List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Confirm delivery and acceptance plan | 1.1 Confirm phased delivery with the client and project team 1.2 Confirm method of acceptance and acceptance criteria 1.3 Confirm that acceptance test plan is in place and agreed |
2. Confirm data take-up plan | 2.1 Identify the data source for each database 2.2 Analyse possible integrity constraints 2.3 Design the data conversion workflow, taking into consideration data validation, data clean-up and data loading 2.4 Identify interface requirements, data take-up method, complexity and effort required 2.5 Develop required data conversion contingencies and confirm with appropriate person |
3. Confirm cutover plan | 3.1 Agree on the conversion window in operational timescale with appropriate person 3.2 Plan and confirm parallel running with appropriate person 3.3 Confirm approval of dependencies with appropriate person 3.4 Confirm approval of fall-back options with appropriate person 3.5 Confirm approval of checkpoints, tests and responsibilities with appropriate person 3.6 Confirm approval of resources, tasks and timescales with appropriate person |
Evidence of the ability to:
confirm acceptance plan
develop a data take-up plan
confirm cut-over plan.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
discuss and apply conversion strategies
outline current business practices related to transition strategies
discuss cut-over strategies
discuss post-converging strategies.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the general information and communications technology (ICT) industry, and include access to:
ICT specifications
change management plan
acceptance test plan
ICT security assurance specifications.
Assessors must satisfy NVR/AQTF assessor requirements.