List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
Elements | Performance Criteria |
Elements describe the essential outcomes | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Prepare for installation of radio plant | 1.1 Prepare for given work according to relevant legislation, codes, regulations and standards 1.2 Arrange access to site and discuss client requirements 1.3 Inform appropriate personnel of existing and potential site hazards 1.4 Select tools and safety equipment required for safe rigging practice 1.5 Develop installation plans in agreement with client or site supervisor 1.6 Procure materials and verify delivery against inventory according to industry practice |
2. Install plant and equipment | 2.1 Set up rigging equipment for safe and effective use according to specifications 2.2 Install telecommunications radio equipment and feeders according to specifications and industry practice following work health and safety (WHS) and environmental requirements 2.3 Maintain installation progress documentation according to company and client requirements |
3. Assist with testing and fault finding | 3.1 Assist with testing of telecommunications radio equipment mounted on telecommunications structures 3.2 Identify and locate faults by interpreting test results and rectify according to industry practice 3.3 Document test results according to specifications and client requirements |
4. Clean up site and complete documentation | 4.1 De-rig and lower rigging equipment according to specifications 4.2 Restore site to client expectations following completion of installation, according to industry practice 4.3 Complete documentation and notify client for sign off |
Evidence of the ability to:
install basic telecommunications radio plant and equipment according to job specifications and all work health and safety (WHS) legislation, regulations, standards and environmental requirements
assist with testing and fault-finding basic telecommunications radio plant and equipment mounted on telecommunications structures
use effective communications skills related to:
dogging
work associates
supervisors
team members
enterprise documentation.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
outline antenna principles
outline the features and operating requirements of rigging equipment
discuss relevant regulations and typical issues and challenges that may occur on site
explain rigging practices and systems in relation to telecommunications radio structures, and related licensing and regulatory issues
discuss the main principles of:
electromagnetic radiation (EMR) safety practices
optical fibre cabling and equipment safety practices
working-at-heights safety practices
summarise specific WHS requirements relating to the activity and site conditions, including:
basic survival skills
company WHS procedures
hypothermia
remote area first aid.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances must be typical of those experienced in the telecommunications ‒ telecommunications rigging installation field of work and include access to special purpose tools, equipment and materials.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.