List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare system and equipment cutover | 1.1 Obtain relevant legislation, codes, regulations and standards 1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements 1.3 Notify appropriate personnel of identified safety hazards at worksite 1.4 Determine cable route and type of cable and equipment from project plan, and identify and avoid other services 1.5 Obtain plant, tools and safety equipment, and material to perform tasks safely and efficiently 1.6 Prepare implementation plan with cutover tasks based on identified nature of job, and seek customer approval 1.7 Notify customer and network carrier of proposed cutover details and arrange for customer representation |
2. Cutover system or equipment into service | 2.1 Perform cutover tasks and connect network facilities according to approved plan, following health and safety and environmental requirements for given work 2.2 Test all cable connections, equipment and facilities as instructed in technical manuals and specifications 2.3 Evaluate test results to ensure proper system operation and performance, and rectify if required |
3. Complete project documentation | 3.1 Record test results for future reference, complete reports on cutover installation and design amendments according to enterprise requirements 3.2 Recover obsolete materials and equipment, and return to appropriate point for disposal 3.3 Restore siteaccording to requirements of enterprise or approving authority and to customer satisfaction 3.4 Notify appropriate personnel of job completion and obtain sign off |
Evidence of the ability to:
read and interpret plans and specifications
develop and implement a cutover work plan
install customer premises equipment
configure and test systems and equipment
apply relevant regulations and standards.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
identify and select cabling types, connectors and cabling structures
describe the legislation, codes of practice and other formal agreements that impact on the work activity
describe the manufacturer’s requirements for safe operation of equipment
explain the equipment requiring cutover at the customer's premises
specify the health and safety requirements relating to the activity and site conditions
identify and select the test methods and performance requirements
describe the features and operating requirements of test equipment for cutover
identify typical issues and challenges that occur on the worksite.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – cabling field of work and include access to:
a site where installation of customer premises equipment may be conducted
plant, tools and equipment currently used in industry
relevant regulatory and equipment documentation that impacts on work activities.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.