List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Elements | Performance Criteria |
Elements describe the essential outcomes | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare materials and secure site | 1.1 Notify appropriate personnel and take necessary precautions to minimise, control or eliminate hazards that may exist during work activities 1.2 Determine nature and location of structure from construction design plans, relevant legislation, codes, regulations and standards 1.3 Determine materials, tools and equipment required from construction design plans 1.4 Check steel for assembly against construction design plans to ensure no parts are missing 1.5 Secure and clean site according to site security instructions for public safety |
2. Construct foundations for radio structure | 2.1 Locate other services according to industry practice, and arrange for relocation of services if required 2.2 Oversee excavation of foundation according to engineering specifications, and construction of foundations according to construction design plans 2.3 Install earthing according to construction design plans, enterprise work health and safety (WHS) guidelines and industry practice 2.4 Provide samples of concrete for analysis according to enterprise guidelines and manufacturer’s specifications, relevant standards and regulations |
3. Assemble and mount telecommunications radio structure | 3.1 Select area free of interference and close to construction site suitable for structure assembly 3.2 Assemble radio structure in sections on ground according to engineering specifications, using personal protective equipment and following safety guidelines 3.3 Mount and secure preassembled sections to tower construction according to plans, specifications and enterprise WHS guidelines 3.4 Maintain vertical positioning of structure within twist tolerances during construction phase 3.5 Secure and tension guy wires according to construction design plans, enterprise WHS guidelines and industry practice |
4. Complete administrative duties | 4.1 Update original design plan with approved amendments and return to design section 4.2 Secure and clean up site to original condition in environmentally safe manner 4.3 Notify client and obtain sign off |
Evidence of the ability to:
undertake pre-construction checks to ensure a safe working environment
construct foundations according to engineering specifications
select site for hoisting equipment, ensuring location is safe for the operator and the construction
preassemble the structure at ground level, ensuring completion of each assembled component
assemble and mount a telecommunications radio structure, including temporary and permanent guy anchors
install functional and protective earthing systems, following security and safety procedures.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
summarise the impact that weather conditions impose on the constructions and installation of telecommunications structures
describe the safety risks associated with the installation of telecommunications equipment in remote areas including:
hypothermia symptoms and methods of prevention and treatment
electromagnetic radiation (EMR) safety practices
personal protective equipment for rigging projects
working-at-heights safety practices
discuss the features and operating requirements of:
construction equipment
rigging equipment
identify the information required to build a telecommunications radio structure
describe rigging practices and systems for telecommunications radio structures
list legislation, codes of practice and other formal agreements that impact on the work activity
summarise licensing and regulatory issues applying to rigging practices and systems on telecommunications radio structures
describe manufacturer’s requirements for safe operation of equipment
discuss the following work health and safety (WHS) requirements:
WHS legislation and regulations
company procedures relating to the activity and site conditions
discuss typical issues and challenges that can occur on an installation site.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications ‒ telecommunications rigging installation field of work and include access to special purpose tools, equipment and materials.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.