Assessor Resource

ICTOPN403
Prepare activity plans and specifications for a fibre to the x installation

Assessment tool

Version 1.0
Issue Date: April 2024


This unit describes the skills and knowledge required to prepare the activity plans and specifications required by field technical staff to deploy a fibre to the x (FTTx) installation for optical access networks.

It applies to individuals who work in a supervisory capacity within a team environment. They are technically skilled and integral to the delivery of a very high speed broadband through the access network for the National Broadband Network (NBN) initiative.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for FTTx planning tasks

1.1 Obtain relevant legislation, codes, regulations and standards for compliance when conducting work

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at the worksite

1.4 Obtain tools and safety equipment and material to perform tasks safely and efficiently

1.5 Select and use required protective equipment and make site safe and secure for installation work

1.6 Identify and select plant and machinery for installation work activities

2. Plan FTTx activities and develop specifications

2.1 Follow work health and safety (WHS) and environmental requirements for given work and identify and avoid other services

2.2 Inspect proposed cable route visually according to cable plan and identify barriers to the cable installation

2.3 Modify cable plan, if required, and notify appropriate personnel

2.4 Prepare installation activities for FTTx provisioning according to project plan

2.5 Prepare installation specifications according to safe work practices and manufacturer’s instructions to include optical fibre cable size, distribution area (DA), distribution joint including lead-in multiport serving area (DLMSA), enclosures, location of optical network terminations (ONT), location and type of fibre distribution hub (FDH) and optical splitter provisioning

2.6 Verify cable length from customer access network fibre centre to end-user ONT is within 20 km operating limit

2.7 Consult with appropriate personnel to confirm project scope, installation requirements and installation specifications according to project plan

3. Complete documentation and obtain sign-off

3.1 Complete and present updated planning activities documentation to authorised personnel

3.2 Complete and provide updated specification documentation to vendors for supply of material and resources

3.3 Submit documentation to appropriate person for approval and sign-off

Evidence of ability to:

determine the scope of the installation

visually inspect proposed cable route

prepare installation activities for fibre to x (FTTx) provisioning

prepare and document FTTx designs and specifications and submit for approvals

comply with all related work health and safety (WHS) requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline properties of passive optical devices, including splitters and couplers

identify FTTx installation equipment, including tools and safety equipment

explain FTTx specifications

outline legislative privacy, safety and environmental requirements including:

WHS requirements relating to handling of optical fibre and using laser optical sources

other personal safety issues

plant and equipment safety to be used in installation plans

discussion of manufacturer’s requirements for safe operation of equipment

summarise operation of optical transmitters and receivers

identify organisational policy and procedures relevant to this work

discuss propagation of light in optical communication systems

summarise the role of optical transmitters and receivers in optical communication systems

explain the concept of wavelength division multiplexing (WDM)

discuss the importance of a knowledge of site engineering

describe typical issues and challenges in preparing an activity plan for a site

demonstrate a knowledge of the workplace and industry environment and their relationship to this work.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the Telecommunications \-– Optical Networks field of work and include access to:

vendor product information and installation guides

relevant regulatory and equipment documentation impacting installation activities.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Element

Performance Criteria

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for FTTx planning tasks

1.1 Obtain relevant legislation, codes, regulations and standards for compliance when conducting work

1.2 Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements

1.3 Notify appropriate personnel of identified safety hazards at the worksite

1.4 Obtain tools and safety equipment and material to perform tasks safely and efficiently

1.5 Select and use required protective equipment and make site safe and secure for installation work

1.6 Identify and select plant and machinery for installation work activities

2. Plan FTTx activities and develop specifications

2.1 Follow work health and safety (WHS) and environmental requirements for given work and identify and avoid other services

2.2 Inspect proposed cable route visually according to cable plan and identify barriers to the cable installation

2.3 Modify cable plan, if required, and notify appropriate personnel

2.4 Prepare installation activities for FTTx provisioning according to project plan

2.5 Prepare installation specifications according to safe work practices and manufacturer’s instructions to include optical fibre cable size, distribution area (DA), distribution joint including lead-in multiport serving area (DLMSA), enclosures, location of optical network terminations (ONT), location and type of fibre distribution hub (FDH) and optical splitter provisioning

2.6 Verify cable length from customer access network fibre centre to end-user ONT is within 20 km operating limit

2.7 Consult with appropriate personnel to confirm project scope, installation requirements and installation specifications according to project plan

3. Complete documentation and obtain sign-off

3.1 Complete and present updated planning activities documentation to authorised personnel

3.2 Complete and provide updated specification documentation to vendors for supply of material and resources

3.3 Submit documentation to appropriate person for approval and sign-off

Evidence of ability to:

determine the scope of the installation

visually inspect proposed cable route

prepare installation activities for fibre to x (FTTx) provisioning

prepare and document FTTx designs and specifications and submit for approvals

comply with all related work health and safety (WHS) requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline properties of passive optical devices, including splitters and couplers

identify FTTx installation equipment, including tools and safety equipment

explain FTTx specifications

outline legislative privacy, safety and environmental requirements including:

WHS requirements relating to handling of optical fibre and using laser optical sources

other personal safety issues

plant and equipment safety to be used in installation plans

discussion of manufacturer’s requirements for safe operation of equipment

summarise operation of optical transmitters and receivers

identify organisational policy and procedures relevant to this work

discuss propagation of light in optical communication systems

summarise the role of optical transmitters and receivers in optical communication systems

explain the concept of wavelength division multiplexing (WDM)

discuss the importance of a knowledge of site engineering

describe typical issues and challenges in preparing an activity plan for a site

demonstrate a knowledge of the workplace and industry environment and their relationship to this work.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the Telecommunications \-– Optical Networks field of work and include access to:

vendor product information and installation guides

relevant regulatory and equipment documentation impacting installation activities.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain relevant legislation, codes, regulations and standards for compliance when conducting work 
Scope work by obtaining project plan from appropriate personnel and arrange for site access to comply with security arrangements 
Notify appropriate personnel of identified safety hazards at the worksite 
Obtain tools and safety equipment and material to perform tasks safely and efficiently 
Select and use required protective equipment and make site safe and secure for installation work 
Identify and select plant and machinery for installation work activities 
Follow work health and safety (WHS) and environmental requirements for given work and identify and avoid other services 
Inspect proposed cable route visually according to cable plan and identify barriers to the cable installation 
Modify cable plan, if required, and notify appropriate personnel 
Prepare installation activities for FTTx provisioning according to project plan 
Prepare installation specifications according to safe work practices and manufacturer’s instructions to include optical fibre cable size, distribution area (DA), distribution joint including lead-in multiport serving area (DLMSA), enclosures, location of optical network terminations (ONT), location and type of fibre distribution hub (FDH) and optical splitter provisioning 
Verify cable length from customer access network fibre centre to end-user ONT is within 20 km operating limit 
Consult with appropriate personnel to confirm project scope, installation requirements and installation specifications according to project plan 
Complete and present updated planning activities documentation to authorised personnel 
Complete and provide updated specification documentation to vendors for supply of material and resources 
Submit documentation to appropriate person for approval and sign-off 

Forms

Assessment Cover Sheet

ICTOPN403 - Prepare activity plans and specifications for a fibre to the x installation
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTOPN403 - Prepare activity plans and specifications for a fibre to the x installation

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: