Assessor Resource

AHCSOL302A
Construct a soil profile

Assessment tool

Version 1.0
Issue Date: May 2024


This unit applies to the construction of new soil profiles in residential, commercial and public recreational open space development and residential and rural property development in new projects and in the complete renovation of existing soil profiles in urban and regional areas.

This unit covers the process of constructing soil profiles and defines the standard required to: determine construction requirements from plans; survey and create working plans for construction sites; excavate earthworks and establish working and finished levels; install drainage and sub-surface irrigation components; install sustainable soils and growing media; implement a construction project.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

determine construction requirements from plans

survey and create working plans for construction sites

excavate earthworks and establish working and finished levels

install drainage and sub-surface irrigation components

install sustainable soils and growing media

implement a construction project.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

draft basic working plans

survey site levels and dimensions

install drainage and irrigation systems

measure materials, interpret , survey and assess site measurements, and interpret and apply test results

coordinate work group, contractors and own activities to sequentially and effectively complete construction in a timely and cost effective manner

use literacy skills to read, interpret and follow organisational policies and procedures, follow sequenced written instructions, record accurately and legible information collected and select and apply procedures for a range of tasks

use oral communication skills/language competence to fulfil the job role as specified by the organisation, including questioning techniques, active listening, clarifying information and consulting with supervisors as required

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to work with and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

practical understanding of the range and use of materials, tools, equipment and machinery available for construction of soil profiles, including soil amendments and base construction materials

soil and growing media types suitable for sustainable landscapes

practical understanding of the range of construction methods that may be used to construct soil profiles and the association of construction methods with site limitations, environmental implications, and end use of the site

practical understanding of surveying principles and techniques

soil testing techniques and the application of results to the construction process

awareness of the comparative environmental implications associated with construction and excavation activity, drainage and irrigations systems, soil amendments and waste disposal procedures

AS4419-2003 and AS4454-2003.

The range statement relates to the unit of competency as a whole.

Constructing profiles may include:

construction sites

landscaping sites

land developments

farms

land management operations

restoration projects.

This standard does not cover high performance turf sporting surface constructions.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Surveying equipment is set up and used according to industry standards. 
Existing levels are surveyed and temporary benchmark established. Details are recorded accurately and legibly according to industry standards. 
New levels are set according to specifications and pegs placed according to industry convention. 
Contour map with reduced levels and a cross section is developed and drawn using accepted industry symbols and mapping conventions. 
Enterprise work team, contractors and design consultants are identified and, where required, engaged. 
Work tasks are scheduled in a logical, timely and effective manner in consultation with the supervisor. 
Materials required are estimated and costed according to accepted industry practice and ordered. 
Plans for the new construction profile are obtained or developed. 
Soil profile construction requiring set out. 
Excess soil is removed and the construction site cleared with the stockpile being placed in a designated area according to enterprise work procedures. 
The base is graded to the level and slope specified in the base design. 
The base of the profile is prepared over the entire site according to the construction plan. 
Sub-surface irrigation system components and fittings are installed to the required depth and design specified in the construction plan. 
Install drainage system. 
Quantities of material required are calculated and measured according to the construction plan. 
Soils and growing media are selected for sustainable use and according to the construction plan. 
Each profile layer is installed and compacted to reflect the final contour. 
The interface between profile layers is uniform and unbroken according to the construction plan. 
Soil amendments are prepared and implemented. 
The finishing soil surface is given a final levelling and consolidated, ready for planting, according to the construction plan and enterprise work procedures. 

Forms

Assessment Cover Sheet

AHCSOL302A - Construct a soil profile
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCSOL302A - Construct a soil profile

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: