Assessor Resource

AUMFTA002
Perform die coating

Assessment tool

Version 1.0
Issue Date: April 2024


This unit describes the performance outcomes required to coat dies for their later use in casting processes.

It applies to those in an automotive and related component manufacturing environment and involves the application of skills and knowledge at a specialist level.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Plan and prepare

1.1 Job instructions and quality requirements are identified and confirmed with appropriate personnel

1.2 Tools and equipment required for the job are selected and checked for faults and correct operation

1.3 Materials required to complete the job are identified and prepared

2. Disassemble and inspect dies

2.1 Die is safely located in the coating area

2.2 Die coating insulation materials are inspected for wear, and removed if required

2.3 Dies are inspected and analysed for defects, and identified defects are rectified according to workplace procedures

2.4 Dies are tested to ensure rectification has eliminated the fault, and adjustments are made if required

3. Coat and assemble dies

3.1 Die coating insulation material is selected and prepared according to workplace procedures

3.2 Die is cleaned in preparation for coating and heated according to workplace and equipment manufacturer recommendations and work health and safety (WHS) requirements

3.3 Die coating insulation material is applied to the die, and die is assembled and checked in preparation for pressing according to workplace and equipment manufacturer recommendations

3.4 Die is returned to production sequence

4. Complete work processes

4.1 Work area is cleaned, and materials disposed of or recycled according to workplace procedures

4.2 Tools and equipment are cleaned, checked, maintained and stored according to workplace procedures

4.3 Documentation is completed according to workplace procedures


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section

1. Plan and prepare

1.1 Job instructions and quality requirements are identified and confirmed with appropriate personnel

1.2 Tools and equipment required for the job are selected and checked for faults and correct operation

1.3 Materials required to complete the job are identified and prepared

2. Disassemble and inspect dies

2.1 Die is safely located in the coating area

2.2 Die coating insulation materials are inspected for wear, and removed if required

2.3 Dies are inspected and analysed for defects, and identified defects are rectified according to workplace procedures

2.4 Dies are tested to ensure rectification has eliminated the fault, and adjustments are made if required

3. Coat and assemble dies

3.1 Die coating insulation material is selected and prepared according to workplace procedures

3.2 Die is cleaned in preparation for coating and heated according to workplace and equipment manufacturer recommendations and work health and safety (WHS) requirements

3.3 Die coating insulation material is applied to the die, and die is assembled and checked in preparation for pressing according to workplace and equipment manufacturer recommendations

3.4 Die is returned to production sequence

4. Complete work processes

4.1 Work area is cleaned, and materials disposed of or recycled according to workplace procedures

4.2 Tools and equipment are cleaned, checked, maintained and stored according to workplace procedures

4.3 Documentation is completed according to workplace procedures

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Workplace procedures must include:

equipment use, maintenance and storage

recording and reporting

WHS requirements relating to die coating

workplace quality and continuous improvement programs.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Job instructions and quality requirements are identified and confirmed with appropriate personnel 
Tools and equipment required for the job are selected and checked for faults and correct operation 
Materials required to complete the job are identified and prepared 
Die is safely located in the coating area 
Die coating insulation materials are inspected for wear, and removed if required 
Dies are inspected and analysed for defects, and identified defects are rectified according to workplace procedures 
Dies are tested to ensure rectification has eliminated the fault, and adjustments are made if required 
Die coating insulation material is selected and prepared according to workplace procedures 
Die is cleaned in preparation for coating and heated according to workplace and equipment manufacturer recommendations and work health and safety (WHS) requirements 
Die coating insulation material is applied to the die, and die is assembled and checked in preparation for pressing according to workplace and equipment manufacturer recommendations 
Die is returned to production sequence 
Work area is cleaned, and materials disposed of or recycled according to workplace procedures 
Tools and equipment are cleaned, checked, maintained and stored according to workplace procedures 
Documentation is completed according to workplace procedures 

Forms

Assessment Cover Sheet

AUMFTA002 - Perform die coating
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

AUMFTA002 - Perform die coating

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: