List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Element | Performance Criteria |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare for FTTx planning tasks | 1.1 Obtain relevant legislation, codes, regulations and standards for compliance when conducting work 1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements 1.3 Notify appropriate personnel of identified safety hazards at the worksite 1.4 Obtain tools and safety equipment and material to perform tasks safely and efficiently 1.5 Select and use required protective equipment and make site safe and secure for installation work 1.6 Identify and select plant and machinery for installation work activities |
2. Plan FTTx activities and develop specifications | 2.1 Follow work health and safety (WHS) and environmental requirements for given work and identify and avoid other services 2.2 Inspect proposed cable route visually according to cable plan and identify barriers to the cable installation 2.3 Modify cable plan, if required, and notify appropriate personnel 2.4 Prepare installation activities for FTTx provisioning according to project plan 2.5 Prepare installation specifications according to safe work practices and manufacturer’s instructions to include optical fibre cable size, distribution area (DA), distribution joint including lead-in multiport serving area (DLMSA), enclosures, location of optical network terminations (ONT), location and type of fibre distribution hub (FDH) and optical splitter provisioning 2.6 Verify cable length from customer access network fibre centre to end-user ONT is within 20 km operating limit 2.7 Consult with appropriate personnel to confirm project scope, installation requirements and installation specifications according to project plan |
3. Complete documentation and obtain sign-off | 3.1 Complete and present updated planning activities documentation to authorised personnel 3.2 Complete and provide updated specification documentation to vendors for supply of material and resources 3.3 Submit documentation to appropriate person for approval and sign-off |
Evidence of ability to:
determine the scope of the installation
visually inspect proposed cable route
prepare installation activities for fibre to x (FTTx) provisioning
prepare and document FTTx designs and specifications and submit for approvals
comply with all related work health and safety (WHS) requirements and work practices.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
outline properties of passive optical devices, including splitters and couplers
identify FTTx installation equipment, including tools and safety equipment
explain FTTx specifications
outline legislative privacy, safety and environmental requirements including:
WHS requirements relating to handling of optical fibre and using laser optical sources
other personal safety issues
plant and equipment safety to be used in installation plans
discussion of manufacturer’s requirements for safe operation of equipment
summarise operation of optical transmitters and receivers
identify organisational policy and procedures relevant to this work
discuss propagation of light in optical communication systems
summarise the role of optical transmitters and receivers in optical communication systems
explain the concept of wavelength division multiplexing (WDM)
discuss the importance of a knowledge of site engineering
describe typical issues and challenges in preparing an activity plan for a site
demonstrate a knowledge of the workplace and industry environment and their relationship to this work.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the Telecommunications \-– Optical Networks field of work and include access to:
vendor product information and installation guides
relevant regulatory and equipment documentation impacting installation activities.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.