Assessor Resource

CPPBDN5013
Develop and collaborate on building information models for small-scale building design projects

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency specifies the outcomes required to develop three-dimensional (3-D) models of small-scale building design projects covered by the Building Code of Australia (BCA), except construction Type A buildings, into true building information models (BIM). It involves adding and adjusting values of components of building designs, communicating and collaborating with consultants and contractors from other disciplines involved in construction life cycle of small-scale building design projects, working live within the model alongside other disciplines, and creating project documentation using modelling software programs.

The unit supports the work of building information models for small-scale building design projects involving alterations and additions, heritage restorations, and new buildings, including houses, factories, motels, offices, restaurants, retail and service outlets, and warehouses. It applies to building designers who create and use BIMs to optimise productivity and enhance streamlining of the construction process.

Licensing, legislative, regulatory or certification requirements apply to this unit of competency in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Develop BIM project documentation.

1.1.

BIM project processes and schedules are planned and finalised in consultation with project stakeholders.

1.2.

Procedures to provide accurate and reliable exchange of project models are developed according to organisational andproject requirements.

1.3.

Project documentation is generated according to organisational and project requirements using outputs of functions of design technology tools.

2.

Develop a BIM project.

2.1.

Informationrelating to small-scale building design projects is analysed and applied to plans for BIM development.

2.2.

3-D models are created according to organisational and project requirements and software operating instructions using design technology tools.

2.3.

Building design data is embedded in project model objects to allow collaboration, integration and generation of required project documentation.

2.4.

BIM is checked and tested according to organisational and project requirements to confirm accuracy and functionality.

3.

Exchange and collaborate on project models.

3.1.

Transfer of BIM files is tested according to organisational procedures to ensure integrity of format, and data is retained on receipt.

3.2.

BIMs are provided to other consultants or contractors for addition of specialist data according to project requirements and data sharing protocols.

3.3.

BIMs or BIM data provided by other consultants or contractors are imported or linked and checked for integrity according to project and organisational requirements.

3.4.

BIMs are amended and manipulated live in collaboration with other contractors and consultants operating within the same model.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit.

The person must also develop and collaborate on building information models for three different projects, consisting of:

one Class 1 residential building of three storeys

one residential extension of at least 50 square metres

one of the following non-residential projects which must be of a maximum area of 2000 square metres:

incorporating Classes 2, 5, 6 and 7a

incorporating Classes 3 and 9c

incorporating Classes 7b and 8.

In doing the above, the person must:

produce interactive building information modelling (BIM) projects for use in consultation with project team

collaborate on BIM projects with a range of stakeholders, including:

integration of imported data as required by project specifications

live inter-operations as required by project specifications.

A person demonstrating competency in this unit must demonstrate knowledge of:

architectural styles and terminology that apply to the projects specified in the performance evidence

structural engineering principles sufficient to interpret and apply the requirements of the National Construction Code (NCC)

building designers’ duty of care to ensure quality and safety of designs

benefits and challenges of adopting a BIM approach to design production and documentation

contextual and site constraints to be incorporated into BIM

conventional and sustainable construction materials and methods, including their application, behaviour, characteristics, performance and interactions with other materials

design development and approval processes, and implications of changes to design at each stage

design drawing and representation methods

BIM design technology’s built-in tools and networking tools required to maintain two or more disciplines in a single project model within a local area network (LAN)

tools required to manage a project with two or more disciplines across a wide area network (WAN)

hazards of site, materials, construction practices and building use over its life cycle

key features of building life cycles

legislation, codes and standards that apply to sustainable design requirements for small-scale building design projects specified in the performance evidence

organisational scope of business, service levels and fees relating to planning processes

details required in BIM for planning processes

pricing of resources

principles of integrated project delivery

principles of sustainable design

project management strategies

scientific and social principles of human interactions with the built environment

tools required to create a realistic BIM implementation plan that responds to specific staff, financial and schedule constraints.

The following must be present and available to learners during assessment activities:

equipment:

computer with internet access and BIM-capable building design software

contingencies:

incompatible data import

specifications:

access to information regarding compliance requirements

relationships with team members and supervisor:

interactions with consultants and contractors from other disciplines is required

relationship with client:

client liaison is required.

Timeframe:

according to project schedule.

Assessor requirements

As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Develop BIM project documentation.

1.1.

BIM project processes and schedules are planned and finalised in consultation with project stakeholders.

1.2.

Procedures to provide accurate and reliable exchange of project models are developed according to organisational andproject requirements.

1.3.

Project documentation is generated according to organisational and project requirements using outputs of functions of design technology tools.

2.

Develop a BIM project.

2.1.

Informationrelating to small-scale building design projects is analysed and applied to plans for BIM development.

2.2.

3-D models are created according to organisational and project requirements and software operating instructions using design technology tools.

2.3.

Building design data is embedded in project model objects to allow collaboration, integration and generation of required project documentation.

2.4.

BIM is checked and tested according to organisational and project requirements to confirm accuracy and functionality.

3.

Exchange and collaborate on project models.

3.1.

Transfer of BIM files is tested according to organisational procedures to ensure integrity of format, and data is retained on receipt.

3.2.

BIMs are provided to other consultants or contractors for addition of specialist data according to project requirements and data sharing protocols.

3.3.

BIMs or BIM data provided by other consultants or contractors are imported or linked and checked for integrity according to project and organisational requirements.

3.4.

BIMs are amended and manipulated live in collaboration with other contractors and consultants operating within the same model.

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Organisational and project requirements must include:

communications protocols

file exchange formats

reporting requirements

project schedule.

Design technology tools must include at least one of the following proprietary 3-, 4- and 5-D modelling software or equivalent:

Autodesk Architectural Desktop

Autodesk Revit

Bentley Architecture

Graphisoft ArchiCAD

VectorWorks ARCHITECT.

Building design data must include:

details of compliance requirements, including those specified in:

Australian standards

client requirements

design specifications

legislation and regulations

manufacturer specifications

dimensions

labour costs

material costs

material properties:

acoustic values

energy efficiency

fire resistance

R-value and U-value

strength.

Objects must include:

customised imports

imports from online object libraries

new objects created by the designer.

A person demonstrating competency in this unit must satisfy the requirements of the elements, performance criteria, foundation skills and range of conditions of this unit.

The person must also develop and collaborate on building information models for three different projects, consisting of:

one Class 1 residential building of three storeys

one residential extension of at least 50 square metres

one of the following non-residential projects which must be of a maximum area of 2000 square metres:

incorporating Classes 2, 5, 6 and 7a

incorporating Classes 3 and 9c

incorporating Classes 7b and 8.

In doing the above, the person must:

produce interactive building information modelling (BIM) projects for use in consultation with project team

collaborate on BIM projects with a range of stakeholders, including:

integration of imported data as required by project specifications

live inter-operations as required by project specifications.

A person demonstrating competency in this unit must demonstrate knowledge of:

architectural styles and terminology that apply to the projects specified in the performance evidence

structural engineering principles sufficient to interpret and apply the requirements of the National Construction Code (NCC)

building designers’ duty of care to ensure quality and safety of designs

benefits and challenges of adopting a BIM approach to design production and documentation

contextual and site constraints to be incorporated into BIM

conventional and sustainable construction materials and methods, including their application, behaviour, characteristics, performance and interactions with other materials

design development and approval processes, and implications of changes to design at each stage

design drawing and representation methods

BIM design technology’s built-in tools and networking tools required to maintain two or more disciplines in a single project model within a local area network (LAN)

tools required to manage a project with two or more disciplines across a wide area network (WAN)

hazards of site, materials, construction practices and building use over its life cycle

key features of building life cycles

legislation, codes and standards that apply to sustainable design requirements for small-scale building design projects specified in the performance evidence

organisational scope of business, service levels and fees relating to planning processes

details required in BIM for planning processes

pricing of resources

principles of integrated project delivery

principles of sustainable design

project management strategies

scientific and social principles of human interactions with the built environment

tools required to create a realistic BIM implementation plan that responds to specific staff, financial and schedule constraints.

The following must be present and available to learners during assessment activities:

equipment:

computer with internet access and BIM-capable building design software

contingencies:

incompatible data import

specifications:

access to information regarding compliance requirements

relationships with team members and supervisor:

interactions with consultants and contractors from other disciplines is required

relationship with client:

client liaison is required.

Timeframe:

according to project schedule.

Assessor requirements

As a minimum, assessors must satisfy the assessor requirements in the Standards for Registered Training Organisations (RTOs) current at the time of assessment.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
BIM project processes and schedules are planned and finalised in consultation with project stakeholders. 
Procedures to provide accurate and reliable exchange of project models are developed according to organisational andproject requirements. 
Project documentation is generated according to organisational and project requirements using outputs of functions of design technology tools. 
Informationrelating to small-scale building design projects is analysed and applied to plans for BIM development. 
-D models are created according to organisational and project requirements and software operating instructions using design technology tools. 
Building design data is embedded in project model objects to allow collaboration, integration and generation of required project documentation. 
BIM is checked and tested according to organisational and project requirements to confirm accuracy and functionality. 
Transfer of BIM files is tested according to organisational procedures to ensure integrity of format, and data is retained on receipt. 
BIMs are provided to other consultants or contractors for addition of specialist data according to project requirements and data sharing protocols. 
BIMs or BIM data provided by other consultants or contractors are imported or linked and checked for integrity according to project and organisational requirements. 
BIMs are amended and manipulated live in collaboration with other contractors and consultants operating within the same model. 

Forms

Assessment Cover Sheet

CPPBDN5013 - Develop and collaborate on building information models for small-scale building design projects
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPPBDN5013 - Develop and collaborate on building information models for small-scale building design projects

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: