Assessor Resource

CPCCBC4021A
Minimise waste on the building and construction site

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency supports the needs of builders, site managers and forepersons, and estimators in the building and construction industry.

This unit of competency specifies the outcomes required to support sustainable building practices by minimising waste on the building and construction site. The range of legislative and council planning requirements are addressed in addition to industry best practice in relation to the management of by-products generated and removed from demolition, renovation and construction sites.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Nil


Co-Requisites

Nil


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed by the effective application of sustainable waste management principles and concepts on a construction work site.

This unit of competency can be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

source and analyse legislative and planning requirements for waste minimisation in the building process

calculate costs and savings of implementing alternative waste minimisation systems

produce a strategy or plan for effective waste minimisation.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

documentation that should normally be available in either a building or construction office

relevant codes, standards and government regulations

office equipment, including calculators, photocopiers and telephone systems

computers with appropriate software to view 2-D CAD drawings, run costing programs and print copies

a technical reference library with current publications on measurement, design, building construction and manufacturers' product literature

a suitable work area appropriate to the construction process.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

application of Australian standards and manufacturer specifications

application of the Building Code of Australia (BCA)

communication skills to:

communicate information to client

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

identify and negotiate client requirements

seek advice

read and interpret:

legislative and planning requirements

relevant Australian standards

use and interpret non-verbal communication

use language and concepts appropriate to cultural differences

written skills to produce a waste management strategy

numeracy skills to apply calculations

problem solving to determine optimum waste minimisation practices.

Required knowledge

Required knowledge for this unit is:

building and construction industry processes for building sustainability

relevant state or territory building and construction codes, standards and government regulations

workplace safety requirements.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Strategies to minimise waste include:

procurement policies that encourage use of recyclable and recycled material

building to standard sizes

contracts with subcontractors that require implementation of waste minimisation

materials salvage and recycling

litter abatement

use of reusable delivery and storage containers.

Packaging waste reduction methods include the use of:

metal strapping in place of shrink wrapping

paper packaging in place of plastic

shredded paper packing in place of foam

recyclable or reusable containers.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Current relevant state, territory and council requirements for managing and minimising building waste are identified. 
Relative costs and savings associated with strategies to minimise waste are calculated and negotiated with client. 
Effective communications are established with the architect, designer, engineer and other relevant professionals to ensure project plans incorporate waste minimisation strategies. 
Relevant Australian standards are consulted to identify the implications of waste minimisation strategies for the conduct of the building project. 
Waste management strategy to support the building and construction project is developed. 
Building and construction materials are evaluated to identify high quality and more durable materials that will extend the life of the structure and simplify its future extension and refurbishment. 
Recycled materials are used where appropriate and with regard to regulatory and standards' restrictions. 
Procurement specifications are developed that seek to minimise packaging waste. 
Demolition practices are determined and used to increase the recovery of materials for recycling and reuse. 
Strategies are adopted to minimise the volume of site excavation and other materials that are disposed of in landfill. 
Litter abatement strategies are adopted on site. 
Safe and environmentally effective disposal of unavoidable waste is planned and implemented. 

Forms

Assessment Cover Sheet

CPCCBC4021A - Minimise waste on the building and construction site
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCBC4021A - Minimise waste on the building and construction site

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: