ICTCBL308
Install underground cable

Assessment tool

Version 1.0
Issue Date: April 2024


This unit describes the skills and knowledge required to install underground cable for all communications applications in access networks or client premises.

It applies to technical staff who install cable for new and upgrades of telecommunications cabling infrastructure for communications applications including broadcasting or reception (digital video broadcasting – terrestrial [DVB-T], digital video broadcasting – satellite [DVB-S], long term evolution [LTE]), closed-circuit television (CCTV), digital and analog, telephony, data, video, digital broadcasting, computer networks, local area networks (LAN), wide area networks (WAN), fibre optic networks and multimedia.

Work functions in the occupational areas where this unit may be used are subject to regulatory requirements. Refer to the Implementation Guide Companion Volume or the relevant regulator for specific guidance on requirements.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Prepare for underground cable hauling

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards

1.2 Arrange access to site according to required procedure

1.3 Verify cable installation requirements from plan and recognise constraints

1.4 Inform appropriate personnel of existing and potential hazards on worksite

1.5 Obtain information on location of other services from relevant authorities

1.6 Select suitable tools and equipment and protective equipment to meet required industry standards

1.7 Erect barriers according to safety requirements

1.8 Set up cable installation equipment according to manufacturer’s requirements and enterprise guidelines

1.9 Clean debris and obstructions from conduit using suitable safe methods

1.10 Seal cable ends to exclude ingress of foreign matter

2 Haul underground cable

2.1 Run hauling feeder through conduit to enable cable hauling following work health and safety (WHS) and environmental requirements

2.2 Attach cable to hauling feeder according to manufacturer’s specifications

2.3 Employ cable slippers or rollers to ensure no sheath damage when hauling into and out of enclosures

2.4 Lubricate cable and haul evenly at correct tension to reduce risk of cable damage

2.5 Maintain sufficient cable length allowance for jointing

3 Seal and secure cable and complete all documentation

3.1 Tag all cables to enable future identification

3.2 Seal cable ends to prevent ingress of foreign material

3.3 Place cable on supports in enclosures to reduce damage to conductors and enable ease of access for maintenance

3.4 Fit over voltage protection devices to all cables with metallic component where required

3.5 Complete reports on installation and design amendments accurately and file promptly according to client requirements

3.6 Reinstate site to identified requirements if required

3.7 Notify client and obtain sign off

Evidence of the ability to:

haul underground cable to industry standards

restore site and complete documentation

comply with all related safety requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe the Australian Communications and Media Authority (ACMA) regulation requirements for Telecommunications Cabling Provider Rules

recognise the features and operating requirements of hauling equipment

identify legislation, codes of practice and other formal agreements that impact on hauling

outline the manufacturer’s requirements for safe operation of hauling equipment

specify health and safety requirements relating to the hauling and site conditions

identify typical issues and challenges that occur on the worksite.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – cabling field of work and include access to:

sites where installation of underground cable may be conducted

installation equipment currently used in industry

relevant regulatory and equipment documentation that impacts on cable installation activities.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1 Prepare for underground cable hauling

1.1 Prepare for given work according to relevant legislation, codes, regulations and standards

1.2 Arrange access to site according to required procedure

1.3 Verify cable installation requirements from plan and recognise constraints

1.4 Inform appropriate personnel of existing and potential hazards on worksite

1.5 Obtain information on location of other services from relevant authorities

1.6 Select suitable tools and equipment and protective equipment to meet required industry standards

1.7 Erect barriers according to safety requirements

1.8 Set up cable installation equipment according to manufacturer’s requirements and enterprise guidelines

1.9 Clean debris and obstructions from conduit using suitable safe methods

1.10 Seal cable ends to exclude ingress of foreign matter

2 Haul underground cable

2.1 Run hauling feeder through conduit to enable cable hauling following work health and safety (WHS) and environmental requirements

2.2 Attach cable to hauling feeder according to manufacturer’s specifications

2.3 Employ cable slippers or rollers to ensure no sheath damage when hauling into and out of enclosures

2.4 Lubricate cable and haul evenly at correct tension to reduce risk of cable damage

2.5 Maintain sufficient cable length allowance for jointing

3 Seal and secure cable and complete all documentation

3.1 Tag all cables to enable future identification

3.2 Seal cable ends to prevent ingress of foreign material

3.3 Place cable on supports in enclosures to reduce damage to conductors and enable ease of access for maintenance

3.4 Fit over voltage protection devices to all cables with metallic component where required

3.5 Complete reports on installation and design amendments accurately and file promptly according to client requirements

3.6 Reinstate site to identified requirements if required

3.7 Notify client and obtain sign off

Evidence of the ability to:

haul underground cable to industry standards

restore site and complete documentation

comply with all related safety requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe the Australian Communications and Media Authority (ACMA) regulation requirements for Telecommunications Cabling Provider Rules

recognise the features and operating requirements of hauling equipment

identify legislation, codes of practice and other formal agreements that impact on hauling

outline the manufacturer’s requirements for safe operation of hauling equipment

specify health and safety requirements relating to the hauling and site conditions

identify typical issues and challenges that occur on the worksite.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – cabling field of work and include access to:

sites where installation of underground cable may be conducted

installation equipment currently used in industry

relevant regulatory and equipment documentation that impacts on cable installation activities.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Prepare for given work according to relevant legislation, codes, regulations and standards 
Arrange access to site according to required procedure 
Verify cable installation requirements from plan and recognise constraints 
Inform appropriate personnel of existing and potential hazards on worksite 
Obtain information on location of other services from relevant authorities 
Select suitable tools and equipment and protective equipment to meet required industry standards 
Erect barriers according to safety requirements 
Set up cable installation equipment according to manufacturer’s requirements and enterprise guidelines 
Clean debris and obstructions from conduit using suitable safe methods 
Seal cable ends to exclude ingress of foreign matter 
Run hauling feeder through conduit to enable cable hauling following work health and safety (WHS) and environmental requirements 
Attach cable to hauling feeder according to manufacturer’s specifications 
Employ cable slippers or rollers to ensure no sheath damage when hauling into and out of enclosures 
Lubricate cable and haul evenly at correct tension to reduce risk of cable damage 
Maintain sufficient cable length allowance for jointing 
Tag all cables to enable future identification 
Seal cable ends to prevent ingress of foreign material 
Place cable on supports in enclosures to reduce damage to conductors and enable ease of access for maintenance 
Fit over voltage protection devices to all cables with metallic component where required 
Complete reports on installation and design amendments accurately and file promptly according to client requirements 
Reinstate site to identified requirements if required 
Notify client and obtain sign off 

Forms

Assessment Cover Sheet

ICTCBL308 - Install underground cable
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTCBL308 - Install underground cable

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: