List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Element | Performance Criteria |
Elements describe the essential outcomes | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Scope the project | 1.1 Prepare for work according to site specific safety requirements and enterprise work health and safety (WHS) processes and procedures 1.2 Determine type of access network by accessing and using network information sources 1.3 Produce a brief on how access network architecture components relate to the larger network and their impact on the work 1.4 Evaluate equipment type and technologies to be considered, to determine availability and compatibility with existing network equipment 1.5 Obtain resources and equipment needed for the work according to enterprise procedures and check for correct operation and safety 1.6 Assess capacity limitations of various platforms in the context of the work to ensure maximum network performance 1.7 Determine product capability and calculate allowable capacity of the access network to allow for network growth |
2. Produce deployment plan for an Access Network | 2.1 Conduct planning work using current equipment components and complying with access network deployment rules and exemption process criteria 2.2 Produce a preliminary plan on deployment of the network that maintains integrity of the access network 2.3 Discuss unexpected situations with appropriate personnel, with consideration to job specifications, safety and enterprise procedures to establish a solution 2.4 Review plan to ensure it complies with all standards and codes required when working on network access, and where appropriate make adjustments |
3. Complete work and report its impact on network access | 3.1 Produce final deployment plan including recommendations agreed with customer 3.2 Provide a report on network monitoring techniques used to manage the network to ensure it is performing at optimum level |
Evidence of ability to:
gather data appropriately within information sources and evaluate how the data relates to the access architecture
source current major equipment and technologies used in an access network and detail their compatibilities
accurately plan deployment of an access network architecture, including deployment rules, capacity and capability management and monitoring techniques
complete work within a timeframe typically expected of the discipline, work function and industrial environment.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
outline the features of an access network, including:
architectures and geographical categorisation
information sources
technology and equipment
define capacity and capability management
identify capacity limitation of various platforms
describe commercial considerations of access network deployment
identify compatibility issues of technology and equipment
explain currency of technology and equipment use
summarise enterprise deployment rules and rationale
identify exemption process criteria
identify major equipment components of a modern access architecture
describe monitoring techniques to manage the access network
outline network topologies
identify product capability and availability allowable within an access network
outline telecommunications access networks issues and challenges.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the Telecommunications – Network Planning field of work and include access to:
network design documentation and other site-related documentation
equipment specifications
live network or training facilities
organisational guidelines
networked computers
networked telecommunications components.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.