Assessor Resource

LGAGOVA603B
Develop a risk management strategy for council assets

Assessment tool

Version 1.0
Issue Date: April 2024


This unit supports the attainment of skills and knowledge required for competent workplace performance in councils of all sizes. Knowledge of the legislation and regulations within which councils must operate is essential. The unique nature of councils, as a tier of government directed by elected members and reflecting the needs of local communities, must be appropriately reflected.

This unit covers developing a risk management plan for council assets. It incorporates an assessment of all potential risks facing council assets and the development of strategies and plans to mitigate all risk situations through elimination, isolation or protection. It is appropriate for senior managers.

You may want to include more information here about the target group and the purpose of the assessments (eg formative, summative, recognition)

Prerequisites

Not applicable.


Employability Skills

This unit contains employability skills.




Evidence Required

List the assessment methods to be used and the context and resources required for assessment. Copy and paste the relevant sections from the evidence guide below and then re-write these in plain English.

Overview of assessment requirements

A person who demonstrates competency in this unit will be able to perform the outcomes described in the Elements to the required performance level detailed in the Performance Criteria. The knowledge and skill requirements described in the Range Statement must also be demonstrated. For example, knowledge of the legislative framework and safe work practices that underpin the performance of the unit are also required to be demonstrated.

Critical aspects of evidence to be considered

The demonstrated ability to:

examine all factors systematically in identifying risk and determining the consequence of failure

develop a risk management plan to eliminate, isolate and protect people and assets in the event of a potential negative event occurring

monitor risk reduction activities and the implementation of failure management plans

Context of assessment

Competency is demonstrated by performance of all stated criteria, with particular attention to the critical aspects and the knowledge and skills elaborated in the Evidence Guide, and within the scope of the Range Statement.

Assessment must take account of the endorsed Assessment Guidelines in the Local Government Training Package.

Assessment of performance requirements in this unit should be undertaken in an actual workplace or simulated environment.

Assessment should reinforce the integration of the key competencies for the particular AQF level. Refer to the key competency levels at the end of this unit.

Relationship to other units(prerequisite or co-requisite units)

To enable holistic assessment this unit may be assessed with other units that form part of the job role.

Method of assessment

The following assessment methods are suggested:

observation of the learner performing a range of workplace tasks over sufficient time to demonstrate handling of a range of contingencies

written and/or oral questioning to assess knowledge and understanding

completion of workplace documentation

third-party reports from experienced practitioners

completion of self-paced learning materials including personal reflection and feedback from trainer, coach or supervisor

Evidence required for demonstration of consistent performance

Evidence should be collected over a set period of time that is sufficient to include dealings with an appropriate range and variety of situations.

Resource implications

The learner and trainer should have access to appropriate documentation and resources normally used in the workplace.


Submission Requirements

List each assessment task's title, type (eg project, observation/demonstration, essay, assingnment, checklist) and due date here

Assessment task 1: [title]      Due date:

(add new lines for each of the assessment tasks)


Assessment Tasks

Copy and paste from the following data to produce each assessment task. Write these in plain English and spell out how, when and where the task is to be carried out, under what conditions, and what resources are needed. Include guidelines about how well the candidate has to perform a task for it to be judged satisfactory.

This describes the essential skills and knowledge and their level, required for this unit

Required Skills

analytical

evaluation

decision making

problem solving

communication

consultation

Required Knowledge

insurance options to offset risks

public liability

occupational health and safety regulations

local government political system

possible social consequences

environmental legislation and regulations

quality management

custodial responsibility

legal liabilities

risk management processes and techniques

calculation of current risk cost

relevant computer software applications

strategic, tactical and operational plans of council

disaster, emergency and evacuation plans

organisational capacity to deal with incidents or events

The Range Statement relates to the Unit of Competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording in the Performance Criteria is detailed below.

Risk management means:

the process of identifying potential negative events and developing plans to minimise the likelihood of the negative event occurring and/or minimise the consequences should it occur

Council assets may include:

all non-current structures or items of plant or equipment that provide service potential or future economic benefit

roads

bridges

water supply systems

parks and gardens

drainage systems

sewerage systems

buildings

plant and equipment

Possible failure modes may include:

lack of capacity

inefficiency

obsolescence

level of service falling below acceptable levels

structural integrity (mortal failure)

redundancy (lack of utilisation)

operator errors

Consequence of failure may include:

loss of life

public and staff safety and risk (WorkCover and public liability)

damage to private property

effect on business

effect on essential services

damage to other utilities' property

political sensitivity to the organisation (statutory obligations)

disruption to traffic

disruption to public transport

inconvenience to the community

high repair costs

availability of repair materials

cost of providing the service while the asset is not functioning

number of people who will be affected by the failure

loss through replacement instead of rehabilitation in case of total failure

damage to the environment

actual cost of the repair

multiplier effects on the community (effects on elderly, children and risk groups)

public image/public relations loss

Acceptable level of risk may be influenced by:

profile of service

political impact

social impact

financial impact

Risk register refers to:

a register of all identified risks and documentation of the strategies and plans in place to deal with any incident or event that occurs

Risk management activities may include:

operate asset differently

maintain asset differently

operator training

demand management

Relevant internal and external parties may include:

insurers

management

service purchasers

service providers

Risks may include:

occupational health and safety

environmental

service failure

financial or economic loss

failure or damage to property and equipment

industrial disputation

professional incompetence

natural disasters

security failure

system failures

political events

Near miss may include:

an event or incident which, in other circumstances, may have resulted in an injury to a person, damage to property or some other negative impact on the council or community

Copy and paste from the following performance criteria to create an observation checklist for each task. When you have finished writing your assessment tool every one of these must have been addressed, preferably several times in a variety of contexts. To ensure this occurs download the assessment matrix for the unit; enter each assessment task as a column header and place check marks against each performance criteria that task addresses.

Observation Checklist

Tasks to be observed according to workplace/college/TAFE policy and procedures, relevant legislation and Codes of Practice Yes No Comments/feedback
Council's strategic position and policy on risk management are interpreted. 
Council assets are audited to identify risk management context and potential areas of risk. 
Risk potential is determined by assessment of possible failure modes. 
Consequence of failure is determined taking into account financial, technical, social and political factors. 
Risk cost to council is quantified taking into account both major and minor failures. 
Acceptable risk level is evaluated. 
Organisational capacity to reduce or control the likelihood of incidents and consequences is analysed. 
Risk register is developed incorporating a probability/consequence matrix. 
Risk management policies and activities are clearly documented and communicated to all relevant personnel. 
Liaison and communication structures are established with relevant internal and external parties. 
Risks are examined in terms of the criteria in the risk management plan. 
Risks classified as acceptable are placed on a monitor/review watch list. 
Risks that are unacceptable are eliminated wherever practicable. 
Risks that cannot be eliminated are minimised in accordance with the risk management plan. 
Strategies for risk minimisation are documented. 
Procedures are implemented to review risk management activities regularly. 
Activities that do not achieve their objectives and performance outcomes are examined to determine cause. 
Incidents that occur that indicate a near miss are analysed and the risk management plan is reviewed. 
Council's strategic position and policy on risk management are interpreted. 
Council assets are audited to identify risk management context and potential areas of risk. 
Risk potential is determined by assessment of possible failure modes. 
Consequence of failure is determined taking into account financial, technical, social and political factors. 
Risk cost to council is quantified taking into account both major and minor failures. 
Acceptable risk level is evaluated. 
Organisational capacity to reduce or control the likelihood of incidents and consequences is analysed. 
Risk register is developed incorporating a probability/consequence matrix. 
Risk management policies and activities are clearly documented and communicated to all relevant personnel. 
Liaison and communication structures are established with relevant internal and external parties. 
Risks are examined in terms of the criteria in the risk management plan. 
Risks classified as acceptable are placed on a monitor/review watch list. 
Risks that are unacceptable are eliminated wherever practicable. 
Risks that cannot be eliminated are minimised in accordance with the risk management plan. 
Strategies for risk minimisation are documented. 
Procedures are implemented to review risk management activities regularly. 
Activities that do not achieve their objectives and performance outcomes are examined to determine cause. 
Incidents that occur that indicate a near miss are analysed and the risk management plan is reviewed. 

Forms

Assessment Cover Sheet

LGAGOVA603B - Develop a risk management strategy for council assets
Assessment task 1: [title]

Student name:

Student ID:

I declare that the assessment tasks submitted for this unit are my own work.

Student signature:

Result: Competent Not yet competent

Feedback to student

 

 

 

 

 

 

 

 

Assessor name:

Signature:

Date:


Assessment Record Sheet

LGAGOVA603B - Develop a risk management strategy for council assets

Student name:

Student ID:

Assessment task 1: [title] Result: Competent Not yet competent

(add lines for each task)

Feedback to student:

 

 

 

 

 

 

 

 

Overall assessment result: Competent Not yet competent

Assessor name:

Signature:

Date:

Student signature:

Date: