles of river sections are determined from survey and aerial photographs. 
Erosion control measures are developed and are consistent with industry principles and selection criteria. 
Sediment control measures are developed consistent with industry principles and selection criteria. 
Fauna habitats are developed following industry recommendations. 
Vegetation species utilised within restoration project comply with industry guidelines. 
River restoration strategies are established and documented in co-operation with the client and relevant consent authority. 
Selection criteria for earthwork structures or measures are checked against industry guidelines. 
Habitat enhancement strategies checked against industry guidelines. 
Plan is prepared according to enterprise guidelines and industry best practice. 

Forms

Assessment Cover Sheet

AHCNAR505A - Plan river restoration works
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCNAR505A - Plan river restoration works

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: