AURRTQ005 - Install marine jet drive propulsion systems
Assessor Resource
AURRTQ005 Install marine jet drive propulsion systems
Assessment tool
Version 1.0 Issue Date: May 2024
This unit describes the performance outcomes required to install marine jet drive propulsion systems. It involves preparing for the task, installing jet drive propulsion systems and testing their operation, and completing workplace processes and documentation.
It applies to those working in the marine service and repair industry.
No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)
Evidence Required
List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Elements
Elements describe the essential outcomes.
Performance Criteria
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.
1. Prepare to install jet drive propulsion system
1.1 Job requirements are determined from workplace instructions
1.2 Installation procedures and information are sourced and interpreted
1.3 Installation options are analysed and those most appropriate to the circumstances are selected
1.4 Hazards associated with the work are identified and risks are managed
1.5 Tools, equipment and materials are selected and checked for serviceability
2. Install and commission system
2.1 System is checked for correct application and components are checked for damage
2.2 System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
2.3 Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
2.4 System is re-tested in normal operating conditions and final adjustments are made
3. Complete work processes
3.1 Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
3.3 Tools and equipment are checked and stored according to workplace procedures
3.4 Workplace documentation is processed according to workplace procedures
Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:
install and test prior to placing in service two different marine jet drive propulsion systems.
Individuals must be able to demonstrate knowledge of:
work health and safety (WHS) and occupational health and safety (OHS) requirements relating to installing jet drive propulsion systems, including lifting and supporting procedures for jet drive propulsion systems
construction and operating principles of jet drive propulsion systems, including:
types of jet pumps, including:
centrifugal
axial flow
methods of reversing thrust, including:
cable-operated buckets
hydraulically-operated buckets
electrically-operated buckets
gearboxes
procedures for installing marine jet drive propulsion systems in vessels
procedures for testing the installation of marine jet drive propulsion systems
commissioning procedures for marine jet drive propulsion systems.
Assessors must satisfy NVR/AQTF assessor requirements.
Competency is to be assessed in the workplace or a simulated environment that accurately reflects performance in a real workplace setting.
Assessment must include direct observation of tasks.
Where assessment of competency includes third-party evidence, individuals must provide evidence that links them to the jet drive propulsion systems they have installed in vessels, e.g. repair orders.
Assessors must verify performance evidence through questioning on skills and knowledge to ensure correct interpretation and application.
The following resources must be made available:
workplace location or simulated workplace
workplace instructions
manufacturer jet drive propulsion system specifications
two different vessels requiring installation of jet drive propulsion systems
tools, equipment and materials appropriate for installing marine jet drive propulsion systems.
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Elements
Elements describe the essential outcomes.
Performance Criteria
Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold and italicised text is used, further information is detailed in the range of conditions section.
1. Prepare to install jet drive propulsion system
1.1 Job requirements are determined from workplace instructions
1.2 Installation procedures and information are sourced and interpreted
1.3 Installation options are analysed and those most appropriate to the circumstances are selected
1.4 Hazards associated with the work are identified and risks are managed
1.5 Tools, equipment and materials are selected and checked for serviceability
2. Install and commission system
2.1 System is checked for correct application and components are checked for damage
2.2 System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
2.3 Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
2.4 System is re-tested in normal operating conditions and final adjustments are made
3. Complete work processes
3.1 Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
3.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
3.3 Tools and equipment are checked and stored according to workplace procedures
3.4 Workplace documentation is processed according to workplace procedures
This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.
Safety requirements must include:
work health and safety (WHS) and occupational health and safety (OHS) requirements, including lifting and supporting procedures for jet drive propulsion systems.
Before competency can be determined, individuals must demonstrate they can perform the following according to the standards defined in this unit’s elements, performance criteria, range of conditions and foundation skills:
install and test prior to placing in service two different marine jet drive propulsion systems.
Individuals must be able to demonstrate knowledge of:
work health and safety (WHS) and occupational health and safety (OHS) requirements relating to installing jet drive propulsion systems, including lifting and supporting procedures for jet drive propulsion systems
construction and operating principles of jet drive propulsion systems, including:
types of jet pumps, including:
centrifugal
axial flow
methods of reversing thrust, including:
cable-operated buckets
hydraulically-operated buckets
electrically-operated buckets
gearboxes
procedures for installing marine jet drive propulsion systems in vessels
procedures for testing the installation of marine jet drive propulsion systems
commissioning procedures for marine jet drive propulsion systems.
Assessors must satisfy NVR/AQTF assessor requirements.
Competency is to be assessed in the workplace or a simulated environment that accurately reflects performance in a real workplace setting.
Assessment must include direct observation of tasks.
Where assessment of competency includes third-party evidence, individuals must provide evidence that links them to the jet drive propulsion systems they have installed in vessels, e.g. repair orders.
Assessors must verify performance evidence through questioning on skills and knowledge to ensure correct interpretation and application.
The following resources must be made available:
workplace location or simulated workplace
workplace instructions
manufacturer jet drive propulsion system specifications
two different vessels requiring installation of jet drive propulsion systems
tools, equipment and materials appropriate for installing marine jet drive propulsion systems.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice
Yes
No
Comments/feedback
Job requirements are determined from workplace instructions
Installation procedures and information are sourced and interpreted
Installation options are analysed and those most appropriate to the circumstances are selected
Hazards associated with the work are identified and risks are managed
Tools, equipment and materials are selected and checked for serviceability
System is checked for correct application and components are checked for damage
System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
System is re-tested in normal operating conditions and final adjustments are made
Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
Tools and equipment are checked and stored according to workplace procedures
Workplace documentation is processed according to workplace procedures
Job requirements are determined from workplace instructions
Installation procedures and information are sourced and interpreted
Installation options are analysed and those most appropriate to the circumstances are selected
Hazards associated with the work are identified and risks are managed
Tools, equipment and materials are selected and checked for serviceability
System is checked for correct application and components are checked for damage
System is installed according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to components or systems
Installed system is tested for correct operation and required adjustments are made according to manufacturer specifications, workplace procedures and safety requirements
System is re-tested in normal operating conditions and final adjustments are made
Final inspection is made to ensure work is to workplace expectations and vessel is presented ready for use
Work area is cleaned, waste and non-recyclable materials are disposed of, and recyclable material is collected
Tools and equipment are checked and stored according to workplace procedures
Workplace documentation is processed according to workplace procedures
Forms
Assessment Cover Sheet
AURRTQ005 - Install marine jet drive propulsion systems
Assessment task 1: [title]
Student name:
Student ID:
I declare that the assessment tasks submitted for this unit are my own work.
Student signature:
Result: Competent Not yet competent
Feedback to student
Assessor name:
Signature:
Date:
Assessment Record Sheet
AURRTQ005 - Install marine jet drive propulsion systems
Student name:
Student ID:
Assessment task 1: [title] Result: Competent Not yet competent
(add lines for each task)
Feedback to student:
Overall assessment result: Competent Not yet competent