Assessor Resource
CPCPWT3022A
Install and adjust water service controls and devices
Assessment tool
Version 1.0
Issue Date: March 2024
Site location for work application may be either domestic or commercial, and may be a new work site or an existing structure being renovated, extended, restored or maintained.
This unit of competency specifies the outcomes required to install water service controls and mixing devices used to manually control water mix and flow. It includes the basic adjustment and maintenance of correct flow operation for flushing devices, control valves, temperature control devices pumps and appliances, and excludes the commissioning and adjustment of backflow prevention devices and thermostatic mixing valves.
You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)