This unit describes the skills and knowledge required to develop specifications for a telecommunications project, including switching, transmission and radio networks, and the various transmission paths including cable, optical fibre, radio, microwave and satellite.

It applies to individuals who have a high level of specialist technical skills and knowledge in telecommunications and IT networks using internet protocol (IP) systems and who may supervise others.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for project estimate

1.1 Analyse project design obtained from appropriate personnel to determine project requirements according to project plan

1.2 Verify project requirements with clients and project team

1.3 Ascertain impact of time restraints on estimate

1.4 Analyse impact of relevant legislation, codes, regulations and standards on planning processes

1.5 Establish availability of all appropriate data and documentation to allow for completion of work

2. Estimate resource requirements

2.1 Conduct site inspection to verify design details and project context

2.2 Produce estimate of type, quantity and schedule of resources required for project from project plans

2.3 Prioritise sequence of work appropriate to enterprise needs

2.4 Calculate contractor and employee labour hours required according to project requirements, industrial awards and enterprise policies

2.5 Record estimates of materials, equipment and labour hours according to enterprise guidelines

3. Calculate costing details

3.1 Estimate amount and type of resources required for successful completion of project, including risk management and contingencies

3.2 Calculate costs for resources from current information, following standard costing procedures

3.3 Produce detailed record of all required resources and costing details for project specifications

4. Prepare detailed project plan

4.1 Prepare detailed plan, including specifications for materials, equipment, resources, locations and network routes

4.2 Forward plan and specifications to appropriate personnel for project implementation

Evidence of the ability to:

analyse project design to determine specification options

prepare estimates and calculate the cost of resources for a telecommunications project

prepare detailed project plan, including specifications for resources and network routes.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain common client telecommunications applications and related equipment

describe cost effective solutions employed in planning

describe and apply drafting techniques

explain the workplace and industry environment

describe the impact of legislative and environmental impacts, including options for green information and communications technology (ICT) installations

identify and evaluate the benefits of different network and transmission equipment

identify and evaluate the benefits of different network topologies and interface and interconnect solutions

identify the possible implications for a planned design on health and safety

identify and describe various warranty information and contractor work guarantees.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – project management field of work and include access to:

sites on which projects may be conducted

relevant databases, legislative requirements and other site and project related documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for project estimate

1.1 Analyse project design obtained from appropriate personnel to determine project requirements according to project plan

1.2 Verify project requirements with clients and project team

1.3 Ascertain impact of time restraints on estimate

1.4 Analyse impact of relevant legislation, codes, regulations and standards on planning processes

1.5 Establish availability of all appropriate data and documentation to allow for completion of work

2. Estimate resource requirements

2.1 Conduct site inspection to verify design details and project context

2.2 Produce estimate of type, quantity and schedule of resources required for project from project plans

2.3 Prioritise sequence of work appropriate to enterprise needs

2.4 Calculate contractor and employee labour hours required according to project requirements, industrial awards and enterprise policies

2.5 Record estimates of materials, equipment and labour hours according to enterprise guidelines

3. Calculate costing details

3.1 Estimate amount and type of resources required for successful completion of project, including risk management and contingencies

3.2 Calculate costs for resources from current information, following standard costing procedures

3.3 Produce detailed record of all required resources and costing details for project specifications

4. Prepare detailed project plan

4.1 Prepare detailed plan, including specifications for materials, equipment, resources, locations and network routes

4.2 Forward plan and specifications to appropriate personnel for project implementation

Evidence of the ability to:

analyse project design to determine specification options

prepare estimates and calculate the cost of resources for a telecommunications project

prepare detailed project plan, including specifications for resources and network routes.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

explain common client telecommunications applications and related equipment

describe cost effective solutions employed in planning

describe and apply drafting techniques

explain the workplace and industry environment

describe the impact of legislative and environmental impacts, including options for green information and communications technology (ICT) installations

identify and evaluate the benefits of different network and transmission equipment

identify and evaluate the benefits of different network topologies and interface and interconnect solutions

identify the possible implications for a planned design on health and safety

identify and describe various warranty information and contractor work guarantees.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – project management field of work and include access to:

sites on which projects may be conducted

relevant databases, legislative requirements and other site and project related documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Analyse project design obtained from appropriate personnel to determine project requirements according to project plan 
Verify project requirements with clients and project team 
Ascertain impact of time restraints on estimate 
Analyse impact of relevant legislation, codes, regulations and standards on planning processes 
Establish availability of all appropriate data and documentation to allow for completion of work 
Conduct site inspection to verify design details and project context 
Produce estimate of type, quantity and schedule of resources required for project from project plans 
Prioritise sequence of work appropriate to enterprise needs 
Calculate contractor and employee labour hours required according to project requirements, industrial awards and enterprise policies 
Record estimates of materials, equipment and labour hours according to enterprise guidelines 
Estimate amount and type of resources required for successful completion of project, including risk management and contingencies 
Calculate costs for resources from current information, following standard costing procedures 
Produce detailed record of all required resources and costing details for project specifications 
Prepare detailed plan, including specifications for materials, equipment, resources, locations and network routes 
Forward plan and specifications to appropriate personnel for project implementation 

Forms

Assessment Cover Sheet

ICTPMG504 - Prepare project specifications
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTPMG504 - Prepare project specifications

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: