Assessor Resource

CPPPMT3042
Install physical termite management systems

Assessment tool

Version 1.0
Issue Date: April 2024


This unit of competency specifies the outcomes required to install physical termite management systems, including management systems that combine physical and chemical characteristics. The unit covers the ability to assess methods of construction of different premises, as well as techniques required to prevent termites gaining concealed access to a completed construction.

The unit covers applying a thorough understanding of client requirements and company information in order to install the systems. The selection of appropriate equipment, materials and methods is essential for performing the task safely and efficiently. These work functions would be carried out according to company guidelines and statutory requirements.

The unit supports pest management technicians responsible for applying physical termite management systems in both pre- and post-construction stages, in domestic, commercial and industrial buildings.

Licensing, legislative, regulatory or certification requirements apply to pest management in some States. Relevant state and territory regulatory authorities should be consulted to confirm those requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan for installation process.

1.1.

Installation requirements for termite management system are identified from work order, drawings and supervisor’s instructions.

1.2.

Work site plan is reviewed and installation specification is selected to prevent termite access according to work order and company and compliance requirements.

1.3.

Client is advised of installation procedure according to work order and company requirements.

1.4.

Quality assurance requirements are identified and applied to planning according to company and manufacturer requirements.

1.5.

Materials are selected and located in readiness for installation according to manufacturer specifications, and health and safety, company and manufacturer requirements.

1.6.

Equipment and tools consistent with installation requirements are selected, serviceability is checked, and faults are reported to appropriate persons according to manufacturer specifications and company and compliance requirements.

2.

Access and assess site.

2.1.

Work site is accessed according to client and company requirements.

2.2.

Installation method is reviewed according to work order and company and manufacturer requirements, and issues are clarified with appropriate persons.

2.3.

Previous trades work is checked for possible effect on proposed installation of termite management system according to company and manufacturer requirements.

2.4.

Work site is assessed for access during installation work and safety issues according to company and compliance requirements.

3.

Prepare site for installation.

3.1.

Hazards are identified and risks controlled at the work site according to company and compliance requirements.

3.2.

Usage pattern of work site is determined to ensure safety of personnel and efficient use of equipment and tools.

3.3.

Factors affecting completion of work order are identified and appropriate persons promptly advised.

4.

Prepare equipment.

4.1.

Suitable personal protective equipment (PPE) is selected and fitted according to manufacturer specifications and company and compliance requirements.

4.2.

Equipment and tools are set up according to manufacturer specifications and company and compliance requirements.

4.3.

Equipment and tools are adjusted according to manufacturer specifications to suit operator requirements.

5.

Install physical management system.

5.1.

Termite management system is installed to termite access points according to work order, manufacturer specifications and company requirements.

5.2.

Installation of termite management system is checked according to company and manufacturer requirements.

6.

Restore work site and complete documentation.

6.1.

Equipment, tools and waste are collected and removed according to work order, manufacturer specifications and company and compliance requirements.

6.2.

Work site is restored according to work order, client requests and company requirements.

6.3.

Equipment, tools and PPE are cleaned according to manufacturer specifications and company and compliance requirements.

6.4.

Equipment, tools and PPE are safety checked and required maintenance is recorded according to manufacturer specifications and company and compliance requirements.

6.5.

Cleaned equipment, tools and PPE are stored according to company requirements.

6.6.

Collected waste is disposed of according to work order, manufacturer specifications and company and compliance requirements.

6.7.

Client records are updated and regulatory and company documentation is completed and distributed according to company and compliance requirements.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions.

1.

Plan for installation process.

1.1.

Installation requirements for termite management system are identified from work order, drawings and supervisor’s instructions.

1.2.

Work site plan is reviewed and installation specification is selected to prevent termite access according to work order and company and compliance requirements.

1.3.

Client is advised of installation procedure according to work order and company requirements.

1.4.

Quality assurance requirements are identified and applied to planning according to company and manufacturer requirements.

1.5.

Materials are selected and located in readiness for installation according to manufacturer specifications, and health and safety, company and manufacturer requirements.

1.6.

Equipment and tools consistent with installation requirements are selected, serviceability is checked, and faults are reported to appropriate persons according to manufacturer specifications and company and compliance requirements.

2.

Access and assess site.

2.1.

Work site is accessed according to client and company requirements.

2.2.

Installation method is reviewed according to work order and company and manufacturer requirements, and issues are clarified with appropriate persons.

2.3.

Previous trades work is checked for possible effect on proposed installation of termite management system according to company and manufacturer requirements.

2.4.

Work site is assessed for access during installation work and safety issues according to company and compliance requirements.

3.

Prepare site for installation.

3.1.

Hazards are identified and risks controlled at the work site according to company and compliance requirements.

3.2.

Usage pattern of work site is determined to ensure safety of personnel and efficient use of equipment and tools.

3.3.

Factors affecting completion of work order are identified and appropriate persons promptly advised.

4.

Prepare equipment.

4.1.

Suitable personal protective equipment (PPE) is selected and fitted according to manufacturer specifications and company and compliance requirements.

4.2.

Equipment and tools are set up according to manufacturer specifications and company and compliance requirements.

4.3.

Equipment and tools are adjusted according to manufacturer specifications to suit operator requirements.

5.

Install physical management system.

5.1.

Termite management system is installed to termite access points according to work order, manufacturer specifications and company requirements.

5.2.

Installation of termite management system is checked according to company and manufacturer requirements.

6.

Restore work site and complete documentation.

6.1.

Equipment, tools and waste are collected and removed according to work order, manufacturer specifications and company and compliance requirements.

6.2.

Work site is restored according to work order, client requests and company requirements.

6.3.

Equipment, tools and PPE are cleaned according to manufacturer specifications and company and compliance requirements.

6.4.

Equipment, tools and PPE are safety checked and required maintenance is recorded according to manufacturer specifications and company and compliance requirements.

6.5.

Cleaned equipment, tools and PPE are stored according to company requirements.

6.6.

Collected waste is disposed of according to work order, manufacturer specifications and company and compliance requirements.

6.7.

Client records are updated and regulatory and company documentation is completed and distributed according to company and compliance requirements.

This section specifies work environments and conditions that may affect performance. Essential operating conditions that may be present (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) are included. Bold italicised wording, if used in the performance criteria, is detailed below.

Installation requirements must include:

identifiable areas that require protection

method of combining specifications and work order requirements

procedures and specifications from company training and reference manuals

techniques conveyed during product training courses.

Termite management system must include one of the following:

proprietary products that provide a barrier at termite access points

proprietary products used in combination that provide a comprehensive termite management system in line with regulatory requirements.

Compliance requirements must include:

Australian standards relating to installing physical termite management systems

industry advisory standards and codes of practice relating to installing physical termite management systems

commonwealth, state and territory legislation and local government regulations relating to installing physical termite management systems, including:

consumer protection

dangerous goods

pesticide registers and manifests

pesticide use

privacy

licensing requirements relating to installing physical termite management systems

public health and safety requirements relating to installing physical termite management systems, including those covering effects on:

general public and bystanders

non-target animals

occupants

work health and safety requirements relating to installing physical termite management systems, including:

procedures for hazard identification, risk assessment and hazard control, including hierarchy of hazard control

requirements of national registration authority and state government authorities

site inductions and client safety requirements

use of safe work methods, including use of pesticides according to manufacturer labels.

Appropriate persons must include one or more of the following:

clients

colleagues

managers

persons in control of work site

supervisors.

Previous trades work must include one or more of the following:

blocklaying

bricklaying

carpentry

concreting

electrical

plumbing.

Hazards to be considered must include:

animal bites and stings

pesticides and other chemicals

confined or restricted spaces

electrical

environmental contamination

fire

lighting

manual handling

moving vehicles and machinery

noise

remote locations

respiratory

slips and trips

temperature

ultraviolet (UV) radiation.

Personnel must include:

clients’ staff

colleagues

site visitors, including bystanders

work site staff and management.

Personal protective equipment must include:

appropriate eye, ear and respiratory protection

first aid kit appropriate to the task and location

site-specific PPE and clothing requirements

soap and towel

sun protection.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Installation requirements for termite management system are identified from work order, drawings and supervisor’s instructions. 
Work site plan is reviewed and installation specification is selected to prevent termite access according to work order and company and compliance requirements. 
Client is advised of installation procedure according to work order and company requirements. 
Quality assurance requirements are identified and applied to planning according to company and manufacturer requirements. 
Materials are selected and located in readiness for installation according to manufacturer specifications, and health and safety, company and manufacturer requirements. 
Equipment and tools consistent with installation requirements are selected, serviceability is checked, and faults are reported to appropriate persons according to manufacturer specifications and company and compliance requirements. 
Work site is accessed according to client and company requirements. 
Installation method is reviewed according to work order and company and manufacturer requirements, and issues are clarified with appropriate persons. 
Previous trades work is checked for possible effect on proposed installation of termite management system according to company and manufacturer requirements. 
Work site is assessed for access during installation work and safety issues according to company and compliance requirements. 
Hazards are identified and risks controlled at the work site according to company and compliance requirements. 
Usage pattern of work site is determined to ensure safety of personnel and efficient use of equipment and tools. 
Factors affecting completion of work order are identified and appropriate persons promptly advised. 
Suitable personal protective equipment (PPE) is selected and fitted according to manufacturer specifications and company and compliance requirements. 
Equipment and tools are set up according to manufacturer specifications and company and compliance requirements. 
Equipment and tools are adjusted according to manufacturer specifications to suit operator requirements. 
Termite management system is installed to termite access points according to work order, manufacturer specifications and company requirements. 
Installation of termite management system is checked according to company and manufacturer requirements. 
Equipment, tools and waste are collected and removed according to work order, manufacturer specifications and company and compliance requirements. 
Work site is restored according to work order, client requests and company requirements. 
Equipment, tools and PPE are cleaned according to manufacturer specifications and company and compliance requirements. 
Equipment, tools and PPE are safety checked and required maintenance is recorded according to manufacturer specifications and company and compliance requirements. 
Cleaned equipment, tools and PPE are stored according to company requirements. 
Collected waste is disposed of according to work order, manufacturer specifications and company and compliance requirements. 
Client records are updated and regulatory and company documentation is completed and distributed according to company and compliance requirements. 

Forms

Assessment Cover Sheet

CPPPMT3042 - Install physical termite management systems
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

CPPPMT3042 - Install physical termite management systems

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: