Assessor Resource

ICTTEN805
Manage solution architecture and impacts in line with organisational processes

Assessment tool

Version 1.0
Issue Date: May 2024


This unit describes the skills and knowledge required to analyse business options to plan, develop and manage solution architecture systems integration across multiple architectures for a telecommunications service provider.

It applies to individuals with excellent technical, communication and planning skills working in project management roles with authority to direct installation activities.

No licensing, legislative or certification requirements apply to this unit at the time of publication.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)



Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop plan to support architectural design process

1.1 Prepare a plan with techniques to support the architectural design process and communicate the solution to different stakeholder groups

1.2 Critically analyse business options to support architectural design trade-offs for optimal design solution

1.3 Evaluate strengths and weaknesses of relevant technologies in context of the requirement

1.4 Assess a range of interdisciplinary concept ideas and effect their attributes would have on the design requirements

1.5 Prepare a solutions architecture plan detailing all possible solutions

2. Develop interface requirements for effective solutions across multiple architectures

2.1 Evaluate system element interfaces and sources of complexity for interface management of the system across multiple architectures

2.2 Develop a process and appropriate techniques to be adopted for interface management of system elements for solution architecture

2.3 Produce a control process of system element interfaces of the management system

2.4 Liaise and arbitrate between stakeholders where there are conflicts in definition of interfaces

3. Manage solution architecture systems integration

3.1 Evaluate suitability of system integration, verification and validation plans for solution architecture from requirements

3.2 Develop systems integration, verification and validation plans for complex systems to ensure viable integration process

3.3 Manage system integration plan and diagnose complex faults

3.4 Document fault conditions, report to appropriate person and follow up corrective actions

3.5 Prepare evidence for customer acceptance and certification of system integration management plan

3.6 Plan and manage a transition to operational activity for the solution architecture

4. Manage solution implementation and notify stakeholder groups

4.1 Produce final project management requirements against solution architecture plan and notify stakeholder groups of impending implementation

4.2 Evaluate impact of proposed project solutions on customers and enterprise

4.3 Manage solution architecture activities as part of overall project plan and monitor solution architecture risks

4.4 Manage amendments to solution architecture processes to meet needs of the project and apply necessary corrective actions

Evidence of the ability to:

prepare an architecture plan exploring a range of alternative solutions

develop interface requirements for effective solutions across multiple architectures

manage solution architecture systems integration

analyse impact of proposed project solutions on customers and enterprise

prepare evidence for customer acceptance and certification of system integration management plan

produce final project management requirements.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify and define features and operating requirements of complex systems, key performance indicators (KPIs) and service level agreements

outline information required to define solution architecture and impacts in line with organisational processes

summarise interdisciplinary concepts across multiple architectures

outline issues and challenges occurring with system changes

explain legislation, codes of practice and other formal agreements directly impacting system integration

summarise manufacturer’s requirements for operation of systems equipment

identify and critique relevant organisational policies and procedures

outline performance and integration requirements

summarise solutions architecture alternatives

summarise specific work health and safety (WHS) requirements that impact activity in terms of safety of self and the public

outline system element interfaces for solution architecture

explain system integration plans

explain validation plans.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the Telecommunications – Telecommunications Networks Engineering field of work and include access to:

a site where development and management of solution architecture systems integration across multiple architectures may be conducted

software tools currently used in industry

vendor products, specifications, equipment and enterprise policy required for the activity.

Assessors must satisfy NVR/AQTF assessor requirements.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

ELEMENT

PERFORMANCE CRITERIA

Elements describe the essential outcomes.

Performance criteria describe the performance needed to demonstrate achievement of the element.

1. Develop plan to support architectural design process

1.1 Prepare a plan with techniques to support the architectural design process and communicate the solution to different stakeholder groups

1.2 Critically analyse business options to support architectural design trade-offs for optimal design solution

1.3 Evaluate strengths and weaknesses of relevant technologies in context of the requirement

1.4 Assess a range of interdisciplinary concept ideas and effect their attributes would have on the design requirements

1.5 Prepare a solutions architecture plan detailing all possible solutions

2. Develop interface requirements for effective solutions across multiple architectures

2.1 Evaluate system element interfaces and sources of complexity for interface management of the system across multiple architectures

2.2 Develop a process and appropriate techniques to be adopted for interface management of system elements for solution architecture

2.3 Produce a control process of system element interfaces of the management system

2.4 Liaise and arbitrate between stakeholders where there are conflicts in definition of interfaces

3. Manage solution architecture systems integration

3.1 Evaluate suitability of system integration, verification and validation plans for solution architecture from requirements

3.2 Develop systems integration, verification and validation plans for complex systems to ensure viable integration process

3.3 Manage system integration plan and diagnose complex faults

3.4 Document fault conditions, report to appropriate person and follow up corrective actions

3.5 Prepare evidence for customer acceptance and certification of system integration management plan

3.6 Plan and manage a transition to operational activity for the solution architecture

4. Manage solution implementation and notify stakeholder groups

4.1 Produce final project management requirements against solution architecture plan and notify stakeholder groups of impending implementation

4.2 Evaluate impact of proposed project solutions on customers and enterprise

4.3 Manage solution architecture activities as part of overall project plan and monitor solution architecture risks

4.4 Manage amendments to solution architecture processes to meet needs of the project and apply necessary corrective actions

Evidence of the ability to:

prepare an architecture plan exploring a range of alternative solutions

develop interface requirements for effective solutions across multiple architectures

manage solution architecture systems integration

analyse impact of proposed project solutions on customers and enterprise

prepare evidence for customer acceptance and certification of system integration management plan

produce final project management requirements.

Note: If a specific volume or frequency is not stated, then evidence must be provided at least once.

To complete the unit requirements safely and effectively, the individual must:

identify and define features and operating requirements of complex systems, key performance indicators (KPIs) and service level agreements

outline information required to define solution architecture and impacts in line with organisational processes

summarise interdisciplinary concepts across multiple architectures

outline issues and challenges occurring with system changes

explain legislation, codes of practice and other formal agreements directly impacting system integration

summarise manufacturer’s requirements for operation of systems equipment

identify and critique relevant organisational policies and procedures

outline performance and integration requirements

summarise solutions architecture alternatives

summarise specific work health and safety (WHS) requirements that impact activity in terms of safety of self and the public

outline system element interfaces for solution architecture

explain system integration plans

explain validation plans.

Gather evidence to demonstrate consistent performance in conditions that are safe and replicate the workplace. Noise levels, production flow, interruptions and time variances should be typical of those experienced in the Telecommunications – Telecommunications Networks Engineering field of work and include access to:

a site where development and management of solution architecture systems integration across multiple architectures may be conducted

software tools currently used in industry

vendor products, specifications, equipment and enterprise policy required for the activity.

Assessors must satisfy NVR/AQTF assessor requirements.

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Prepare a plan with techniques to support the architectural design process and communicate the solution to different stakeholder groups 
Critically analyse business options to support architectural design trade-offs for optimal design solution 
Evaluate strengths and weaknesses of relevant technologies in context of the requirement 
Assess a range of interdisciplinary concept ideas and effect their attributes would have on the design requirements 
Prepare a solutions architecture plan detailing all possible solutions 
Evaluate system element interfaces and sources of complexity for interface management of the system across multiple architectures 
Develop a process and appropriate techniques to be adopted for interface management of system elements for solution architecture 
Produce a control process of system element interfaces of the management system 
Liaise and arbitrate between stakeholders where there are conflicts in definition of interfaces 
Evaluate suitability of system integration, verification and validation plans for solution architecture from requirements 
Develop systems integration, verification and validation plans for complex systems to ensure viable integration process 
Manage system integration plan and diagnose complex faults 
Document fault conditions, report to appropriate person and follow up corrective actions 
Prepare evidence for customer acceptance and certification of system integration management plan 
Plan and manage a transition to operational activity for the solution architecture 
Produce final project management requirements against solution architecture plan and notify stakeholder groups of impending implementation 
Evaluate impact of proposed project solutions on customers and enterprise 
Manage solution architecture activities as part of overall project plan and monitor solution architecture risks 
Manage amendments to solution architecture processes to meet needs of the project and apply necessary corrective actions 

Forms

Assessment Cover Sheet

ICTTEN805 - Manage solution architecture and impacts in line with organisational processes
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

ICTTEN805 - Manage solution architecture and impacts in line with organisational processes

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: