Assessor Resource

CPCCPB3020A
Match, mitre and install cast ornamental cornices

Assessment tool

Version 1.0
Issue Date: April 2024


This unit supports the attainment of skills and knowledge to safely and efficiently install mitred ornamental cornices while working with others as a member of a team.

This unit of competency specifies the outcomes required to measure, match, cut and fix cast ornamental cornices.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

CPCCOHS2001A

Apply OHS requirements, policies and procedures in the construction industry


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

A person who demonstrates competency in this unit must be able to provide evidence of the ability to:

identify work order or contract and delivery documentation and match to delivered cornice

plan materials use and match mitres to minimise waste and maximise decorative effect

select and use appropriate cornice materials and work methods

plan and execute work within agreed timeframe and to a high standard under general supervision

apply a broad knowledge of industry products to identify:

hand manufactured and machine-made cornices

materials used in hand manufactured cornices and precautions for safe cutting

identify problems in pattern matching and cornice fixing and suggest appropriate alternative rectifications

interpret building plans and delivery documents to match cornice type to appropriate rooms

follow work instructions, operating procedures and inspection practices to:

prevent damage to goods, equipment or products

meet required work output and product quality

select and use appropriate personal protective equipment

minimise the risk of injury to self or others

work effectively with other workers on and off site

modify work activities to cater for variations in work site procedures, personnel, contexts and environment

maintain workplace records in relation to materials, plant and equipment use

follow safe handling requirements of equipment, products and materials.

Context of and specific resources for assessment

This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.

Assessment of essential underpinning knowledge will usually be conducted in an off-site context.

Assessment is to comply with relevant regulatory or Australian standards' requirements.

Resource implications for assessment include:

building framework with plasterboard clad walls

cast cornices

materials

tools and equipment.

Assessment of this unit of competency may be in conjunction with assessment of other units commonly performed at the same time in normal job roles.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Method of assessment

Assessment methods must:

satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package

include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application

reinforce the integration of employability skills with workplace tasks and job roles

confirm that competency is verified and able to be transferred to other circumstances and environments.

Validity and sufficiency of evidence requires that:

competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace

where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge

all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.

Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.

Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.

Guidance information for assessment

This unit could be assessed on its own or in combination with other units relevant to the job function, for example:

CPCCCM2010A Work safely at heights.

Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.

Assessment processes and techniques should, as far as is practical, take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

Required skills for this unit are:

communication skills to:

follow instructions

read and interpret:

documentation from a variety of sources

drawings and specifications

recognise procedures

report faults

enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand

use language and concepts appropriate to cultural differences

use and interpret non-verbal communication, such as hand signals

written skills to record results of checks and tests and relevant work completion procedures

evaluate own actions and make judgments about performance and necessary improvements

identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials

organisational skills, including the ability to plan and set out work

respond to change and contribute to workplace responsibilities, such as current work site environmental and sustainability frameworks and management systems

teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities

technological skills to:

use a range of mobile technology, such as two-way radio and mobile phones

voice and hand signals to access and understand site-specific instructions.

Required knowledge

Required knowledge for this unit is:

adjusting work activity to maintain quality standards

application of product and process knowledge to predict consequences and identify improvements

identifying and applying appropriate safety precautions to safely use equipment, and shift and handle products and materials

identifying and reading manufacturers' product installation procedures and nominated specifications for mixing adhesives, and fixing and cutting cornices

identifying faults in materials and construction that may influence the match mitre process

identifying materials used for hand and machine-made cornices by name and general application

identifying from workplace information and labels the type and purpose of materials and potential for health and safety risks for cornice and adhesives

job safety analysis (JSA) and safe work method statements

requirements for safe lifting and temporary fixing of cornice and safe work at heights.

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Information includes:

diagrams or sketches

instructions issued by authorised organisational or external personnel

manufacturer specifications and instructions, where specified

material safety data sheets (MSDS)

memos

regulatory and legislative requirements pertaining to plasterboard

relevant Australian standards

safe work procedures relating to fixing wall tiles

signage

verbal, written and graphical instructions

work bulletins

work schedules, plans and specifications.

Planning and preparation include:

assessment of conditions and hazards

determination of work requirements and safety plans and policies

equipment defect identification

work site inspection.

Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:

emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation

hazard control

hazardous materials and substances

organisational first aid

PPE prescribed under legislation, regulations and workplace policies and practices

safe operating procedures, including the conduct of operational risk assessment and treatments associated with:

concealed services (water, power and gas)

lighting

traffic control

restricted access barriers

trip hazards

work site visitors and the public

working at heights

working in confined spaces

working in proximity to others

use of firefighting equipment

use of tools and equipment

workplace environmental requirements and safety.

Tools and equipment include:

broad knives

brooms

electric screw guns

hand and power drills

hand saws

keyhole saws

measuring tapes and rules

paintbrushes

plasterboard hammers

plasterer's trowels

scaffold planks

T squares

taping knives

trestles.

Quality requirements include relevant regulations, including:

Australian standards

internal company quality policy and standards

manufacturer specifications

workplace operations and procedures.

Materials include:

beads

cement render

fibre cement sheets

finishing materials

plaster compounds

plasterboard

plasterglass sheets

water resistant plasterboard.

Environmental requirements include:

clean-up management

dust and noise

vibration

waste management.

Preparation of cornice adhesive is carried out using:

approved personal protective equipment

clean container

clean water.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Work instructions and operational details are obtained using relevant information, confirmed and applied for planning and preparation purposes. 
Safety (OHS) requirements are followed in accordance with safety plans and policies. 
Signage and barricade requirements are identified and implemented. 
Tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement. 
Material quantity requirements are calculated in accordance with plans and specifications and quality requirements. 
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use. 
Environmental requirements are identified for the project in accordance with environmental plans and regulatory obligations and applied. 
Style and type of cornice to be fitted is determined from work instructions. 
Cornice length for each work area is determined and noted. 
Cornice is handled following approved manual handling procedures. 
Requirements for safe work at heights are identified and planned for use. 
Matching points for ornamental cornice are determined and marked. 
Cornice is cut using workplace approved guides and cutting methods. 
Pattern match is checked. 
Manufacturers' instructions are consulted and applied to the preparation of the adhesive. 
Preparation of cornice adhesive is carried out. 
Adhesive powder is added to water until powder can absorb no more water. 
Consistency of mix is adjusted to suit hand or mechanical application of adhesive. 
Means for safe access for work at heights is used where required. 
Methods of holding cornice temporarily in place are planned and used following workplace-approved procedures. 
Appropriate amount of adhesive is applied to cornice. 
Cornice is fitted following workplace-approved practices for access to work at heights and manual handling. 
Excess cornice adhesive is removed. 
Joins, pattern matches and junctions are filled and smoothed. 
Temporary fixings and supports are removed and holes filled. 
Work area is cleared and materials and adhesives are disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification. 
Hazardous material is identified for separate handling. 
Non-toxic materials are removed using correct procedures. 
Dust suppression procedures are used to minimise health risk to work personnel and others. 
Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices. 

Forms

Assessment Cover Sheet

CPCCPB3020A - Match, mitre and install cast ornamental cornices
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPCCPB3020A - Match, mitre and install cast ornamental cornices

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: