List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENTS | PERFORMANCE CRITERIA |
Elements describe the essential outcomes | Performance criteria describe the performance needed to demonstrate achievement of the element. Where bold italicised text is used, further information is detailed in the range of conditions section. |
1. Plan and prepare work site | 1.1 Select and wear personal protective equipment. 1.2 Conduct site layout and preparation in accordance with approved sketches, drawings, specifications and job instructions. 1.3 Inspect for serviceability and prepare for operation all tools and equipment and report defects to the supervisor. 1.4 Source, prepare and stockpile materials in accordance with work schedule, design specifications and job instructions. |
2. Build and maintain field structures | 2.1 Conduct earthworks for hardstanding, pits and trenches manually, or with plant and operator support, in accordance with specifications and site requirements. 2.2 Position fabricated/pre-fabricated components for assembly. 2.3 Assemble jigs, fixtures and other equipment apply to support construction. 2.4 Erect scaffolding in accordance with job requirements. 2.5 Lay/assemble concrete, bricks/blocks, timber, wire mesh, matting, steel and other materials according to job specifications. 2.6 Conduct horizontal and vertical construction to specification using expedient methods and materials available. 2.7 Camouflage site progressively and maintain concealment. 2.8 Check assembly/construction for compliance with specifications. |
3. Maintain and clean-up site and equipment | 3.1 Maintain, further develop and/or repair field structures to specification. 3.2 Remove from site, clean, service, maintain and store plant, vehicles, tools and other equipment and complete documentation. 3.3 Clear area and dispose of waste material. |
Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the candidate must demonstrate evidence of performance of the following on at least one occasion.
following instructions
reading drawings, plans and sketches
selecting construction materials
measuring relative to the construction process
utilising expedient and improvised methods to construct field structures
reporting information
laying out a site
preparing materials and equipment for construction
applying appropriate expedient construction methods and procedures to the construction including accurate measuring and levelling
using standard processes to handle and place materials
completing the construction of field structures to the specified standard
Evidence required to demonstrate competence must satisfy all of the requirements of the elements and performance criteria. If not otherwise specified the depth of knowledge demonstrated must be appropriate to the job context of the candidate.
workplace and equipment safety requirements
materials handling and storage
measurement relative to construction
expedient and improvised construction methods
types and use of field structures
drawings, plans and graphic representation including lettering, symbols tables, charts, specifications
techniques for supporting others
composition of teams and roles and responsibilities of team members
verbal and non-verbal communication techniques including language style, active listening
Competency should be demonstrated under field conditions over a time frame that allows for constructing and maintaining a number of field structures utilising expedient construction methods and a variety of materials. Assessment should include construction of at least three types of field structures, at least one above and one below ground structure.
Competency should be assessed in the workplace or in a simulated workplace environment.
Assessors must satisfy the NVR/AQTF mandatory competency requirements for assessors.