Assessor Resource

ICTTEN505
Commission telecommunications network equipment

Assessment tool

Version 1.0
Issue Date: May 2024


This unit describes the skills and knowledge required to check plans, obtain and properly handle equipment and supplies, undertake tests, and complete administrative tasks.

It applies to individuals working as field officers, technicians or technical supervisors for carriers, contractors or other service providers

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for commissioning procedures

1.1 Prepare for work following work health and safety (WHS) requirements

1.2 Organise resources based on existing and potential site hazards

1.3 Contact network operations personnel for site access and network specifications

1.4 Determine the type and complexity of the network equipment from specifications

1.5 Establish commissioning dates and confirm with all parties

1.6 Determine commissioning parameters according to specification, and establish planned outage if required

1.7 Obtain test equipment and check for suitability and accuracy

1.8 Produce a preliminary commissioning plan according to manufacturer’s instructions and company guidelines for discussion with the customer

1.9 Inform affected customers of impending action and likely timing and impact by the work

2. Organise planned outages if necessary

2.1 Negotiate outage times with appropriate groups and affected customers to minimise any disruptions

2.2 Develop contingency plans if required and arrange for emergency communications

2.3 Notify alarm management centre of action planned

2.4 Obtain authority to proceed from relevant control centre and notify customers affected by the outage

3. Complete installation procedures of network equipment

3.1 Install applications programmes and management data according to specification to complete installation procedures

3.2 Complete all hardware connections according to commissioning instructions

3.3 Undertake all specified performance tests to ensure operation meets all prescribed parameters and specifications as detailed in the original design brief

3.4 Undertake tests to verify compatibility between the hardware and software

3.5 Correct performance defects or bring to the attention of designers for corrective action

4. Complete commissioning procedures with network management

4.1 Test alarms in conjunction with network management and operational groups to maintain network integrity

4.2 Simulate traffic tests through the new installation to emulate a live network

4.3 Test installed specific equipment features and operations administration maintenance system according to instructions

4.4 Diagnose, repair or escalate faults detected to the appropriate area when fault cannot be clearly diagnosed or repaired

4.5 Initiate vendor-related tests where required

5. Finalise commissioning tasks

5.1 Complete administrative tasks as required by enterprise

5.2 Undertake operational staff training where required

5.3 Restore site to customer’s satisfaction

5.4 Notify customer and obtain sign-off

Evidence of ability to:

interact with enterprise personnel, customers and other contractors, keeping a customer focus and consideration of customer needs

produce an outage management plan and contingency plan

negotiate network activity and timing of commissioning

commission networking equipment to plan or specification

implement test plan, and interpret and analyse results against expected outcomes

test alarms and alarm regime

analyse faults, problems and anomalies and provide solutions

comply with all related work health and safety (WHS) requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline electrical and/or optical properties to be measured

evaluate a range of networking equipment and their operation

consider legislation and licensing that govern installation of telecommunications equipment

define spectrum allocation

outline network operation procedures

summarise power requirements and electrical safety

describe transmission types and signals that may be encountered in telecommunications networks

summarise the various tests and test equipment required for commissioning.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the telecommunications networks engineering field of work and include access to:

sites on which installation and commissioning procedures can be conducted

relevant regulatory and equipment documentation impacting commissioning

testing equipment currently used in industry.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Prepare for commissioning procedures

1.1 Prepare for work following work health and safety (WHS) requirements

1.2 Organise resources based on existing and potential site hazards

1.3 Contact network operations personnel for site access and network specifications

1.4 Determine the type and complexity of the network equipment from specifications

1.5 Establish commissioning dates and confirm with all parties

1.6 Determine commissioning parameters according to specification, and establish planned outage if required

1.7 Obtain test equipment and check for suitability and accuracy

1.8 Produce a preliminary commissioning plan according to manufacturer’s instructions and company guidelines for discussion with the customer

1.9 Inform affected customers of impending action and likely timing and impact by the work

2. Organise planned outages if necessary

2.1 Negotiate outage times with appropriate groups and affected customers to minimise any disruptions

2.2 Develop contingency plans if required and arrange for emergency communications

2.3 Notify alarm management centre of action planned

2.4 Obtain authority to proceed from relevant control centre and notify customers affected by the outage

3. Complete installation procedures of network equipment

3.1 Install applications programmes and management data according to specification to complete installation procedures

3.2 Complete all hardware connections according to commissioning instructions

3.3 Undertake all specified performance tests to ensure operation meets all prescribed parameters and specifications as detailed in the original design brief

3.4 Undertake tests to verify compatibility between the hardware and software

3.5 Correct performance defects or bring to the attention of designers for corrective action

4. Complete commissioning procedures with network management

4.1 Test alarms in conjunction with network management and operational groups to maintain network integrity

4.2 Simulate traffic tests through the new installation to emulate a live network

4.3 Test installed specific equipment features and operations administration maintenance system according to instructions

4.4 Diagnose, repair or escalate faults detected to the appropriate area when fault cannot be clearly diagnosed or repaired

4.5 Initiate vendor-related tests where required

5. Finalise commissioning tasks

5.1 Complete administrative tasks as required by enterprise

5.2 Undertake operational staff training where required

5.3 Restore site to customer’s satisfaction

5.4 Notify customer and obtain sign-off

Evidence of ability to:

interact with enterprise personnel, customers and other contractors, keeping a customer focus and consideration of customer needs

produce an outage management plan and contingency plan

negotiate network activity and timing of commissioning

commission networking equipment to plan or specification

implement test plan, and interpret and analyse results against expected outcomes

test alarms and alarm regime

analyse faults, problems and anomalies and provide solutions

comply with all related work health and safety (WHS) requirements and work practices.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

outline electrical and/or optical properties to be measured

evaluate a range of networking equipment and their operation

consider legislation and licensing that govern installation of telecommunications equipment

define spectrum allocation

outline network operation procedures

summarise power requirements and electrical safety

describe transmission types and signals that may be encountered in telecommunications networks

summarise the various tests and test equipment required for commissioning.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the telecommunications networks engineering field of work and include access to:

sites on which installation and commissioning procedures can be conducted

relevant regulatory and equipment documentation impacting commissioning

testing equipment currently used in industry.

Assessors of this unit must satisfy the requirements for assessors in applicable vocational education and training legislation, frameworks and/or standards.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Prepare for work following work health and safety (WHS) requirements 
Organise resources based on existing and potential site hazards 
Contact network operations personnel for site access and network specifications 
Determine the type and complexity of the network equipment from specifications 
Establish commissioning dates and confirm with all parties 
Determine commissioning parameters according to specification, and establish planned outage if required 
Obtain test equipment and check for suitability and accuracy 
Produce a preliminary commissioning plan according to manufacturer’s instructions and company guidelines for discussion with the customer 
Inform affected customers of impending action and likely timing and impact by the work 
Negotiate outage times with appropriate groups and affected customers to minimise any disruptions 
Develop contingency plans if required and arrange for emergency communications 
Notify alarm management centre of action planned 
Obtain authority to proceed from relevant control centre and notify customers affected by the outage 
Install applications programmes and management data according to specification to complete installation procedures 
Complete all hardware connections according to commissioning instructions 
Undertake all specified performance tests to ensure operation meets all prescribed parameters and specifications as detailed in the original design brief 
Undertake tests to verify compatibility between the hardware and software 
Correct performance defects or bring to the attention of designers for corrective action 
Test alarms in conjunction with network management and operational groups to maintain network integrity 
Simulate traffic tests through the new installation to emulate a live network 
Test installed specific equipment features and operations administration maintenance system according to instructions 
Diagnose, repair or escalate faults detected to the appropriate area when fault cannot be clearly diagnosed or repaired 
Initiate vendor-related tests where required 
Complete administrative tasks as required by enterprise 
Undertake operational staff training where required 
Restore site to customer’s satisfaction 
Notify customer and obtain sign-off 

Forms

Assessment Cover Sheet

ICTTEN505 - Commission telecommunications network equipment
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTTEN505 - Commission telecommunications network equipment

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: