List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Monitor the implementation of the pilot system | 1.1 Review the pilot and the support documentation 1.2 Identify the pilot and system procedures 1.3 Supervise system functionality and integrity tests 1.4 Document the findings 1.5 Provide technical support, as required |
2. Evaluate the pilot system | 2.1 Review pilot operation against pilot objectives, and success criteria 2.2 Review client and executive feedback on the pilot, against the acceptance criteria 2.3 Identify and areas of success, and those needing improvement 2.4 Prioritise, implement and assess, the impact of required improvements 2.5 Document the review process and submit to the appropriate person |
Evidence of the ability to:
review documentation to identify pilot objectives, client requirements and relevant procedures
observe and support testing and document findings
evaluate the pilot's success using acceptance criteria and stakeholder feedback
document the evaluation process, including successes, improvements and impact of changes.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
describe the current industry-accepted system of piloting methodologies including their general features and capabilities, with particular emphasis on acceptance criteria
describe current industry system development and design methodologies
explain three or more current industry information-gathering methodologies
outline the role of stakeholders and the degree of stakeholder involvement
describe the system's current functionality, with a specific emphasis on:
system integration
system response and recovery times
user interfaces
the validation of inputs and outputs.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the programming and software development industry, and include access to the:
pilot plan
acceptance criteria
system to be piloted.
Assessors must satisfy NVR/AQTF assessor requirements.