This unit describes the skills and knowledge required to install and test power saving components in servers, motherboards and other networking equipment.

It applies to individuals in the information and communications technology (ICT) industry who operate with a degree of autonomy, but who may also supervise the work of others when necessary.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan to install and test power saving hardware

1.1 Arrange access to site according to required procedure

1.2 Assess extent of system implementation using feasibility report and organisational guidelines

1.3 Produce report to meet client and organisational requirements

1.4 Liaise with appropriate person to obtain approval for plans with recommendations

1.5 Determine and source power saving hardware components according to agreed plan

2. Install, test and evaluate power saving hardware

2.1 Install and configure components according to work health and safety (WHS) and environmental requirements, plan, and manufacturer’s and industry standards

2.2 Resolve identified problems

2.3 Test and enhance system performance to meet organisational requirements

3. Complete documentation and clean up worksite

3.1 Produce evaluation report on actual cost and benefits of implementing power saving hardware in organisation

3.2 Provide support manual for client

3.3 Record all test results and records for client

3.4 Restore any changes made to worksite to client’s satisfaction and obtain sign off

Evidence of the ability to:

determine and meet client requirements for installation and testing of power saving hardware

plan and connect the hardware components according to vendor and technical specifications.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe systems diagnostic features

outline business processes

summarise client business domain, business function and organisation

discuss compatibility issues and resolution procedures

describe the process of configuration of internet protocol (IP) networks

identify current industry accepted hardware products

describe the major components of client and business liaison

explain how to document technical specifications

discuss linkage between processes

identify set up and configuration procedures

outline technologies such as:

areas of the hardware relevant to configuration and testing

installation procedures

power saving hardware functionality

explain vendor specifications and requirements for component installation.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – sustainability field of work and include access to:

a site on which energy saving solutions can be implemented

power saving hardware currently used in industry

relevant documentation, feasibility studies, equipment manuals and other site-related documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

Elements

Performance Criteria

Elements describe the essential outcomes

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Plan to install and test power saving hardware

1.1 Arrange access to site according to required procedure

1.2 Assess extent of system implementation using feasibility report and organisational guidelines

1.3 Produce report to meet client and organisational requirements

1.4 Liaise with appropriate person to obtain approval for plans with recommendations

1.5 Determine and source power saving hardware components according to agreed plan

2. Install, test and evaluate power saving hardware

2.1 Install and configure components according to work health and safety (WHS) and environmental requirements, plan, and manufacturer’s and industry standards

2.2 Resolve identified problems

2.3 Test and enhance system performance to meet organisational requirements

3. Complete documentation and clean up worksite

3.1 Produce evaluation report on actual cost and benefits of implementing power saving hardware in organisation

3.2 Provide support manual for client

3.3 Record all test results and records for client

3.4 Restore any changes made to worksite to client’s satisfaction and obtain sign off

Evidence of the ability to:

determine and meet client requirements for installation and testing of power saving hardware

plan and connect the hardware components according to vendor and technical specifications.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

describe systems diagnostic features

outline business processes

summarise client business domain, business function and organisation

discuss compatibility issues and resolution procedures

describe the process of configuration of internet protocol (IP) networks

identify current industry accepted hardware products

describe the major components of client and business liaison

explain how to document technical specifications

discuss linkage between processes

identify set up and configuration procedures

outline technologies such as:

areas of the hardware relevant to configuration and testing

installation procedures

power saving hardware functionality

explain vendor specifications and requirements for component installation.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications – sustainability field of work and include access to:

a site on which energy saving solutions can be implemented

power saving hardware currently used in industry

relevant documentation, feasibility studies, equipment manuals and other site-related documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Arrange access to site according to required procedure 
Assess extent of system implementation using feasibility report and organisational guidelines 
Produce report to meet client and organisational requirements 
Liaise with appropriate person to obtain approval for plans with recommendations 
Determine and source power saving hardware components according to agreed plan 
Install and configure components according to work health and safety (WHS) and environmental requirements, plan, and manufacturer’s and industry standards 
Resolve identified problems 
Test and enhance system performance to meet organisational requirements 
Produce evaluation report on actual cost and benefits of implementing power saving hardware in organisation 
Provide support manual for client 
Record all test results and records for client 
Restore any changes made to worksite to client’s satisfaction and obtain sign off 

Forms

Assessment Cover Sheet

ICTSUS402 - Install and test power saving hardware
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTSUS402 - Install and test power saving hardware

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: