Assessor Resource

CPCCCM1011A
Undertake basic estimation and costing

Assessment tool

Version 1.0
Issue Date: April 2024


This unit supports the attainment of basic understanding and application of construction estimating and costing.

This unit of competency specifies the outcomes required to estimate materials, labour and time requirements and establish costs for a basic construction project.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Nil


Co-Requisites

Nil


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications

comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations

comply with organisational policies and procedures, including quality requirements

safely and effectively use tools and equipment

communicate and work effectively and safely with others

document and communicate work-related information, including work orders, specifications, products, materials and labour requirements, costing calculations for products, materials and labour, and special conditions for a specified construction project

estimate and cost a specified project, including:

estimate quantities of material required

determine types and amount of labour required to complete the work

estimate time required to complete the work

estimate overheads associated with the project.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

determine requirements

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

follow instructions

read and interpret:

documentation from a variety of sources

drawings and specifications

report faults

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

written skills to record details of project, including costs and charges

numeracy skills to apply calculations

organisational skills, including the ability to plan and set out work

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities.

Required knowledge

Required knowledge for this unit is:

construction materials

construction terminology

costing techniques and procedures

job safety analysis (JSA) and safe work method statements

labour rates and overheads

material sizes

plans, specifications and drawings

processes for calculating material requirements

quality requirements

workplace and equipment safety requirements.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions where specified

material safety data sheets (MSDS)

memos

organisation work specifications and requirements

plans and specifications

relevant Australian standards

safe work procedures related to carrying out basic estimation

signage

verbal or written and graphical instructions

work bulletins

work schedules.

Planning and preparation include:

gathering and basic analysis of project plans and specifications

confirmatory work site inspection and determination of work requirements.

Estimation and costing includes:

overhead allowances

labour and materials

use of calculators and/or computers running appropriate software for estimating and calculating necessary details.

Quality requirements include:

internal company quality policy and standards

manufacturer specifications, where specified

relevant regulations, including Australian standards

workplace operations and procedures.

Materials for estimation and job costing include:

bagged materials

bricks

building elements, such as roof trusses, lining materials, flooring materials, prefabricated elements, boxed, drummed and tinned materials

other sheet materials applicable to construction

reconstituted timber products

sand

soil and aggregates

timber.

Environmental requirements include:

clean-up management

waste management.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Details of project requirements are obtained from information supplied for planning and preparation of estimating and costing. 
Details of products and services to be provided are compiled. 
Delivery point and methods of transportation are determined where necessary. 
Details are recorded in accordance with enterprise practice. 
Types, quantities and quality requirements of materials required for the construction project are estimated, including meeting environmental requirements. 
Labour requirements to achieve construction outcomes and/or perform required services are estimated. 
Time requirements to construct and/or perform required services are estimated. 
Total materials, labour and overhead cost allowances are calculated in accordance with enterprise procedures. 
Total job cost is calculated, including overheads and mark-up percentages. 
Final cost is calculated. 
Details of costs and charges are documented in accordance with enterprise practice. 
Costs, calculations or other details are verified in accordance with enterprise practice. 
Details are documented for future reference in accordance with enterprise practice. 

Forms

Assessment Cover Sheet

CPCCCM1011A - Undertake basic estimation and costing
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCCM1011A - Undertake basic estimation and costing

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: