List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Element | Performance criteria |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare for cultivation | 1.1 Confirm work requirements from the planting plan 1.2 Determine the method of cultivation from the planting plan 1.3 Identify work health and safety hazards, assess risks and implement suitable controls 1.4 Select, use and maintain suitable personal protective equipment (PPE) 1.5 Identify environmental implications of cultivating the site, assess likely outcomes and take responsible action |
2. Prepare the cultivating equipment | 2.1 Clean and inspect vehicles, machinery and equipment according to certified seed production procedures 2.2 Service and adjust vehicles and equipment for the conditions and replace worn parts 2.3 Dispose of all containers, leftover fluids, waste and debris from the maintenance and servicing work 2.4 Record maintenance and servicing |
3. Cultivate soil | 3.1 Remove, incorporate or burn previous cropdebris 3.2 Follow and complete the cultivation plan for each paddock 3.3 Select, use and maintain suitable personal protective equipment (PPE) 3.4 Operate vehicles and equipment in a safe, effective and efficient manner at speeds to suit the conditions 3.5 Ensure the quality of cultivation is maximised by continually checking and adjusting the vehicles and equipment as necessary 3.5 Meet all timelines, resource and quality requirements of the planting plan |
4. Prepare site for planting | 4.1 Complete the planting layout as required by the planting plan 4.2 Undertake weed and pest control as required 4.3 Apply fertilisers, ameliorants, and/or other pre-planting treatments as required 4.4 Identify the environmental implications of site preparation, assess likely outcomes and, if necessary, take responsible action |
5. Complete land preparation operations | 5.1 Clean and store machinery and equipment according to manufacturer specifications, organisational procedures and regulations 5.2 Dispose of all containers, leftover fluids, waste and debris from the cleaning and maintenance work 5.3 Complete all required records and documentation accurately and promptly |
The candidate must be assessed on their ability to integrate and apply the performance requirements of this unit in a workplace setting. Performance must be demonstrated consistently over time and in a suitable range of contexts.
The candidate must provide evidence that they can:
prepare for cultivation
complete pre- and post-operational checks on tools, vehicles and equipment
interpret production or planting plans
produce standards, quality specifications and work procedure documents
measure materials and site plan specifications
cultivate soil in accordance with paddock cultivation plans
service, operate, adjust and calibrate cultivation equipment safely
complete records and documentation accurately and promptly
The candidate must demonstrate knowledge of:
principles and practices for preparing land for seed crop production
pre-planting treatments, their purpose and method of application
environmental issues of cultivating soil for planting, such as drainage and irrigation systems, soil amelioration and waste disposal procedures
methods of cultivating a range of soil types
operation and maintenance of planting equipment
procedures and standards for certified seed
work health and safety guidelines, procedures and principles, including manual handling and exposure to hazardous substances
Assessors must satisfy current standards for RTOs.