Assessor Resource

ICPPR322C
Produce complex gravure printed product

Assessment tool

Version 1.0
Issue Date: March 2024


This unit requires the individual to operate a gravure press ensuring an efficient non-routine production flow that maintains product quality standards. Any production problems are anticipated and rectified with minimum downtime. The machine is correctly shut down and cleaned according to OHS guidelines.

This unit describes the performance outcomes, skills and knowledge required to produce non-routine gravure printed product.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to:

operate a gravure press ensuring an efficient non-routine production flow that maintains product quality standards. Any production problems are rectified with minimum downtime. The machine is correctly shut down and cleaned according to OHS guidelines

demonstrate use of computerised control, monitoring and data entry systems if available and appropriate

demonstrate an ability to find and use information relevant to the task from a variety of information sources

monitor production output and make necessary adjustments to maintain print quality on a gravure machine whilst producing a complex print on TWO occasions (if possible using different substrates and if possible including at least TWO in-line processes) according to job specifications, enterprise procedures and the Performance Criteria

evidence for assessment may be gathered from assessment of the unit of competency alone or through an integrated assessment activity.

Context of and specific resources for assessment

Assessment must ensure:

assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment

gravure printing machine and in-line units.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:

ICPPR421C Set up for complex gravure printing


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

OHS in relation to operating machinery such as safely switching off machinery before cleaning is started

communication of ideas and information by interpreting the job brief and providing advice to clients about options and limitations

collecting, analysing and organising information by collecting and analysing data about printing process, machine specifications and performance to calculate appropriate adjustments for the job

planning and organising activities by providing information about time and materials requirements for production scheduling

teamwork when maintaining the production process in association with others

mathematical ideas and techniques by calculating substrate requirements, plate position and pressures

problem-solving skills by recognising proofing faults and calculating adjustments necessary to meet job specifications

use of technology by using monitoring equipment and making adjustments

Required knowledge

what could cause the reel to wander

what could cause the web to break at the unwind unit

what is the difference between a "flying paster" and "zero speed" type reel-stand

what print fault would result from the reel being run out of centre

what possible faults in the unwind section could cause a web break

what are the OHS risks associated with rewinding and sheeting

what safety feature is in the delivery system if the web jams up

why would the sheet cut-off wander

what is the effect of poorly adjusted nip rollers when rewinding and sheeting

how could a build-up of ink on the impression cylinder affect the printed product

what could cause the ink to foam in the ink tray

what is the effect of too much reducer in the ink

what action reduces wear of the doctor blade

why is it necessary that all solvents be removed from the final ink film

what is the link between driers and set off and marking

what could cause the substrate to distort

what would be the effect in the chillers if the drying temperature was too low

what is the effect of incorrect drying temperature on the finished product

why is it necessary to frequently examine the in-line components of the job

how is the consistency of the punching unit checked

what would be the result of excessive pressure on the slitters

what is the benefit of identification numbers on jobs with multiple similar images

how is the ratio of print to in-line speed controlled

what is the effect of inadequate communication within the work team on a gravure printing machine

what safety features within the organisation aid in maintaining effective production

what are the ramifications if machine guards are removed and/or micro switches are disconnected on a machine

who would be held legally responsible for the removal of machine guards and/or disconnection of micro switches

what is the most accurate method of checking register during a production run

why is it necessary to take immediate action when production problems are anticipated

what action is taken to eliminate further processing of unacceptable printed product

what will be the result to the substrate if the relative humidity is increased in the press room

what is the procedure to care for a newly delivered substrate to the press room

why should waste be sorted

what is the advantage of keeping reusable waste

what industry standards can be applied to enhance effective communication with the client

what are the necessary procedures that the client should follow to "OK" a printed product

when would it be necessary to call service personnel to correct a machine problem

what enterprise procedures are in place to report any machine operating problems

what would be the result if correct shutdown procedures were not followed

why is it necessary that correct shutdown procedures are conducted with fellow workers

what advantages result from proper labelling and storage of excess inks and materials

why should the printed product be clearly labelled prior to removal from the press room

what further operations are required for printed reels upon removal from the printing machine

how should the printed job be stored after removal from the printing machine

what OHS concerns should be observed when handling ink

what safety precautions should be observed when cleaning the printing cylinders

why is it necessary to thoroughly clean and wash up the printing unit prior to the next print run

why should the doctor blades be thoroughly cleaned

why should doctor blades be handled with extreme care

how can printing cylinders be stored so as to minimise damage

what OHS precautions should be observed when cleaning these sections of the machine

why is it necessary to maintain a clean substrate handling section of the machine

how are completed records used in the final analysis of the job

what are the benefits of comprehensive records when considering the production of future jobs

what machine manuals, safety and other documentation are relevant to this task and where are they kept and information included in these documents

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Substrate handling may include:

wide and narrow reel handling systems.

In-line processes may include:

minor processes that are integral to this competency can include basic in-line operations such as perforating, numbering, date coding, slitting that do not in themselves constitute another defined unit of competency. Where a major in-line process is defined as a separate competency (eg flat-bed cutting, folding) it should be assessed as such.

Inks/coatings may include:

range of inks commonly used in 3 or more colour printing, including standard and special colours.

Machines may include:

range of stack, in-line and central impression printing machines with manual, semi-automated, fully automated or computerised process control.

Colour matching systems may include:

use of viscosity controls, densitometers and spectrophotometry.

Design may include:

3 or more colours, complex graphics and text. Critical "tight" registration, fit and position, registration should be at least that required for four-colour process work.

Substrate types may include:

range of substrates within the major categories of paper, pressure sensitive materials, board, plastics and related films, or metal.

Non-routine may include:

non-routine within this context relates to the set up and production of print runs. The set up of equipment and production involves a significant amount of deviation from using standard equipment settings. It also involves significant problem solving and the development of new criteria and procedures for performing current practices. It does not refer to a job that an individual does only occasionally.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Reel stand is monitored and adjusted to ensure efficient continuous operation 
Web control system is monitored and adjusted to ensure correct tension and accurate continuous positioning of the web for efficient operation 
Substrate is added to process according to job instructions 
Reel rewind section is monitored and adjusted to maintain correct tension and to ensure no marks, blemishes or damage to finished product 
Substrate is removed from process according to job instructions 
Sheeting section is monitored and adjusted to ensure quality and efficient product delivery 
Set-off/marking prevention system is monitored and adjusted to ensure quality of printed product without set-off or marking meets the standard of approved proof 
Gravure cylinder condition is monitored and adjusted to ensure the quality of printed product meets the standard of the sample sheet 
Gravure impression roller condition is monitored and maintained to ensure the quality of printed product meets the standard of sample sheet 
Gravure inking system and doctor blade are monitored and adjusted to ensure quality of printed product meets the standard of sample sheet 
Drying systems are monitored and adjusted to ensure quality of printed product meets the standard of approved proof 
In-line printing/converting/binding/finishing processes are monitored 
In-line printing/converting/binding/finishing process are adjusted to ensure quality of product meets the standard of the approved proof 
Production process is operated in association with fellow workers and according to company specifications and planned daily schedule 
Production is maintained within OHS requirements and company and manufacturer's specifications 
Manual and/or automatic control is used as per specification 
Performance is monitored and verified using the process control system according to enterprise procedures 
Ink performance, colour, register and position of print are monitored and adjusted throughout production run 
Production difficulties are anticipated and preventive action is taken to prevent occurrence by timely intervention 
Process adjustments to eliminate problems are reported according to enterprise procedures 
Waste is sorted according to enterprise procedures 
Problem in gravure machine is identified and reported according to enterprise procedures 
Adjustments or corrections are carried out according to specified procedures and consistent with operator's skill level 
Gravure machine operation is checked to ensure correct operation 
Faulty performance of equipment is identified and reported according to enterprise procedures 
Correct shutdown sequence is followed according to manufacturer's specifications and enterprise procedures 
Shutdown is conducted in association with fellow workers and in compliance with OHS requirements 
Unused ink is correctly labelled and stored according to manufacturer/supplier specifications and enterprise procedures 
Solid and liquid waste is removed from operating area and recycled or disposed of, where required, according to regulatory requirements and enterprise procedures 
All product is removed from operating area 
Machine faults requiring repair are identified and reported to designated person according to enterprise procedures 
Repair/adjustment is verified prior to resumption of operations 
Cylinders, plate and roller surfaces are cleaned ready for next run 
Inking system is washed up ready for next run, and liquid waste is disposed of according to company and regulatory requirements 
In-line printing/converting/binding/finishing units are cleaned ready for next run 
Reel feed, transportation and delivery systems are disengaged and cleaned ready for next run 
Sheet feed, transport and delivery systems are disengaged and cleaned ready for next run 
Production records or other documentation are accurately completed where required by enterprise procedures 

Forms

Assessment Cover Sheet

ICPPR322C - Produce complex gravure printed product
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICPPR322C - Produce complex gravure printed product

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: