Assessor Resource

AHCWAT201A
Set up, operate and maintain water delivery systems for compost

Assessment tool

Version 1.0
Issue Date: May 2024


This unit applies to an employee of an enterprise engaged in commercial-scale composting operations. Tasks are likely to be performed by a yard hand or general hand under supervision of an operations team leader or site foreman. Work is likely to be performed as a part of a team. The work requires the application of basic operational knowledge and skills to a limited range of maintenance tasks and roles, most of which are routine and predictable.

This unit covers the process of setting up, operating and maintaining water delivery systems to maintain moisture levels in compost and defines the standard required to: establish the requirements for a water delivery system; set up and operate a water delivery system on a commercial-scale composting site; record water application data; observe faults and variations from required settings; observe and report any faults or variations from required settings.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

The evidence required to demonstrate competency in this unit must be relevant to workplace operations and satisfy holistically all of the requirements of the performance criteria and required skills and knowledge and include achievement of the following:

establish the requirements for a water delivery system

set up and operate a water delivery system on a commercial-scale composting site

record water application data

observe faults and variations from required settings

observe and report any faults or variations from required settings.

Context of and specific resources for assessment

Competency requires the application of work practices under work conditions. Selection and use of resources for some worksites may differ due to the regional or enterprise circumstances.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

identify hazards and adopt safe work practices

interpret site water management plan and site operating plan or map

use a tape measure

observing faults and variations from required settings

operating pumps

recording water application data

setting out and operating watering systems

using Personal Protective Equipment (PPE) correctly

using relevant equipment

use literacy skills to follow sequenced written instructions and record information accurately and legibly

use oral communication skills/language competence to fulfil the job role as specified by the organisation including questioning, active listening, asking for clarification and seeking advice from supervisor

use numeracy skills to estimate, calculate and record routine workplace measures

use interpersonal skills to relate to people from a range of social, cultural and ethnic backgrounds and with a range of physical and mental abilities.

Required knowledge

characteristics and operation of joints, hoses, valves and sprinkler components

components of water delivery system

methods and techniques of water delivery

procedures for safe use of equipment, such as powered and hand tools, as used in water delivery system maintenance

standard industry risk-control measures to minimise risk associated with setting up and operating a water delivery system

reporting and recording requirements

OHS and environmental legislation and enterprise requirements.

The range statement relates to the unit of competency as a whole.

Water delivery systems may include:

permanent overhead sprinklers

portable or travelling sprinklers

soaker hoses

spray and drippers

stand pipes

water tanker.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Requirements for set up of water delivery system and application methods to be used are obtained from supervisor and clarified if required. 
Details of location to which water is to be delivered are confirmed with supervisor and any regulations covering use of site are noted and observed. 
Hoses, tools and equipment and components appropriate to particular water delivery system being set up are selected and correctly used. 
Appropriate water sources on site are identified. 
Occupational Health and Safety (OHS) hazards associated with task are identified and appropriate action is taken to minimise risks to self and others. 
Water delivery lines, where required, are measured and marked out according to instructions. 
Water delivery system is set up according to instructions and enterprise procedures. 
Water delivery is commenced as instructed. 
Water application rate is set according to enterprise procedures. 
Pipes, hoses and all joints are checked and confirmed to be secure and leak free. 
Pumps are operated and checked according to manufacturer instructions and enterprise procedures. 
Remedial action is taken if required and according to enterprise guidelines and supervisor instructions. 
Water application rate and distribution are checked according to enterprise procedures. 
Water delivery system is visually inspected for operating faults and dry areas, and observations are recorded in maintenance log. 
Variations from required rate or settings, or leaks, operating faults and dry areas observed at any stage in process are reported to supervisor. 
Remedial action is carried out as directed by supervisor and according to enterprise procedures. 
Amounts of water delivered to location are recorded according to enterprise procedures. 
Work outcomes are reported to supervisor, feedback on performance is sought and any required improvements are noted for future action. 

Forms

Assessment Cover Sheet

AHCWAT201A - Set up, operate and maintain water delivery systems for compost
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AHCWAT201A - Set up, operate and maintain water delivery systems for compost

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: