Assessor Resource

AHCSOL403A
Prepare acid sulphate soil management plans

Assessment tool

Version 1.0
Issue Date: May 2024


This unit is likely to be carried out independently within enterprise guidelines.

This unit covers the process of developing management plans that address the relevant legislation and issues associated with land and ground water disturbing activities for Acid Sulphate Soil (ASS) and defines the standard required to: complete a desktop assessment of the land for actual and potential ASS risk based on current/proposed land use, site data and compliance issues; collect and use field and test data to identify strategies to remediate and manage the site; document an ASS management plan and effectively communicate it to the landowner, relevant consent authority and contractors; support implementation of ASS management plan by reports on materials management and remediation and site rehabilitation.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

complete a desktop assessment of the land for actual and potential ASS risk based on current/proposed land use, site data and compliance issues

collect and use field and test data to identify strategies to remediate and manage the site

document an ASS management plan and effectively communicate it to the landowner, relevant consent authority and contractors

support implementation of ASS management plan by reports on materials management and remediation and site rehabilitation.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

ability to assess field and laboratory results from AASS and PASS sites

collaborate with designers and relevant consent authority

develop remediation and management strategies

develop monitoring strategies

prepare works action plans

prepare ASS management plans

prepare reports on materials management and remediation and site rehabilitation to implement approved ASS plans

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification, negotiating solutions and responding to a range of views

use numeracy skills to estimate, calculate and record routine and more complex workplace measures and data

use interpersonal skills to work with others and relate to people from a range of cultural, social and religious backgrounds and with a range of physical and mental abilities.

Required knowledge

relevant environmental, planning and groundwater legislation

planning process for remediation and management plans

ASS assessment tools

environmental impacts of ASS

environmental plans, strategies and options for management and remediation

total catchment issues

principles of duty of care and due diligence

soils and soil chemistry

levels and levelling

earthmoving principles

environmental impact issues

managing acid leachate water flows

subsurface and surface drainage principles and systems.

The range statement relates to the unit of competency as a whole.

Management plans may include:

plans covering type of land use and/or works

land class (LGA zoning and ASS Planning and Risk Map classes)

site characteristics

land tenure

drainage administration

construction methodology

materials remediation

site rehabilitation to industry guidelines and relevant consent authority standards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Current/proposed land use established and documented following discussions with landholder and relevant consent authority. 
Site data assessed following industry guidelines and relevant consent authority standards. 
Compliance issues established/checked with relevant regulatory authority or environmental legislation and/or industry procedures. 
Site investigations communicated to proponent/ landholder and concurrence is established to develop a management plan in accordance with relevant consent authority requirements. 
Field investigation and laboratory test data reviewed and matched to strategy options consistent with industry principles and relevant consent authority standards. 
ASS management options identified consistent with industry guidelines and relevant consent authority requirements. 
Remediation/management strategies identified and documented in consultation with the landholder/developer and relevant consent authority. 
Remediation/management strategies are checked against industry guidelines and relevant consent authority requirements. 
Design specifications for structures incorporated in management plan details. 
Monitoring strategies for the site are detailed in line with prevailing site factors and industry guidelines and relevant consent authority standards. 
On site responsibilities listed following industry guidelines and relevant consent authority requirements. 
Contingency procedures in accordance with industry guidelines and relevant consent authority requirements. 

Forms

Assessment Cover Sheet

AHCSOL403A - Prepare acid sulphate soil management plans
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCSOL403A - Prepare acid sulphate soil management plans

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: