List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare for customer premises systems and equipment installation | 1.1 Prepare for given work according to relevant legislation, codes, regulations and standards 1.2 Arrange access to site according to required procedure 1.3 Inform appropriate personnel of existing and potential hazards on worksite 1.4 Verify location of proposed customer communications equipment installation according to plans obtained from authorised personnel 1.5 Develop installation plans to ensure minimal disruption to workplace and according to standards 1.6 Select suitable tools and equipment |
2. Install system hardware | 2.1 Install network equipment following work health and safety (WHS) and environmental requirements according to manufacturer’s instructions 2.2 Confirm service interruption is within limits agreed with customer 2.3 Complete cable jumpering to distribution infrastructure and terminal equipment to specification 2.4 Document all installation drawings for customer |
3. Configure and test system | 3.1 Install software and, if required, configure system according to specifications 3.2 Test to verify system performance according to customer requirements 3.3 Record all test results |
4. Clean up worksite and compete documentation | 4.1 Remove and dispose of installation waste and debris from worksite according to environmental requirements 4.2 Restore worksite to customer’s satisfaction 4.3 Complete all installation documents and present to customer 4.4 Notify customer and obtain signoff |
Evidence of the ability to:
read and interpret:
related floor plans
building plans
reflected ceiling plans
schematic drawings
install customer premises equipment
configure and test systems and equipment
apply relevant regulations and standards
comply with all related health and safety requirements and work practices.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
identify and select cabling types, connectors and cabling structures
describe the connections to carrier infrastructure or equipment, such as main distribution frame (MDF) or asymmetric digital subscriber line (ADSL), multiplexer (MUX), integrated services digital network (ISDN), network termination device (NTD) or other carrier interface unit
recognise electrical and/or optical properties to be measured
explain the health and safety considerations for the works including:
electrical safety
lifting hazards
manufacturer’s requirements for safe operation of equipment
describe the equipment to be installed on the customer's premises
identify and select the test methods and performance requirements for the installation
identify typical issues and challenges that occur on the worksite.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – cabling field of work and include access to:
a site where installation of electronic equipment and customer cabling may be conducted
plant, tools and equipment currently used in industry
relevant regulatory and equipment documentation that impacts on work activities.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.