Assessor Resource

AHCSAW502
Plan erosion and sediment control measures

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency describes the skills and knowledge required to develop erosion and sediment control plans.

This unit applies to individuals who take personal responsibility and exercise autonomy in undertaking complex work. They analyse, design and communicate solutions to sometimes complex problems.

No occupational licensing, legislative or certification requirements are known to apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Establish suitability of development proposal

1.1 Compile data concerning suitability of development site

1.2 Note alterations or modifications to the development proposal and report to developer or consent authority

1.3 Establish compliance with relevant regulatory planning authority and environmental legislation

1.4 Confirm development proposal meets erosion and sediment control guidelines

2. Develop erosion and sediment control strategy

2.1 Develop erosion control measures

2.2 Develop sediment control measures

2.3 Apply work health and safety and environmentally sustainable practices to strategy

2.4 Establish erosion and sediment control strategies and document in co-operation with the developer and relevant consent authority

3. Prepare an erosion and sediment control plan

3.1 Check selection criteria for earthwork structures or measures against industry guidelines

3.2 Develop erosion and sediment control plan, incorporating design specifications for structures

3.3 Confirm the erosion and sediment control plan and supporting documentation follow industry guidelines

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

develop a plan for erosion and sediment control measures that meets regulatory requirements and industry standards

establish suitability of development proposal to location and environment

prepare reports on erosion and sediment control plans to enterprise standards

develop erosion and sediment control measures consistent with industry principles and selection criteria

prepare an erosion and sediment control plan to industry standards and to comply with relevant regulatory planning authority

The candidate must demonstrate knowledge of:

application of relevant environmental, planning and groundwater legislation in erosion and sediment control work

planning process for erosion and sediment control

erosion control and design principles:

soils and soil formation

levels and levelling

earthmoving principles

total catchment issues

how to manage peak water flows

subsurface and surface drainage principles and systems

permits or consents potentially required for developing erosion and sediment control structures

environmental issues related to erosion and sediment

awareness of the limitations of design aids provided for industry

work health and safety implications of implementing plans

Assessors must satisfy current standards for RTOs.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Establish suitability of development proposal

1.1 Compile data concerning suitability of development site

1.2 Note alterations or modifications to the development proposal and report to developer or consent authority

1.3 Establish compliance with relevant regulatory planning authority and environmental legislation

1.4 Confirm development proposal meets erosion and sediment control guidelines

2. Develop erosion and sediment control strategy

2.1 Develop erosion control measures

2.2 Develop sediment control measures

2.3 Apply work health and safety and environmentally sustainable practices to strategy

2.4 Establish erosion and sediment control strategies and document in co-operation with the developer and relevant consent authority

3. Prepare an erosion and sediment control plan

3.1 Check selection criteria for earthwork structures or measures against industry guidelines

3.2 Develop erosion and sediment control plan, incorporating design specifications for structures

3.3 Confirm the erosion and sediment control plan and supporting documentation follow industry guidelines

The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.

The candidate must provide evidence that they can:

develop a plan for erosion and sediment control measures that meets regulatory requirements and industry standards

establish suitability of development proposal to location and environment

prepare reports on erosion and sediment control plans to enterprise standards

develop erosion and sediment control measures consistent with industry principles and selection criteria

prepare an erosion and sediment control plan to industry standards and to comply with relevant regulatory planning authority

The candidate must demonstrate knowledge of:

application of relevant environmental, planning and groundwater legislation in erosion and sediment control work

planning process for erosion and sediment control

erosion control and design principles:

soils and soil formation

levels and levelling

earthmoving principles

total catchment issues

how to manage peak water flows

subsurface and surface drainage principles and systems

permits or consents potentially required for developing erosion and sediment control structures

environmental issues related to erosion and sediment

awareness of the limitations of design aids provided for industry

work health and safety implications of implementing plans

Assessors must satisfy current standards for RTOs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Compile data concerning suitability of development site 
Note alterations or modifications to the development proposal and report to developer or consent authority 
Establish compliance with relevant regulatory planning authority and environmental legislation 
Confirm development proposal meets erosion and sediment control guidelines 
Develop erosion control measures 
Develop sediment control measures 
Apply work health and safety and environmentally sustainable practices to strategy 
Establish erosion and sediment control strategies and document in co-operation with the developer and relevant consent authority 
Check selection criteria for earthwork structures or measures against industry guidelines 
Develop erosion and sediment control plan, incorporating design specifications for structures 
Confirm the erosion and sediment control plan and supporting documentation follow industry guidelines 

Forms

Assessment Cover Sheet

AHCSAW502 - Plan erosion and sediment control measures
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCSAW502 - Plan erosion and sediment control measures

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: