Acceptance test new systems and equipment

Assessment tool

Version 1.0
Issue Date: April 2024


This unit describes the skills and knowledge required to ensure new system readiness by inspecting and testing equipment to confirm compliance and performance.

It applies to individuals working as field officers, technicians or technical supervisors for carriers, contractors or other service providers.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to conduct acceptance testing

1.1 Obtain installation and commissioning documents and planning specifications from appropriate personnel to ensure the installed system is as planned and specified

1.2 Visually inspect new installation and verify compliance of the system against relevant legislation, codes, regulations and standards

1.3 Select and obtain required test equipment for suitability of acceptance testing

1.4 Prepare acceptance schedule and test criteria in consultation with appropriate personnel

2. Conduct acceptance testing

2.1 Undertake and analyse performance tests safely to ensure measurements meet with predetermined specifications and approved operating margins

2.2 Verify performance levels to within tolerance specifications

2.3 Test protection mechanisms to ensure performance criteria meets the specified standard

2.4 Test alarms for satisfactory operation

2.5 Refer identified problems to appropriate personnel for remedial action

2.6 Record all acceptance test procedures and results

3. Complete administrative tasks

3.1 Complete acceptance documentation including recommendations

3.2 Notify appropriate personnel and obtain sign-off

Evidence of ability to:

inspect new installation and verify compliance against installation plans

prepare acceptance schedule and test criteria

undertake relevant acceptance tests and analysis

comply with specified performance criteria, related work health and safety (WHS) requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline cabling, terminations and supporting structures that may be encountered in the system under inspection

explain common performance levels and standards

explain electrical and or optical properties to be measured

consider WHS issues that impact testing systems and equipment

evaluate typical network topologies, switching, routing and transmission techniques

evaluate transmission type and signals that may be encountered

explore various types of test equipment suitable for testing to be performed.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the telecommunications networks engineering field of work and include access to:

sites where acceptance tests may be conducted

testing equipment currently used in industry

relevant regulatory and equipment documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare to conduct acceptance testing

1.1 Obtain installation and commissioning documents and planning specifications from appropriate personnel to ensure the installed system is as planned and specified

1.2 Visually inspect new installation and verify compliance of the system against relevant legislation, codes, regulations and standards

1.3 Select and obtain required test equipment for suitability of acceptance testing

1.4 Prepare acceptance schedule and test criteria in consultation with appropriate personnel

2. Conduct acceptance testing

2.1 Undertake and analyse performance tests safely to ensure measurements meet with predetermined specifications and approved operating margins

2.2 Verify performance levels to within tolerance specifications

2.3 Test protection mechanisms to ensure performance criteria meets the specified standard

2.4 Test alarms for satisfactory operation

2.5 Refer identified problems to appropriate personnel for remedial action

2.6 Record all acceptance test procedures and results

3. Complete administrative tasks

3.1 Complete acceptance documentation including recommendations

3.2 Notify appropriate personnel and obtain sign-off

Evidence of ability to:

inspect new installation and verify compliance against installation plans

prepare acceptance schedule and test criteria

undertake relevant acceptance tests and analysis

comply with specified performance criteria, related work health and safety (WHS) requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline cabling, terminations and supporting structures that may be encountered in the system under inspection

explain common performance levels and standards

explain electrical and or optical properties to be measured

consider WHS issues that impact testing systems and equipment

evaluate typical network topologies, switching, routing and transmission techniques

evaluate transmission type and signals that may be encountered

explore various types of test equipment suitable for testing to be performed.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the telecommunications networks engineering field of work and include access to:

sites where acceptance tests may be conducted

testing equipment currently used in industry

relevant regulatory and equipment documentation.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Obtain installation and commissioning documents and planning specifications from appropriate personnel to ensure the installed system is as planned and specified 
Visually inspect new installation and verify compliance of the system against relevant legislation, codes, regulations and standards 
Select and obtain required test equipment for suitability of acceptance testing 
Prepare acceptance schedule and test criteria in consultation with appropriate personnel 
Undertake and analyse performance tests safely to ensure measurements meet with predetermined specifications and approved operating margins 
Verify performance levels to within tolerance specifications 
Test protection mechanisms to ensure performance criteria meets the specified standard 
Test alarms for satisfactory operation 
Refer identified problems to appropriate personnel for remedial action 
Record all acceptance test procedures and results 
Complete acceptance documentation including recommendations 
Notify appropriate personnel and obtain sign-off 

Forms

Assessment Cover Sheet

ICTTEN504 - Acceptance test new systems and equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTTEN504 - Acceptance test new systems and equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: