This unit supports the attainment of skills and knowledge to repair and renovate a range of different roof structures, which includes working with others and as a member of a team.
This unit of competency specifies the outcomes required to repair and renovate roof tiles to different roof structures.
It includes the preparation for and replacement and fixing of tiles to the roof.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)
Prerequisites
CPCCOHS2001A
Apply OHS requirements, policies and procedures in the construction industry
Employability Skills
This unit contains employability skills.
Evidence Required
List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
as a minimum, replace approximately 1 square metre of damaged tiles in 5 square metre of a roof frame, including appropriate tile cutting, bedding and pointing, ensuring:
correct identification of requirement and installation and finishing of replacement tiles
correct selection and use of appropriate processes, tools and equipment
completing all work to specification.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Submission Requirements
List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here
Assessment task 1: [title] Due date:
(add new lines for each of the assessment tasks)
Assessment Tasks
Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.
Required skills
Required skills for this unit are:
communication skills to:
determine requirements
follow instructions
read and interpret:
documentation from a variety of sources
drawings and specifications
report faults
use language and concepts appropriate to cultural differences
use and interpret non-verbal communication, such as hand signals
identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials
numeracy skills to apply measurements and calculations
organisational skills, including the ability to plan and set out work
teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities
technological skills to:
use a range of mobile technology, such as two-way radio and mobile phones
voice and hand signals to access and understand site-specific instructions.
Required knowledge
Required knowledge for this unit is:
characteristics and applications of roof tiling materials
general construction terminology
job safety analysis (JSA) and safe work method statements
material safety data sheets (MSDS)
materials storage and environmentally friendly waste management
plans, drawings and specifications
plant, tools and equipment types, characteristics, uses and limitations
processes for the calculation of material requirements
quality requirements
roof construction systems and structures and tiling considerations
roof tiling techniques and procedures and the process of repairing/renovating tiled roofs
workplace and equipment safety requirements.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to repair and restoration of a tiled roof
relevant Australian standards
safe work procedures relating to repair and restoration of a tiled roof
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
includes replacing damaged roof tiles, including the preparation of the area, and the matching, installation and pointing of the replacement tiles
specifications include tile colour, tile profile, type of bond, nailing sequence and wind category
tiles may be interlocking or non-interlocking
types of terracotta tiles include Marseille, modern French, Swiss, Spanish and French
types of concrete tiles include Elebane, Villa, Centurian, Chateau and shingle (concrete)
pointing material may be flexible pointing material or its equivalent.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
working at heights
work site visitors and the public
working in proximity to others
working safely on roofs
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
air compressors and hoses
bedding frames
blowers
brooms
buckets
calculators
chalk lines
chisels
concrete mixers
elevators
fall safety devices
gutter protectors
hammers
hand saws
high pressure water cleaners
ladders
measuring tapes and rules
nail bags
nail guns
pincers
power drills
power leads
power saws
shovels
squares
string lines
tile cutters
trowels
may include:
scaffolds
small compressors
small petrol or diesel engines.
Materials include:
adhesives
concrete and terracotta tiles
fastenings and other mechanical fixings
flashings
mortar
sarking materials
timber and metal battens.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
stormwater management
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.
Observation Checklist
Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice
Yes
No
Comments/feedback
Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
Safety (OHS) requirements are followed in accordance with safety plans and policies.
Signage and barricade requirements are identified and implemented.
Plant, tools and equipment selected to carry out tasks that are consistent with the requirements of the job, checked for serviceability and any faults are rectified or reported prior to commencement.
Materials quantity requirements are calculated in accordance with plans, specifications and quality requirements.
Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
Damaged area is identified and located in accordance with job drawings and specifications.
Fall arrest system is installed in accordance with regulatory and workplace procedures.
Roofing materials and building component parts are safely and effectively handled using appropriate material handling techniques.
Damaged tiles are removed to ensure minimum disturbance to remaining roof tiles.
Pointing or mortar to be replaced is removed ensuring no damage to roof tiles.
Area to be repaired is left clean and free of loose waste.
Roof battens, sarking, boarding and flashing installations are checked for soundness and adequacy and replaced in accordance with job specifications.
Roof tiles are individually examined to ensure conformity to original roof tiles.
Mortar is mixed to required composition and job specifications.
Roof tiles are laid to maintain conformity to gauge, level alignment and plumb, while maintaining bond to specifications.
Roof tiles are laid to produce design features in accordance with original design and specifications.
Mortar joints are struck to match existing colour and loose mortar is removed from roof tile surface.
Pointing material is mixed to specifications.
Pointing material is applied to ridge tile joints to specification.
Joints are pointed to produce matching finish to existing surrounds and loose material is removed from roof tile surface.
Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
Forms
Assessment Cover Sheet
CPCCRT3004A - Repair and renovate tile roofs
Assessment task 1: [title]
Student name:
Student ID:
I declare that the assessment tasks submitted for this unit are my own work.
Student signature:
Result: Competent Not yet competent
Feedback to student
Assessor name:
Signature:
Date:
Assessment Record Sheet
CPCCRT3004A - Repair and renovate tile roofs
Student name:
Student ID:
Assessment task 1: [title] Result: Competent Not yet competent
(add lines for each task)
Feedback to student:
Overall assessment result: Competent Not yet competent