Assessor Resource

DEFCM311A
Implement and manage technical risk management

Assessment tool

Version 1.0
Issue Date: April 2024


This unit was developed for technical regulatory framework specialists working within the materiel logistics area of Defence but is applicable to any individual in this field of work.

Typically these individuals work independently or as part of a team under direct and/or indirect supervision, use discretion and judgement, and take responsibility for the quality of their outputs. All activities are carried out in accordance with relevant organisational policies and procedures

This unit covers the competency required to manage risk within the organisation's environment in order to avoid adverse effects on the technical integrity of the organisation's materiel.

It covers determining, monitoring and controlling risks, and assessing technical risk management outcomes.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The evidence guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for this Training Package.

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Assessment must confirm the ability to:

adhere to relevant data collection, storage and retrieval requirements

apply knowledge of technical risk management to assist in work and to guide problem solving

identify critical indicators of technical risk and assess the risk management system’s performance appropriate to the organisational context by determining, monitoring and controlling risks; and assessing technical risk management outcomes

work and communicate effectively and positively with others involved in the work

apply, within authority, the requirements of the job or work role in relation to implementing, monitoring, and successfully completing risk management activities; contributing to reports of results; completing work area housekeeping requirements including documenting risk management activity and process outcomes

modify activities to cater for variations in workplace context and environment

Consistency in performance

Competency should be demonstrated over time and should be observed in a range of actual or simulated work contexts

Context of and specific resources for assessment

Context of assessment

Competency should be assessed in the workplace or simulated workplace environment.

Specific resources for assessment

Access is required to:

computer and relevant software

relevant legislation, guidelines, procedures and protocols

plans

workplace documentation


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This describes the essential skills and knowledge and their level, required for this unit.

Required Skills

apply safety, legislative and statutory requirements relevant to technical risk management

apply technical risk management knowledge relevant to work being performed

interpret organisational role relevant to technical risk management

operate equipment and systems relevant to technical risk management activities

use appropriate information technology and software

Required Knowledge

appropriate risk management methodologies, their capabilities, limitations, applicability and outcomes

personal attitudes to uncertainty and risk, and how they might affect approaches to management of technical risk

place of risk management in the context of the materiel life cycle

technical regulatory framework, organisation's Engineering Management Plan and Risk Management Plan

technical risk management including application in the technical/engineering context of principles, tools, techniques, standards, and processes

uncertainty and the means of its measurement

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Technical risks may include:

Actual

Likely/probable

Mention in documents associated with:

design change

Engineering Management Plan

Risk Management Plan

appropriate standards

Potential

Perceived

Delegated technical/engineering authority may be:

Appointed in accordance with the relevant technical regulatory framework and refers to planning and activities that may:

be done independently within broad guidance or by taking the lead of a team

involve consultation with other team members, teams and internal stakeholders

involve the selection, use and supervision of appropriate technical risk management methods, tools and techniques

be conducted routinely or as changing circumstances dictate

Risk management techniques and tools may include:

Calling upon personal experience and/or subject matter experts

Conducting or supervising qualitative and/or quantitative risk analysis, such as schedule simulation, decision analysis, contingency planning and alternative strategy development

Using specialist risk analysis tools to assist in the decision making process

Risk management processes and procedures may include:

Communicating with stakeholders

Dispute resolution and modification procedures

Implementing risk control trigger mechanisms

Measuring actual progress against plans

Recording and reporting major variance

Recommended responses may include:

In consultation with team members, section heads, managers and stakeholders

Independently or with higher authority endorsement if necessary

Regularly throughout the materiel life cycle

Taking into account internal organisational change and external environmental change

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Technical risks are identified, documented and analyse, in consultation with stakeholders and a higher technical/engineering authority, as a basis for risk planning. 
Within delegated technical/engineering authority, established risk management techniques and tools are used to analyse risks and assess options, and preferred risk approaches are recommended to a higher technical/engineering authority. 
Plans are developed, agreed with stakeholders, and communicated to ensure clarity of understanding and ongoing management of technical risk factors. 
Designated risk management processes and procedures are established to enable effective management and communication of risk events, responses and results. 
Activities are managed in accordance with the organisation’s Engineering Management Plan to ensure a common approach to the achievement of objectives. 
Progress is monitored against the organisation’s Engineering Management Plan and Risk Management Plan to identify variances and recommended responses to a higher technical authority for remedial action. 
Agreed risk responses are implemented and plans are modified to reflect changing project objectives in an environment of uncertainty. 
Outcomes of technical/engineering risk management activities are reviewed to determine effectiveness of risk management processes and procedures. 
Risk issues and recommended improvements are identified, documented and passed on to a higher authority for application. 

Forms

Assessment Cover Sheet

DEFCM311A - Implement and manage technical risk management
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

DEFCM311A - Implement and manage technical risk management

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: