Assessor Resource

CPCCCA3008A
Construct eaves

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency supports achievement of skills constructing eaves for roof finishing in a range of construction projects, which includes working with others and as a member of a team.

This unit of competency specifies the outcomes required to prepare, set out and construct eaves, including the cutting and fixing of fascias and barges to provide a finish between the wall and the roof. It includes boxed eaves and the finish to gable ends.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

CPCCOHS2001A Apply OHS requirements, policies and procedures in the construction industry


Co-Requisites

Nil


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools, plant and equipment

communicate and work effectively and safely with others

completion of marking and cutting of roof members to line to accommodate plumb fascia and barge for three metres of overhand barge eaves, three metres of boxed eaves and three metres of raking eaves, ensuring correct selection and use of fire-rated materials and methods of construction, each to include:

an apex junction on the barge

a junction between the barge and the plumb fascia

a junction at the valley

an eaves junction at the hip to a brick wall.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

plans, specifications and drawings

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

numeracy skills to apply measurements and make calculations

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

construction terminology

eaves construction techniques, including fire control and separation required by the Building Code of Australia (BCA) and other legislation

eaves materials, including their rated fire resistance

job safety analysis (JSA) and safe work method statements

levelling techniques

material safety data sheets (MSDS)

materials storage and environmentally friendly waste management

plans, specifications and drawings

plant, tools and equipment types, characteristics, uses and limitation

processes for the calculation of material requirements

quality requirements for eaves construction

roof geometry and construction

safe use of scaffolding

timber types, structural properties and uses, including engineered timber products

wall framing construction

workplace and equipment safety requirements.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions where specified

memos

MSDS

organisation work specifications and requirements

plans and specifications

regulatory and legislative requirements pertaining to constructing eaves

relevant Australian standards

safe work procedures related to constructing eaves

signage

verbal or written and graphical instructions

work bulletins

work schedules.

Planning and preparation include:

work site inspection

equipment defect identification

assessment of conditions and hazards

determination of work requirements.

Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

handling of materials

hazard control

hazardous materials and substances

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

earth leakage boxes

lighting

power cables, including overhead service trays, cables and conduits

restricted access barriers

surrounding structures

traffic control

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

working with dangerous materials

organisational first aid

personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices

use of firefighting equipment

use of tools and equipment

workplace environment and safety.

Tools and equipment include:

air compressors and hoses

bevels

chisels

hammers

hand saws

marking equipment

measuring tapes and rules

nail bags

nail guns

power drills

power saws and power leads

protractors

saw stools

scaffolding

spirit levels

squares (combination/tri)

stair clips and tables

steel squares and fence

string lines.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications, where specified

workplace operations and procedures.

Materials include:

beads

fibre cement sheeting

joining mould

metal

plaster

quads

reconstituted timber products

timber

timber battens

timber lining boards.

Environmental requirements include:

clean-up protection

noise and dust

vibration

waste management.

Statutory and regulatory authorities include:

federal, state and local authorities administering applicable Acts, regulations and codes of practice.

Gable ends:

can be boxed or raked and raked eaves

includes exposed rafters or soffit finish.

Fascia (and fascia gutter and barges) include:

methods include ensuring compliance with incipient spread of fire requirements methods

timber or metal and overhang types, including conventional fascia gutter and concealed.

Eaves design:

includes sloping soffits and boxed eaves

may incorporate verandas, concealed gutters and open eaves.

Joined includes:

jointing methods involving plastic, timber or metal moulds.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes. 
Safety (OHS) requirements are followed in accordance with safety plans and policies. 
Signage and barricade requirements are identified and implemented. 
Plant, tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement. 
Material quantity requirements are calculated in accordance with plans, specifications and quality requirements. 
Materials appropriate to the work application including required fire resistance rating are identified, obtained, prepared, safely handled and located ready for use. 
Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied. 
Passive and active fire control elements for eaves construction are identified and applied. 
Overhang of rafters is marked and cut to line, plumb and angle. 
Gable ends are trimmed for overhang where a verge rafter is not used. 
Fascia is fitted and fixed to roof structure overhang to line and level. 
Framework structure for eaves type are identified, and eaves design is established and set out to drawings and specifications. 
Timber framework members are set out, marked and cut to lengths in accordance with methods of joining and proposed framework structure. 
Boxed eaves constructed with soffit bearers are fixed to wall frame or supported by hangers from rafters, to line and level. 
Boxed eaves structure is installed, clear of top of masonry walls in veneer construction to allow for frame shrinkage and settlement. 
Eaves structure members are securely fixed, including back blocking and trimmers. 
Eaves cladding and sheeting material is marked and cut to shape to suit task application and jointing methods. 
Eaves lining, cladding and sheeting are fitted, joined and fixed in accordance with type of material, task application and specifications. 
Mouldings are fitted and fixed to specifications to finish eaves. 
Sloping eaves are fitted to underside of rafters or framing for fixing and joining of material. 
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. 

Forms

Assessment Cover Sheet

CPCCCA3008A - Construct eaves
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCCA3008A - Construct eaves

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: