Assessor Resource

CPCCBL3003A
Carry out cavity brick construction

Assessment tool

Version 1.0
Issue Date: March 2024


This unit of competency supports achievement of skills in laying bricks to construct a cavity brick building, which includes working with others and as a member of a team.

This unit of competency specifies the outcomes required to construct cavity brick/block buildings and structures. It includes planning, preparation, set out and installation of the masonry.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry


Co-Requisites

Nil


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools, plant and equipment

communicate and work effectively and safely with others

as a minimum, given the plans and specifications, construct a section of a cavity brick building, including sub-floor walling; damp proof course (DPC) and ventilation; attached and isolated piers; openings (window and door) and lintels; brick cavity ties and roof tie-downs; and parapets (stepped flashing), ensuring:

correct identification of requirement and finishing of the task

correct selection and use of appropriate processes, tools and equipment

completing all work to specification ensuring correct selection and use of fire-rated materials and methods of construction.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

plans, specifications and drawings

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

numeracy skills to apply measurements and make calculations

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities.

Required knowledge

Required knowledge for this unit is:

brick and block expansion and growth, control and articulation joints

brick bond patterns

characteristics and applications of materials for cavity brick construction, including fire control and separation required by the Building Code of Australia (BCA) and other legislation

construction terminology

job safety analysis (JSA) and safe work method statements

material safety data sheets (MSDS)

materials storage and environmentally friendly waste management

plans, specifications and drawings

processes for the calculation of material requirements

quality requirements

techniques of cavity brick construction, including:

anti-termite measures

closing of cavities and capping systems

damp proofing

floor, wall and roof members

gable and eaves construction

lintels and load bearing components

stepped and level flashing for parapets and gables

sub-floor construction

tying components

ventilation

vermin control

types, characteristics, uses and limitations of plant, tools and equipment

workplace and equipment safety requirements.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

verbal or written and graphical instructions

signage

work schedules

plans and specifications

work bulletins

memos

MSDS

diagrams or sketches

safe work procedures related to carrying out cavity brick construction

regulatory and legislative requirements pertaining to carrying out cavity brick construction

manufacturer specifications and instructions where specified

organisation work specifications and requirements

instructions issued by authorised organisational or external personnel

relevant Australian standards.

Bricklaying and blocklaying tasks:

include all clay brick (wire cut/pressed) and concrete block (hollow and solid) masonry work

may be performed on a new construction site, an existing structure being renovated or extended or an existing structure subject to service restoration or maintenance.

Safety (OHS) is to be in accordance with legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:

emergency procedures, including emergency shutdown and stopping, extinguishing fires, organisational first aid requirements and evacuation

handling of materials

hazard control

hazardous materials and substances

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

underground services, including water, gas, electricity and communications

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

working with dangerous materials

organisational first aid

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

use of firefighting equipment

use of tools and equipment

workplace environment and safety.

Tools and equipment:

include:

bolsters

brick grabs and margin or raking tools

brooms

buckets

builders' lines

concrete mixers

dumpy levels

elevators

hammers (brickies, club and scutch)

hoses

jig saws

jointing tools

line blocks

line pins

mason's squares

masonry saws

measuring tapes and rules

mortar boards

plumb rules

profiles

shovels

spirit levels

straight edges

string lines

trowels

wheelbarrows

may include:

brick buggies

elevators

forklifts

materials hoists

pallet trolleys

scaffolds

small petrol or diesel engines or compressors.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications, where specified

workplace operations and procedures.

Materials include:

aggregates

cement

clay bricks

lime

masonry blocks

reinforcing materials

steel, aluminium and timber window frames

timber and steel door frames

waterproofing materials.

Environmental requirements include:

clean-up protection

noise and dust

vibration

waste management.

Statutory and regulatory authorities include:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Location of laid brickwork may be on a:

slab

suspended floor.

Brick or block cavity construction includes:

straight, square and plumb brick/block, wall ties and lateral support systems, dampcourse and flashings, openings and reinforcement

ensuring compliance with incipient spread of fire requirements.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to determine bricklaying and blocklaying tasks. 
Safety (OHS) requirements are followed in accordance with safety plans and policies. 
Signage and barricade requirements are identified and implemented. 
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. 
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. 
Materials appropriate to the work application, including required fire resistance rating, are identified, obtained, prepared, safely handled and located ready for use. 
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. 
Bricks and/or blocks are identified, selected and checked for conformity with specifications and compliance with standards. 
Work platform is erected in accordance with regulatory and workplace requirements. 
Location and structural details of brickwork/blockwork are identified from job drawings and job specifications. 
Base brickwork below floor construction is set out to location, dimensions and specifications in compliance with standards. 
Load bearing brickwork, including engaged piers, dwarf walls, isolated piers and corbelling are set out to job drawings and specifications. 
Cavity brick wall is set out to requirements of job drawings. 
Mortar mix is prepared and checked for conformity and bricks/blocks are laid to set out according to specifications and standards. 
Brickwork/blockwork gauge is determined and set out rod is prepared. 
Base brickwork/blockwork is constructed for cavity construction to requirements of regulations and specifications. 
Window frames are located and built in to cavity walls to specification, and are protected from mortar droppings during construction. 
Door jambs are located, built in and fixed to cavity walls and single leaf walls according to job drawings and specifications. 
Brick or block cavity construction walls are constructed to job specifications and standards. 
Damp proof courses and flashings are laid/built in to job specifications. 
Ventilation for solid brick construction is built to requirements of job specification and regulations. 
Walls are to be straight and true in plumb, line and level within standard tolerances. 
Wall ties are positioned to comply with standards. 
Openings are constructed and flashing is installed to job specifications. 
Lintels are installed to job specifications. 
Control joints are formed in accordance with locations on job drawings and standards. 
Weepholes, brick reinforcing, vermin proofing and wall flashings are located and built in to job specifications. 
Gables and parapets are constructed by plans and specifications. 
Sill bricks are cut and laid to line in accordance with job specifications. 
Tie down and lateral support systems for ceiling/roof structures are installed to walls in accordance with plans, specifications and standards. 
Joints of laid brickwork/blockwork are raked or ruled to correct depth and profile in accordance with job specifications. 
Brickwork/blockwork is brushed down prior to drying to remove unwanted mortar. 
Excess mortar is removed from brick/blockwork surfaces and cavities are cleaned free of mortar and debris in accordance with manufacturer recommendations, job specifications and standards. 
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. 

Forms

Assessment Cover Sheet

CPCCBL3003A - Carry out cavity brick construction
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCBL3003A - Carry out cavity brick construction

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: