List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Element | Performance Criteria |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Evaluate building environment requirements | 1.1 Utilise network equipment deployment plans to convert network equipment specifications into building requirements data 1.2 Determine planned and forecast network equipment deployment locations and quantities to prioritise tasks 1.3 Formulate justification to proceed by analysing business requirements and benefits to the business 1.4 Analyse current building capacities or capabilities against planned deployment data to determine building environment shortfalls or additional needs 1.5 Determine minimum needs required to address identified building services shortfalls, upgrades or changes 1.6 Identify relevant standards, business and regulatory requirements that are essential for building plan compliance |
2. Scope building design requirements | 2.1 Quantify building requirements from known needs to determine if any standard deliverables can be used 2.2 Assess if requirements can be met using new or alternative solutions 2.3 Provide estimated costs and schedule to determine a planning solution 2.4 Prepare a scoping document and supporting documentation with recommendations that complies with deployment standards and regulatory requirements |
3. Produce project brief | 3.1 Prepare a project scope in required briefing format to present to the design section 3.2 Plan project delivery to meet any business timing and funding constraints 3.3 Produce building planning specifications with approvals and present to the building design section to be used for detailed design or construction specifications |
Evidence of ability to:
assess building environment requirements to provide network capability for current and forecast demand including consideration of merging technological development and product implementation
prepare and present a detailed scoping document with solutions, costing and project scheduling recommendations
meet forecast network capability needs and regulatory requirements.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
identify and discuss capability and limitations of the various network technologies to meet present and future needs
describe different costing and funding models
outline the process to review limits of a building’s facilities and services
identify network equipment requirements and use to derive building’s specifications
identify network building design
identify and apply relevant regulations and standards
discuss typical problems and challenges that describe the limitations of the various building projects work
identify ways to remain abreast of current building requirements to meet future service obligations.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the Telecommunications – Network Planning field of work and include access to:
computer aided design (CAD)
computer networks
data for network planning
network equipment deployment plans
planning models
relevant standards and regulations.