List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Elements | Performance Criteria |
Elements describe the essential outcomes | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Scope network infrastructure requirements | 1.1 Determine requirements of project from client and approved network plan 1.2 Assess current access network conditions to determine existing network capacity and capability 1.3 Analyse site survey data and geographical information where necessary to assess suitability of site to design requirements 1.4 Assess risk of barriers to plan realisation to ensure delivery of network infrastructure project is achievable 1.5 Analyse impact on planning of relevant legislation and associated operational codes 1.6 Produce scoping document with consideration to new technology or technology features required in project |
2. Develop project brief | 2.1 Develop planning options considering current and new technology, facilities, features, and present and future needs 2.2 Conduct cost-benefit studies to guide decision making processes according to sound business practice 2.3 Discuss project brief with client, as required, and obtain approval of planning options 2.4 Produce planning specifications relating to location, route, area, product and/or platform 2.5 Estimate timing, costing and operating budget according to enterprise policy 2.6 Prepare final project brief and present to operational staff for implementation |
3. Manage project | 3.1 Define roles and responsibilities of stakeholders within terms of project 3.2 Establish reporting and communications line to ensure project is effectively managed 3.3 Review and continually monitor progress of project against deliverables and timelines, and invoke contingencies if required 3.4 Complete project documents in line with enterprise standards and guidelines |
Evidence of the ability to:
determine scope of network infrastructure requirements
accurately analyse and document considerations in project specifications and the impact of legislative and environmental conditions on the project plan
prepare a project brief outlining specifications, timeframes, costing and operating budget
manage the delivery of network infrastructure to completion.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
outline Australian Communications and Media Authority (ACMA) licensing requirements
explain common client telecommunications applications and related equipment
identify correct computer operation
describe the workplace and industry environment
outline industry cabling practices
explain leasing versus purchase options
identify legislative and environmental impacts, including options for green information and communications technology (ICT) installations
outline network and transmission equipment, network topologies, interfaces and interconnect solutions
describe work health and safety (WHS) procedures
identify performance parameters and typical faults in equipment and related connection and transmission media, and various test equipment types
explain the process of project management
identify telecommunications components and assemblies
identify warranty information and contractor work guarantees.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – project management field of work and include access to:
sites on which projects may be conducted
relevant databases, legislative requirements and other project related documentation.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.