Assessor Resource

ICPPR471C
Set up for complex coating

Assessment tool

Version 1.0
Issue Date: April 2024


This unit requires the individual to set up rollers and the reel or sheet systems for coating a range of carbon, carbonless, latex, wax, resin and metallic coatings, aqueous and UV varnishes and machine varnishes. The individual will conduct a proof run and adjust settings to ensure production speeds are attained.

This unit describes the performance outcomes, skills and knowledge required to set up for non-routine coating.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit

Evidence of the ability to:

set up rollers and the reel or sheet systems for coating a range of carbon, carbonless, latex, wax, resin and metallic coatings, aqueous and UV varnishes and machine varnishes. The individual will conduct a proof run and adjust settings to ensure production speeds are attained

demonstrate use of computerised control, monitoring and data entry systems if available and appropriate

demonstrate an ability to find and use information relevant to the task from a variety of information sources

set up for THREE complex coating operations (one spot coating, one overall coating and one fine detail, using THREE different coatings of which one must be metallic) and if possible including at least ONE in-line process) according to manufacturer's and job specifications, enterprise procedures and the Performance Criteria

evidence for assessment may be gathered from assessment of the unit of competency alone or through an integrated assessment activity.

Context of and specific resources for assessment

Assessment must ensure:

assessment may take place on the job, off the job or a combination of these. Off the job assessment must be undertaken in a closely simulated workplace environment

dedicated coating machine.

Method of assessment

A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:

direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.

Guidance information for assessment

Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:

ICPPR472C Produce complex coated product.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Required skills

OHS in relation to operating machinery such as safely switching off machinery before cleaning is started

communication of ideas and information by interpreting the job brief and providing advice to internal and external clients about options and limitations

collecting, analysing and organising information by collecting and analysing data about coating process, machine specifications and performance to calculate appropriate adjustments for the job

planning and organising activities by providing information about time and materials requirements for production scheduling

teamwork when cooperating with other workers and coordinating the production unit to ensure efficient operation

mathematical ideas and techniques by calculating substrate requirements, plate or blanket position, and pressures

problem-solving skills by recognising proofing faults and calculating adjustments necessary to meet job specifications

use of technology by using monitoring equipment and computerised production records

Required knowledge

information on the work ticket listing the type of coating required

action taken if vital information were missing from the job ticket

checks that should be undertaken prior to set up (availability of materials etc)

major OHS concerns when setting up the sheet or reel transportation system

choosing the coating side of the material

effect of low web tension on the print

effect of inefficient web splices

determining the sheet or reel position for the job

effect he side lay selection has on the job

selecting the appropriate front lays

carrying out a register check

use of a two-sheet cut out on most feeders (sheet)

checking of a sheet is missing or late

checking of a web break

safety risks associated with the rewind of the machine

effect of excessive web tension at the rewind of the machine

effect that too much vacuum on the slow-down wheels has on the job

determining the position of register or bustle wheels

effect that excessive jogging would have on the stack

OHS concerns that are relevant to the use of coatings

types of coatings and their applications

suitability of the coating for the job

ability of the coat to adhere to the product

amount of coating required

range of viscosities that should you run with on an aqueous coating

effect of incorrect viscosity on coating

adjusting the viscosity of a coating

methods that the coating use to solidify

drying UV coating

printing principle that is being utilised to apply aqueous coating

importancethat gluing tabs are not coated

temperature the drier is set at to dry aqueous coating

determining which image carrier (plate or blanket) to use

position of the coating checked against the print

effect that skeleton wheels could have on the surface of the coating

measuring the amount of gloss on the surface

responsibility for the final "OK" on the job

effect that you get when you don't have enough coating on a sheet

effect that a UV coating would have on a wet print

effect that excessive temperature would have on the sheet

effect that you would get if the viscosity were too high or too low

effect that you would get if ink coverage were excessive, ie over 250%

machine manuals, safety and other documentation that are relevant to this task and where they are kept and information that is included in these documents

The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.

Substrate handling may include:

narrow or wide reel handling, and small and large sheet systems.

Coatings may include:

a range of carbon, carbonless, latex, wax, resin and metallic coatings, aqueous and UV varnishes and machine varnishes.

Machines may include:

a range of dedicated coating machines with manual, semi-automated, fully automated or computerised process control.

Colour matching systems may include:

use of visual colour assessment and densitometry to match basic standard tints under controlled lighting conditions.

Design may include:

spot coating, overall coating and fine detail coating.

In-line processes may include:

minor processes that are integral to this competency can include basic in-line operations such as perforating, numbering, date coding, slitting that do not in themselves constitute another defined unit of competency. Where a major in-line process is defined as a separate competency (eg flat-bed cutting, folding) it should be assessed as such.

Substrate types may include:

full range of substrates within the major categories of paper, pressure sensitive material, board, plastics and related films, or metal.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Job requirements are read and interpreted from job documentation or production control system 
Set up is planned and carried out correctly and in minimum time 
Availability of all job related components is checked 
Unwind set up and adjusted according to job specifications 
Webbing procedures are carried out and web-control system is set up and adjusted according to job specifications 
Reels are spliced/joined according to job specifications 
Printed web viewing devices are set up and adjusted according to job specifications 
Set off/marking prevention devices are set up and adjusted according to job specifications 
Feeder and delivery is set up and adjusted according to job specifications 
Sheet pick-up and transportation system is set up and adjusted according to job specifications 
Transfer and control systems are set up and adjusted according to job specifications 
Substrate is added to and removed from process according to job instructions 
Set off/marking prevention devices are set up and adjusted according to job specifications 
Coating is selected according to job specifications and end-user requirements 
Quality and suitability of coating is checked and appropriate action is taken 
Coatings and additives are prepared according to OHS requirements, and manufacturer's/supplier's instructions with suitable precautions to minimise waste 
Correct weight/volume of coating is prepared to match the requirements of the job specification and the coating process 
Check the viscosity of coating is correct for the job 
Formulation of the coating is appropriately recorded 
Appropriate rollers/cylinders are selected and secured to the machine and set 
Application system is set up and adjusted according to job specifications 
Choose appropriate anilox roller and ensure it is installed to manufacturer's specifications 
Set doctor blades to manufacturer's specifications 
Coating delivery system is set up with correct flow and return flow determined by air pressure or pump speeds and adjusted according to job specifications 
Cut a coating blanket or install a plate for non-image areas 
Check that blanket or plate packing is suitable to the job 
Check that the coating temperature is suitable for the job 
Drying system is set up and adjusted according to job specifications 
Material to be used for proof is organised correctly 
Machine is set up and operated, and roller and pressure settings are checked, to produce a specified proof according to OHS requirements, manufacturer's specifications and enterprise procedures 
Proof is visually inspected and/or tested or laboratory testing organised according to enterprise procedures 
Production does not commence without client OK or authority where appropriate 
Results are interpreted and adjustment changes are carried out according to product and machine specifications to determine adjustment requirements 

Forms

Assessment Cover Sheet

ICPPR471C - Set up for complex coating
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICPPR471C - Set up for complex coating

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: