List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.
ELEMENT | PERFORMANCE CRITERIA |
Elements describe the essential outcomes. | Performance criteria describe the performance needed to demonstrate achievement of the element. |
1. Obtain access to work site | 1.1 Notify appropriate personnel, if necessary, to arrange site access, discuss installation requirements and identify carrier network systems 1.2 Assess site-specific safety requirements and enterprise work health and safety (WHS) processes and procedures 1.3 Use network information systems to obtain planning data |
2. Identify existing infrastructure | 2.1 Confirm details of installation with stakeholders 2.2 Verify site conditions and building construction 2.3 Locate and record existing facilities and systems 2.4 Confirm installation locations and identify barriers to planned network extension 2.5 Integrate existing network and floor plans into documentation where available |
3. Integrate existing infrastructure into design brief | 3.1 Review existing plans, drawings and databases against the design brief 3.2 Calculate capacity of existing facilities against proposed usage to ensure appropriate design decisions for new installation 3.3 Incorporate all data into new installation design 3.4 Mark up plans and prepare report on new installation design 3.5 Develop contingency plans for anticipated constraints |
4. Review design for compliance with standards and legislation | 4.1 Examine standards, practices and requirements for locating telecommunications infrastructure in the access network 4.2 Review installation design to ensure compliance with requirements of federal, state and local regulations, relevant legislation, codes and standards 4.3 Initiate any special studies or investigations necessary for completion of the project |
5. Complete required reports and documentation | 5.1 Complete required documents promptly and according to planning parameters 5.2 Obtain carrier confirmation from documented requirements 5.3 Distribute design documentation to stakeholders promptly 5.4 Obtain project plan sign-off from carrier |
Evidence of ability to:
evaluate existing infrastructure on an installation site
integrate existing infrastructure into an installation design
develop design specifications for an installation project
engage stakeholders and carriers in design approval process.
Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.
To complete the unit requirements safely and effectively, the individual must:
identify and explain the impact of relevant legislation, codes of practice and other formal agreements that impact communications work
describe access networks in Australia and state how it influences development of projects
identify costs associated with carrier installations and determine estimates and operating budgets for an installation
identify network performance information required to produce a network design
specify current, new and emerging technologies to be considered for a communications design, including barriers that may have an impact
define project management and its purpose and explain associated databases and project management software programs used
explain economic and political influences and trends that impact communications installations for public and commercial enterprises
describe a network plan and its components
explain the purpose of having authorities and delegations required when costing and estimating financials for projects
explain the impact of local and international economic conditions on telecommunications installations and infrastructure, and typical challenges and limits facing technology today and on future needs
describe the process and documentation required to collate and write project briefs, reports and project charters
identify specific work health and safety requirements relating to site conditions and activities, including manufacturer's requirements for safe operation of equipment to be incorporated into project documentation.
Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the telecommunications networks engineering field of work and include access to:
a network planning area, systems and deployment rules and standards
relevant databases, licensing requirements and other site related procedures
a location and scenario suitable to conduct a site survey.
Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.