Assessor Resource

CPCCCM2003B
Calculate and cost construction work

Assessment tool

Version 1.0
Issue Date: March 2024


The unit supports tradespersons and those in independent construction job roles to undertake basic costing of a minor construction job or a discrete part of a job. Site location for this work application may be either domestic or commercial.

This unit of competency specifies the outcomes required to estimate materials, labour and time requirements and establish costs for provision of services or products in basic construction work. It covers the gaining of information; the estimation of materials, labour and time; the calculation of costs; and the associated documentation.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Nil


Co-Requisites

Nil


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

locate, interpret and apply relevant information, standards and specifications to the estimation and costing of work

as a minimum, estimate and cost three varied jobs, including:

estimate quantities of material required

determine the types and amount of labour required to complete the work

estimate time required to complete the work

estimate overheads associated with the job

a written quotation/tender for each of the work requirements.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

an induction procedure and requirement

realistic tasks or simulated tasks covering the mandatory task requirements

relevant specifications and work instructions

tools and equipment appropriate to applying safe work practices

support materials appropriate to activity

workplace instructions relating to safe work practices and addressing hazards and emergencies

material safety data sheets

research resources, including industry related systems information.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

accessing current costing data

accurately calculating labour costs

accurately calculating material quantities

producing accurate written costing information

reading and interpreting drawings and material specifications.

Required knowledge

Required knowledge for this unit is:

application of GST

construction terminology

environmental and sustainability requirements

estimating and calculating processes

impact of time on wages and other costs

international system of units (SI) system of measurements relevant to the construction industry

process of estimating and costing construction work

quality requirements of construction projects

relevant statutory and authority requirements related to estimating and costing work

relevant tendering and contracting documentation

safe work method statements

sources of information and the processes for calculating material requirements

standards applicable to the work to be undertaken, e.g. Australian standards and the Building Code of Australia.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Plans and specifications include:

sketches or drawings

statements of requirements, including environmental requirements relating to the acquisition, use and disposal of materials

materials lists and quantity schedules

building codes

materials specifications, including specifications of material reuse and recycling.

Types and quantities of materials include consumables such as:

aluminium and steel framing and steel reinforcing

bricks, masonry blocks and pavers

cement, sand, aggregates and bonding agents

decorative finishing materials, such as wallpaper, laminates, gilding materials, lacquers and polishes

fixings, fastenings and adhesives

fuel and lubricants

paint, solvents and cleaning agents

tiles and glass

timber, plywoods, fibreboard and composites

wall and ceiling lining materials, plaster and platers products and external claddings.

Labour and overhead costs include:

labour costs, such as:

personal protective equipment

site facilities

wages and on-costs

overhead costs, such as:

administration

Insurance

local government fees and charges

plant and equipment hire

transport

use of communication technology

waste removal fees.

Costing documents include:

job sheets

materials list and estimates

quotations and tenders

work schedules.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Details of requirements are obtained and understood through discussion with customer or from information supplied. 
Plans and specifications are accessed and site is inspected to confirm full requirements. 
Details of products and services to be provided are developed and checked for availability and as fit for purpose. 
Delivery point and methods of transportation are determined where necessary. 
Details are accurately recorded and checked in accordance with workplace procedures. 
Work, including preparatory tasks, is planned and sequenced to cover all necessary activity. 
Types and quantities of materials required for product work are estimated based on availability, fitness for purpose and current costs. 
Labour requirements to perform work are estimated to complete the work activity. 
Time requirements to perform work are accurately estimated and checked with appropriate personnel. 
Total materials, labour and overhead costs are calculated in accordance with workplace procedures and statutory requirements. 
Total work cost is calculated, including overheads and mark-up percentages set by appropriate personnel. 
Final cost for work is calculated and checked for accuracy. 
Details of costs and charges are clearly and accurately documented in accordance with workplace procedures. 
Costs, calculations or other details are verified in accordance with workplace procedures and current costing data. 
Quotation/tender documentation is prepared and verified. 
Costing documents are accurately completed for future reference in accordance with workplace procedures. 

Forms

Assessment Cover Sheet

CPCCCM2003B - Calculate and cost construction work
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCCM2003B - Calculate and cost construction work

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: