This unit applies to:
ducting systems for air conditioning, heating or ventilation purposes in buildings Class 1 or 2 with a maximum static pressure of 0.75kPa and a maximum velocity of 12.5 metres per second
piping systems conveying heating and chilled water operating at a maximum pressure of 700kPa or a maximum temperature of 100°C, with a maximum output of 50kW and total air quantities not exceeding 950 litres per second.
Site location for work application will be residential and commercial, and may be a new work site or an existing structure being renovated, extended, restored or maintained.
This unit of competency specifies the outcomes required to test and commission air and water heating and cooling systems.
It covers preparing for the work, determining testing requirements, preparing systems for balancing, and the physical balancing, testing and commissioning of the systems and completion of work finalisation processes, including recording.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)