ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1 Prepare for underground cable hauling | 1.1 Prepare for given work according to relevant legislation, codes, regulations and standards 1.2 Arrange access to site according to required procedure 1.3 Verify cable installation requirements from plan and recognise constraints 1.4 Inform appropriate personnel of existing and potential hazards on worksite 1.5 Obtain information on location of other services from relevant authorities 1.6 Select suitable tools and equipment and protective equipment to meet required industry standards 1.7 Erect barriers according to safety requirements 1.8 Set up cable installation equipment according to manufacturer’s requirements and enterprise guidelines 1.9 Clean debris and obstructions from conduit using suitable safe methods 1.10 Seal cable ends to exclude ingress of foreign matter |
2 Haul underground cable | 2.1 Run hauling feeder through conduit to enable cable hauling following work health and safety (WHS) and environmental requirements 2.2 Attach cable to hauling feeder according to manufacturer’s specifications 2.3 Employ cable slippers or rollers to ensure no sheath damage when hauling into and out of enclosures 2.4 Lubricate cable and haul evenly at correct tension to reduce risk of cable damage 2.5 Maintain sufficient cable length allowance for jointing |
3 Seal and secure cable and complete all documentation | 3.1 Tag all cables to enable future identification 3.2 Seal cable ends to prevent ingress of foreign material 3.3 Place cable on supports in enclosures to reduce damage to conductors and enable ease of access for maintenance 3.4 Fit over voltage protection devices to all cables with metallic component where required 3.5 Complete reports on installation and design amendments accurately and file promptly according to client requirements 3.6 Reinstate site to identified requirements if required 3.7 Notify client and obtain sign off |
Evidence of the ability to:
haul underground cable to industry standards
restore site and complete documentation
comply with all related safety requirements and work practices.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
describe the Australian Communications and Media Authority (ACMA) regulation requirements for Telecommunications Cabling Provider Rules
recognise the features and operating requirements of hauling equipment
identify legislation, codes of practice and other formal agreements that impact on hauling
outline the manufacturer’s requirements for safe operation of hauling equipment
specify health and safety requirements relating to the hauling and site conditions
identify typical issues and challenges that occur on the worksite.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – cabling field of work and include access to:
sites where installation of underground cable may be conducted
installation equipment currently used in industry
relevant regulatory and equipment documentation that impacts on cable installation activities.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.